Hanover Park, section 19-00070-00-BT. Let by Illinois DOT on August 1, 2025, Dupage, District 01. 7 bids received; low bid $1,424,943 by A Lamp Concrete Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 92
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A Lamp Concrete Contractors, Inc. | $1,424,943 | Low |
| 2 | Martam Construction Incorporated | $1,452,847 | +2.0% |
| 3 | Alliance Contractors, Inc. | $1,500,467 | +5.0% |
| 4 | Schroeder Asphalt Services, Inc. | $1,560,708 | +10% |
| 5 | Acura Inc. | $1,615,000 | +13% |
| 6 | Copenhaver Construction, Inc. | $1,635,257 | +15% |
| 7 | MYS, Incorporated | $1,977,107 | +39% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A Lamp Concrete Contractors, Inc. | 2. Martam Construction Incorporated | 3. Alliance Contractors, Inc. | 4. Schroeder Asphalt Services, Inc. | 5. Acura Inc. | 6. Copenhaver Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | T-acerx fre AF 2.50 (A2000192) | EACH | 8 | $450.00 | $522.08 | $502.00 | $565.00 | $550.00 | $900.00 |
| 2 | T-gled tri-I SK 2-1/2 (A2004820) | EACH | 8 | $450.00 | $499.20 | $480.00 | $565.00 | $520.00 | $900.00 |
| 3 | T-quercus macr 2 (A2006716) | EACH | 8 | $450.00 | $444.08 | $427.00 | $565.00 | $450.00 | $700.00 |
| 4 | T-syrg pek M TF 2-1/2 (B2006120) | EACH | 8 | $450.00 | $576.16 | $554.00 | $565.00 | $590.00 | $900.00 |
| 5 | Washout basin (X0326806) | LS | 1 | $1,000.00 | $1,333.40 | $750.00 | $1,750.00 | $3,000.00 | $2,000.00 |
| 6 | Fold down bollards (X0350805) | EACH | 3 | $2,183.00 | $2,270.32 | $1,500.00 | $2,500.00 | $3,200.00 | $3,300.00 |
| 7 | FR & lids adjust SPL (X6030310) | EACH | 1 | $1,100.00 | $822.63 | $1,000.00 | $2,300.00 | $2,500.00 | $900.00 |
| 8 | Fence removal (X6640104) | LF | 19 | $38.00 | $39.52 | $100.00 | $50.00 | $33.00 | $80.00 |
| 9 | Change message SN SPL (X7010238) | CAL MO | 12 | $1.00 | $1,040.00 | $1,000.00 | $1,450.00 | $1,250.00 | $1,400.00 |
| 10 | Temp info signing (X7200061) | SF | 129 | $20.00 | $15.60 | $15.00 | $27.50 | $22.00 | $30.00 |
| 11 | Reloc EX signs (X7240500) | EACH | 4 | $250.00 | $520.00 | $500.00 | $700.00 | $500.00 | $700.00 |
| 12 | Maint lighting systm (X8000003) | CAL MO | 2 | $1,500.00 | $2,433.87 | $3,030.00 | $1,800.00 | $3,500.00 | $1,500.00 |
| 13 | Construction layout (Z0013798) | LS | 1 | $9,900.00 | $12,887 | $9,900.00 | $15,000 | $24,000 | $33,000 |
| 14 | Lum sfty CBL assembly (Z0033020) | EACH | 1 | $250.00 | $245.78 | $638.75 | $285.00 | $700.00 | $250.00 |
| 15 | Tree remov 6-15 (20100110) | UNIT | 249 | $24.00 | $24.96 | $24.00 | $27.00 | $33.00 | $30.00 |
| 16 | Tree remov over 15 (20100210) | UNIT | 18 | $32.00 | $33.28 | $32.00 | $38.00 | $50.00 | $45.00 |
| 17 | Temporary fence (20101000) | LF | 360 | $1.00 | $3.12 | $3.00 | $5.75 | $3.30 | $3.00 |
| 18 | Supple watering (20101700) | UNIT | 40 | $0.10 | $52.00 | $50.00 | $115.00 | $60.00 | $0.01 |
| 19 | Earth excavation (20200100) | CY | 4,444 | $5.00 | $8.10 | $1.00 | $49.00 | $45.00 | $40.00 |
