IDOT contract 61K85 bid tabulation

Rolling Meadows, section 21-00126-00-PV. Let by Illinois DOT on July 31, 2026, Cook, District 01. 10 bids received; low bid $2,813,311 by Plote Construction, Inc..

Owner
Illinois DOT
Letting
31 JUL 2026
Pay items
141
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Plote Construction, Inc.$2,813,311Low
2A Lamp Concrete Contractors, Inc.$2,888,000+3.0%
3Builders Paving, LLC$2,928,888+4.0%
4R. W. Dunteman Company$2,962,000+5.0%
5K-Five Construction Corporation$3,018,551+7.0%
6Campanella and Sons, Inc.$3,084,064+10%
7Schroeder Asphalt Services, Inc.$3,101,187+10%
8Martam Construction Incorporated$3,177,667+13%
9PirTano Construction Co., LLC$3,431,252+22%
10Alliance Contractors, Inc.$3,458,087+23%
IDOT contract 61K85: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Plote Construction, Inc.2. A Lamp Concrete Contractors, Inc.3. Builders Paving, LLC4. R. W. Dunteman Company5. K-Five Construction Corporation6. Campanella and Sons, Inc.
1T-cornus mas TF 2-1/2 (B2001422)EACH6$709.00$1,031.25$709.00$709.00$708.00$709.00
2T-malus PF TF 2-1/2 (B2004120)EACH8$471.00$618.75$471.00$471.00$471.00$471.00
3T-syrg RT IS TF 2-1/2 (B2006320)EACH6$471.00$618.75$471.00$471.00$471.00$471.00
4S-diervilla sess 2'C (C2C02424)EACH69$82.00$84.00$82.00$82.00$82.00$82.00
5S-rosa rug FDH CG 5G (C2C077G5)EACH51$78.00$78.00$78.00$78.00$78.00$78.00
6E-junip virg TR 6' (D2001715)EACH45$359.00$495.00$359.00$359.00$359.00$359.00
7E-thuja occ smarag 5' (D2003776)EACH44$271.00$330.00$271.00$271.00$271.00$271.00
8P PL ornament T gal P (K0012990)UNIT3.90$2,800.00$2,500.00$2,800.00$2,800.00$2,800.00$2,800.00
9P PL prairie T 3" pot (K0013003)UNIT0.10$2,007.00$6,000.00$2,007.00$2,007.00$2,007.00$2,007.00
10Conc truck washout (XX006821)LS1$4,000.00$1,000.00$5,000.00$3,000.00$2,500.00$100.00
11Shrubs special (XX008639)EACH78$97.00$112.00$97.00$97.00$97.00$97.00
12EM veh P S LSC 20 3C (X0324085)LF217$1.50$1.50$2.62$1.50$2.62$1.50
13Serv instl GR MT MTR (X1400150)EACH1$5,870.00$5,870.00$4,966.62$5,870.00$4,966.62$5,870.00
14Term fiber in cabinet (X1400217)EACH8$252.00$252.00$142.18$252.00$142.18$252.00
15Ped signal post 10 FT (X1400367)EACH1$1,800.00$1,790.00$1,583.39$1,790.00$1,583.39$1,790.00
16Ped signal post 5 FT (X1400378)EACH1$1,600.00$1,553.00$1,244.71$1,553.00$1,244.71$1,553.00
17Explor trench SPL (X2130010)LF50$75.00$25.00$90.00$65.00$50.00$150.00
18Imprtd THPL crosswalk (X2800001)SY110$270.00$265.00$265.00$265.00$265.00$265.00
19Temp access- priv ent (X4021000)EACH14$250.00$200.00$250.00$433.19$150.00$572.93
20Temp access- com ent (X4022000)EACH12$750.00$275.00$300.00$587.15$150.00$1,145.81
21Temp access- road (X4023000)EACH5$100.00$550.00$350.00$1,104.29$150.00$1,145.73
22Temporary patching (X4420210)SY186$40.00$45.00$275.00$38.83$25.00$89.52
23Traf cont & prot SPL (X7010216)LS1$17,000$148,975$12,749$94,743$55,000$23,000
24Temp info signing (X7200061)SF52$18.00$18.00$18.00$15.00$18.00$18.00
25Conduit splice (X8100105)EACH1$850.00$835.00$249.45$835.00$249.45$835.00
26Splice fiber in cab (X8710317)EACH8$185.00$183.00$129.25$183.00$129.25$183.00
27Accessible ped signal (X8760200)EACH4$3,100.00$3,022.00$2,150.25$3,022.00$2,150.25$3,022.00
28Conc FDN TY A 12D (X8780012)LF8$525.00$524.80$290.15$524.80$290.15$524.80
29Temp TR signal timing (X8900104)EACH4$1,500.00$1,465.00$385.00$1,465.00$385.00$1,465.00
30Construction layout (Z0013798)LS1$30,000$29,900$29,900$30,000$40,000$39,000
31Dust control watering (Z0019600)UNIT65$10.00$1.00$50.00$37.71$10.00$50.00
32RE-optimize TR sig sys 2 (Z0033046)EACH1$2,500.00$2,455.00$2,271.62$2,455.00$2,271.62$2,455.00
33Tree trunk protection (20101100)EACH41$150.00$180.00$150.00$100.00$150.00$150.00
34Tree root pruning (20101200)EACH41$85.00$200.00$85.00$105.00$85.00$85.00
35Tree prun 1-10 (20101300)EACH19$75.00$100.00$75.00$50.00$75.00$75.00
36Tree prun over 10 (20101350)EACH22$125.00$350.00$125.00$100.00$125.00$125.00
37Earth excavation (20200100)CY4,247$48.00$57.25$60.00$55.80$58.00$50.00
38Rem & disp uns matl (20201200)CY1,447$50.00$30.00$60.00$62.03$70.00$0.01
39Trench backfill (20800150)CY92$64.00$64.00$103.00$65.00$23.00$80.00
40Geotech fab F/GR stab (21001000)SY9,693$2.50$1.00$2.00$2.21$1.50$2.80
41Topsoil F & P 4 (21101615)SY7,128$6.00$6.00$6.00$6.00$6.00$6.00
42Seeding CL 2A (25000210)ACRE1.48$3,313.00$2,500.00$3,313.00$3,313.00$3,313.00$3,313.00
43Nitrogen fert nutr (25000400)LB148$3.00$5.00$3.00$3.00$3.00$3.00
44Phosphorus fert nutr (25000500)LB148$3.00$5.00$3.00$3.00$3.00$3.00
45Potassium fert nutr (25000600)LB148$3.00$5.00$3.00$3.00$3.00$3.00
46Erosion contr blanket (25100630)SY7,128$1.40$1.40$1.40$1.40$1.40$1.40
47Temp eros contr seed (28000250)LB148$4.00$3.00$4.00$4.00$4.00$4.00
48Perimeter eros bar (28000400)LF867$2.10$4.00$5.10$2.10$2.10$2.10
49Inlet filters (28000510)EACH48$235.00$150.00$150.00$235.00$185.00$235.00
50Temp eros contr blank (28001100)SY7,128$1.30$0.80$1.30$1.30$1.30$1.30
51Agg subgrade improve (30300001)CY647$50.00$20.00$50.00$81.12$97.00$158.12
52Agg subgrade impr 12 (30300112)SY9,693$25.00$21.35$28.00$19.21$22.00$31.00
53Sub gran mat B 4 (31101200)SY2,005$10.00$6.00$6.00$0.33$1.00$20.55
54Sub gran mat B 6 (31101400)SY1,586$11.00$14.00$11.00$16.14$8.00$15.66
55Agg base cse B 6 (35101800)SY1,607$11.00$18.00$13.00$23.57$23.00$18.47
56Bit matls PR CT (40600275)LB26,050$0.01$0.01$0.01$0.01$0.01$0.01
57Bit matls tack CT (40600290)LB2,610$0.01$0.01$0.01$0.50$0.01$0.01
58Long joint sealant (40600370)LF3,756$5.25$4.93$4.93$7.86$4.77$7.90
59HMA SC IL-9.5 D N50 (40604060)TON318$210.00$107.00$150.00$137.26$155.00$155.00
60HMA pavt FD 6 (40701801)SY9,693$32.00$34.25$33.00$33.05$30.00$32.50
61Protective coat (42001300)SY2,522$1.00$0.01$0.01$0.01$0.01$1.00
62PCC driveway pavt 6 (42300200)SY361$95.00$83.00$72.00$70.21$70.00$100.00
63PCC driveway pavt 8 (42300400)SY623$120.00$104.50$81.00$82.99$85.00$130.00
64PC conc sidewalk 5 (42400200)SF4,475$11.00$9.00$10.00$10.47$9.00$9.00
65PC conc sidewalk 8 (42400410)SF1,895$15.00$12.00$12.00$12.31$12.00$12.00