| 20 | Rem & disp uns matl (20201200) | CY | 2,132 | $5.00 | $8.11 | $1.00 | $55.00 | $40.00 | $40.00 |
| 21 | Trench backfill (20800150) | CY | 27 | $62.00 | $56.62 | $1.00 | $26.00 | $30.00 | $65.00 |
| 22 | Geotech fab F/GR stab (21001000) | SY | 173 | $2.60 | $3.73 | $1.00 | $5.00 | $5.00 | $3.00 |
| 23 | Topsoil F & P 4 (21101615) | SY | 3,266 | $0.10 | $6.24 | $6.00 | $6.70 | $6.50 | $4.00 |
| 24 | Nitrogen fert nutr (25000400) | LB | 61 | $1.00 | $3.12 | $3.00 | $3.40 | $3.00 | $1.00 |
| 25 | Potassium fert nutr (25000600) | LB | 61 | $1.00 | $3.12 | $3.00 | $3.40 | $3.00 | $1.00 |
| 26 | Sodding salt tolerant (25200110) | SY | 3,266 | $16.40 | $10.40 | $10.00 | $16.00 | $11.00 | $14.00 |
| 27 | Supple watering (25200200) | UNIT | 177 | $1.00 | $0.01 | $0.01 | $57.00 | $1.00 | $0.01 |
| 28 | Temp eros contr seed (28000250) | LB | 75 | $1.00 | $5.20 | $5.00 | $2.00 | $6.00 | $0.01 |
| 29 | Perimeter eros bar (28000400) | LF | 3,670 | $1.00 | $2.08 | $2.00 | $3.15 | $2.20 | $3.00 |
| 30 | Inlet filters (28000510) | EACH | 22 | $15.00 | $222.56 | $25.00 | $220.00 | $290.00 | $200.00 |
| 31 | Stone riprap CL A4 (28100107) | SY | 25 | $81.25 | $143.30 | $60.00 | $180.00 | $180.00 | $200.00 |
| 32 | Filter fabric (28200200) | SY | 25 | $7.50 | $2.34 | $1.00 | $10.00 | $6.00 | $10.00 |
| 33 | Agg subgrade improve (30300001) | CY | 58 | $20.00 | $122.03 | $45.60 | $68.00 | $50.00 | $60.00 |
| 34 | Sub gran mat B 12 (31101810) | SY | 532 | $29.00 | $43.99 | $15.60 | $30.00 | $22.00 | $19.00 |
| 35 | Agg base cse B 4 (35101600) | SY | 405 | $10.25 | $37.29 | $5.20 | $12.50 | $12.00 | $10.00 |
| 36 | Agg base cse B 8 (35102000) | SY | 4,375 | $17.85 | $43.39 | $25.00 | $20.70 | $14.00 | $22.00 |
| 37 | PCC base cse W 6 (35400100) | SY | 532 | $99.00 | $72.73 | $94.90 | $89.00 | $70.00 | $100.00 |
| 38 | HMA base cse 6 (35501308) | SY | 48 | $50.00 | $92.06 | $85.00 | $100.00 | $185.00 | $135.00 |
| 39 | Bit matls PR CT (40600275) | LB | 7,866 | $0.01 | $0.01 | $0.01 | $0.01 | $0.10 | $0.01 |
| 40 | Bit matls tack CT (40600290) | LB | 3,600 | $0.01 | $0.01 | $0.01 | $0.01 | $0.10 | $0.01 |
| 41 | HMA surf rem butt JT (40600982) | SY | 164 | $13.74 | $16.25 | $15.00 | $12.00 | $22.00 | $13.00 |
| 42 | P HMA BC IL-4.75 N50 (40603200) | TON | 224 | $140.00 | $178.70 | $165.00 | $140.00 | $212.00 | $149.00 |
| 43 | HMA SC IL-9.5 D N50 (40604060) | TON | 839 | $110.00 | $124.55 | $115.00 | $108.00 | $129.00 | $108.00 |
| 44 | PCC driveway pavt 8 (42300400) | SY | 357 | $142.00 | $98.71 | $150.00 | $112.00 | $95.00 | $130.00 |
| 45 | PC conc sidewalk 5 (42400200) | SF | 8,335 | $9.50 | $9.30 | $24.00 | $11.25 | $12.00 | $12.00 |
| 46 | Detectable warnings (42400800) | SF | 305 | $35.00 | $35.51 | $50.00 | $46.50 | $45.00 | $35.00 |
| 47 | HMA surf rem 2 (44000157) | SY | 5,098 | $3.91 | $4.60 | $4.25 | $2.75 | $5.75 | $3.00 |
| 48 | Drive pavement rem (44000200) | SY | 578 | $18.00 | $11.72 | $20.00 | $15.00 | $14.00 | $16.00 |