66Detectable warnings (42400800)SF498$45.00$30.00$32.00$42.50$25.00$75.00
67Pavement rem (44000100)SY9,778$10.00$18.25$12.00$7.88$13.00$16.00
68HMA surf rem 2 (44000157)SY508$25.00$17.50$20.00$14.07$28.00$28.00
69Drive pavement rem (44000200)SY1,097$20.00$19.50$23.00$24.26$16.00$13.29
70Comb curb gutter rem (44000500)LF6,759$6.50$4.00$7.00$6.30$8.00$5.99
71Sidewalk rem (44000600)SF17,939$1.75$1.50$2.50$1.70$2.00$1.00
72Storm sew CL A 1 12 (550A0050)LF845$95.00$95.00$104.00$110.00$165.00$94.26
73Storm sewer rem 12 (55100500)LF555$16.00$16.00$81.00$10.00$10.00$24.31
74Pipe underdrain 4 SP (60108100)LF2,500$44.00$44.00$26.00$65.00$50.00$36.55
75CB TA 4 dia T1F OL (60200105)EACH2$4,200.00$4,200.00$3,900.00$6,500.00$6,285.00$5,360.36
76CB TA 4 dia T11F&G (60201105)EACH14$4,400.00$4,400.00$4,200.00$6,800.00$6,550.00$5,572.63
77CB TA 4 dia T11V F&G (60201110)EACH2$4,400.00$4,400.00$4,200.00$6,900.00$6,550.00$5,573.40
78Man TA 4 dia T1F CL (60218400)EACH4$4,200.00$4,200.00$3,200.00$8,500.00$6,285.00$5,473.60
79Inlets TA T1F OL (60234200)EACH2$2,300.00$2,300.00$1,875.00$1,600.00$3,150.00$2,397.77
80Inlets TA T11F&G (60236800)EACH14$2,500.00$2,500.00$2,625.00$1,800.00$3,485.00$2,611.32
81Inlets TA T11V F&G (60236825)EACH4$2,500.00$2,500.00$2,600.00$1,800.00$3,450.00$2,611.70
82CB adjust (60250200)EACH1$1,300.00$1,300.00$450.00$800.00$496.00$768.80
83Man adjust (60255500)EACH17$1,300.00$1,300.00$450.00$800.00$750.00$768.98
84VV adjust (60265700)EACH4$1,300.00$1,300.00$450.00$800.00$750.00$1,157.56
85Remov manholes (60500040)EACH3$500.00$500.00$575.00$900.00$250.00$1,058.68
86Remov catch bas (60500050)EACH13$500.00$500.00$2,060.00$900.00$250.00$1,059.22
87Remov inlets (60500060)EACH12$300.00$300.00$1,050.00$500.00$65.00$864.82
88Conc curb TB (60600605)LF64$60.00$34.00$30.00$41.23$45.00$75.00
89Comb CC&G TB6.12 (60603800)LF6,871$32.00$28.00$32.00$31.05$33.00$32.00
90Comb CC&G TY B-6.24 (60605000)LF50$70.00$50.00$30.00$80.41$55.00$75.00
91Non SPL waste disposl (66900200)CY640$85.00$90.00$80.00$90.38$148.00$85.00
92Soil disposal analy (66900530)EACH5$945.00$945.00$945.00$945.00$1,450.00$945.00
93Reg sub P-const plan (66901001)LS1$5,400.00$5,400.00$5,400.00$5,400.00$3,100.00$5,400.00
94Reg sub F con report (66901003)LS1$500.00$500.00$500.00$500.00$1,200.00$500.00
95Reg sub mon (66901006)CAL DAY5$865.00$715.00$715.00$715.00$680.00$715.00
96Mobilization (67100100)LS1$160,000$173,274$190,409$177,000$180,000$215,000
97Changeable message SN (70107025)CAL DAY84$30.00$30.00$30.00$30.00$30.00$30.00
98Short term pavt mking (70300100)LF608$2.50$1.00$3.00$3.06$0.01$1.00
99SHRT TRM pavt MK rem (70300150)SF201$10.00$1.00$0.01$3.69$0.01$2.00
100Temp PVT MK line 4 - paint (70300221)LF6,104$0.40$0.40$0.40$0.50$0.40$0.40
101Temp PVT MK line 6 - paint (70300241)LF1,204$0.60$0.60$0.60$0.75$0.60$0.60
102Temp PVT MK line 24 - paint (70300281)LF101$1.75$1.75$1.75$3.00$1.75$1.75
103Sign panel T1 (72000100)SF43$35.00$35.00$35.00$37.50$35.00$35.00