| 49 | Comb curb gutter rem (44000500) | LF | 774 | $7.30 | $5.40 | $15.00 | $13.50 | $6.00 | $8.00 |
| 50 | Sidewalk rem (44000600) | SF | 15,223 | $1.10 | $1.37 | $2.00 | $3.35 | $2.50 | $2.00 |
| 51 | CL D patch T2 6 (44201717) | SY | 150 | $50.00 | $137.42 | $70.00 | $65.00 | $100.00 | $78.00 |
| 52 | CL D patch T3 6 (44201721) | SY | 150 | $40.00 | $136.68 | $70.00 | $62.00 | $100.00 | $77.00 |
| 53 | CL D patch T4 6 (44201723) | SY | 150 | $30.00 | $135.21 | $70.00 | $60.00 | $100.00 | $75.00 |
| 54 | Pipe culvert remov (50105220) | LF | 124 | $1.00 | $10.52 | $15.00 | $8.00 | $5.00 | $20.00 |
| 55 | Seg conc block wall (52200800) | SF | 825 | $45.25 | $74.13 | $45.00 | $46.00 | $55.00 | $65.00 |
| 56 | P cul CL A 1 12 (542A0217) | LF | 139 | $153.00 | $66.38 | $150.00 | $205.00 | $195.00 | $130.00 |
| 57 | PRC flar end sec 12 (54213657) | EACH | 4 | $4,200.00 | $1,459.44 | $2,000.00 | $1,900.00 | $1,800.00 | $1,700.00 |
| 58 | Storm sew CL A 1 12 (550A0050) | LF | 20 | $206.00 | $146.13 | $150.00 | $205.00 | $195.00 | $190.00 |
| 59 | Storm sewer rem 12 (55100500) | LF | 10 | $27.00 | $17.13 | $50.00 | $6.00 | $5.00 | $50.00 |
| 60 | Fire hydnts to BE MVD (56400100) | EACH | 4 | $7,000.00 | $6,378.95 | $20,000 | $12,500 | $14,000 | $3,100.00 |
| 61 | CB adjust (60250200) | EACH | 4 | $725.00 | $603.30 | $400.00 | $525.00 | $600.00 | $600.00 |
| 62 | Man adjust (60255500) | EACH | 8 | $835.00 | $603.31 | $400.00 | $525.00 | $600.00 | $800.00 |
| 63 | Comb CC&G TB6.12 (60603800) | LF | 353 | $49.00 | $48.15 | $150.00 | $62.00 | $45.00 | $38.00 |
| 64 | Comb CC&G TB6.18 (60604400) | LF | 365 | $52.00 | $55.17 | $190.00 | $62.00 | $45.00 | $39.00 |
| 65 | SPBGR TY A 6FT posts (63000001) | LF | 1,512 | $31.79 | $33.06 | $31.79 | $35.50 | $36.00 | $36.00 |
| 66 | BCK SD prot of GRDRL (63000035) | LF | 1,512 | $13.39 | $13.93 | $13.39 | $15.75 | $45.00 | $28.00 |
| 67 | TR bar TRM T1 SPL tan (63100167) | EACH | 7 | $3,326.00 | $3,459.04 | $3,326.00 | $3,800.00 | $3,500.00 | $4,200.00 |
| 68 | Non SPL waste disposl (66900200) | CY | 360 | $101.00 | $116.98 | $80.80 | $110.00 | $75.00 | $90.00 |
| 69 | Soil disposal analy (66900530) | EACH | 1 | $1,785.00 | $1,856.40 | $1,500.00 | $1,700.00 | $2,500.00 | $2,000.00 |
| 70 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $3,536.00 | $4,000.00 | $4,800.00 | $5,000.00 | $4,000.00 |
| 71 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $520.00 | $500.00 | $600.00 | $1,000.00 | $600.00 |
| 72 | Reg sub mon (66901006) | CAL DAY | 25 | $700.00 | $728.00 | $1.00 | $815.00 | $1,200.00 | $500.00 |
| 73 | Mobilization (67100100) | LS | 1 | $85,700 | $87,171 | $103,098 | $20,000 | $96,000 | $107,000 |
| 74 | TR cont & prot 701501 (70102620) | LS | 1 | $323,900 | $95,605 | $1.00 | $200.00 | $6,000.00 | $119,000 |
| 75 | TR cont & prot 701606 (70102625) | LS | 1 | $1.00 | $8,320.00 | $100,370 | $25,000 | $6,000.00 | $100.00 |
| 76 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $1.04 | $1.00 | $100