104Remov sin pan assy TA (72400100)EACH6$110.00$110.00$110.00$275.00$110.00$110.00
105Metal post TY A (72900100)LF110$18.00$18.00$18.00$25.00$18.00$18.00
106Metal post TY B (72900200)LF54$18.00$18.00$18.00$25.00$18.00$18.00
107THPL PVT MK LTR & sym (78000100)SF219$5.50$6.00$5.50$5.50$8.50$6.00
108THPL PVT MK line 4 (78000200)LF6,104$0.80$0.93$0.80$0.80$0.96$0.87
109THPL PVT MK line 6 (78000400)LF1,264$1.30$1.50$1.30$1.30$1.45$1.50
110THPL PVT MK line 12 (78000600)LF511$2.60$3.00$2.60$2.60$4.25$3.00
111THPL PVT MK line 24 (78000650)LF101$5.50$6.00$5.50$5.50$8.50$6.00
112PVT MKG rem WTR blast (78300202)SF203$23.00$22.20$22.20$15.00$22.20$22.20
113Undrgrd C galvs 2 (81028200)LF395$50.00$48.60$29.79$48.60$29.79$48.60
114Undrgrd C galvs 3 (81028220)LF48$60.00$58.40$69.12$58.40$69.12$58.40
115Undrgrd C galvs 4 (81028240)LF102$120.00$115.30$73.55$115.30$73.55$115.30
116Handhole (81400100)EACH1$4,100.00$4,007.00$4,183.16$4,007.00$4,183.16$4,007.00
117HD handhole (81400200)EACH1$5,700.00$5,677.00$4,441.66$5,677.00$4,441.66$5,677.00
118Elcbl C signal 14 2C (87301215)LF586$2.00$1.90$2.79$1.90$2.97$1.90
119Elcbl C signal 14 3C (87301225)LF813$2.70$2.70$2.99$2.70$2.99$2.70
120Elcbl C signal 14 5C (87301245)LF535$3.30$3.30$3.41$3.30$3.41$3.30
121Elcbl C signal 14 7C (87301255)LF397$3.70$3.70$3.84$3.70$3.84$3.70
122Elcbl C lead 14 1PR (87301305)LF1,286$2.60$2.60$2.92$2.60$2.92$2.60
123Elcbl C serv 6 2C (87301805)LF209$6.50$6.50$5.66$6.50$5.66$6.50
124Elcbl C egrdc 6 1C (87301900)LF474$3.70$3.70$4.55$3.70$4.55$3.70
125TS post 16 (87501200)EACH2$2,210.00$2,207.00$2,095.04$2,207.00$2,095.04$2,207.00
126TS post 18 (87501400)EACH1$2,300.00$2,245.00$2,131.61$2,245.00$2,131.61$2,245.00
127Conc FDN TY A (87800100)LF12$370.00$367.80$312.15$367.80$312.15$367.80
128Drill EX handhole (87900200)EACH5$1,100.00$1,097.00$699.96$1,097.00$699.96$1,097.00
129SH LED 1F 3S BM (88030050)EACH2$1,150.00$1,144.00$1,105.86$1,144.00$1,105.86$1,144.00
130SH LED 1F 5S BM (88030100)EACH2$1,500.00$1,402.00$1,436.84$1,402.00$1,436.84$1,402.00
131Inductive loop detect (88500100)EACH4$215.00$212.00$160.60$212.00$160.60$212.00
132Det loop T1 (88600100)LF287$35.00$34.20$31.26$34.20$31.26$34.20
133Temp TR sig install (89000100)EACH1$70,000$69,712$89,939$69,712$89,939$78,712
134Reloc EX TS equip (89501250)EACH1$4,400.00$4,320.00$5,544.71$4,320.00$5,544.71$4,320.00
135Mod EX contr (89502200)EACH1$2,015.00$2,015.00$998.31$2,015.00$998.31$2,015.00
136Rem elcbl FR con (89502300)LF2,026$0.70$0.70$2.24$0.70$2.24$0.70
137Rem & RE elcbl FR con (89502350)LF390$2.20$2.20$3.36$2.20$3.36$2.20
138Remov EX TS equip (89502375)EACH1$2,880.00$2,880.00$3,586.47$2,880.00$3,586.47$2,880.00
139Rebuild EX handhole (89502376)EACH1$6,600.00$6,597.00$2,618.24$6,597.00$2,618.24$6,597.00
140Remov EX handhole (89502380)EACH2$720.00$720.00$896.62$720.00$896.62$720.00
141Remov EX conc FDN (89502385)EACH3$720.00$720.00$896.62$720.00$896.62$720.00
IDOT contract 61K85: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy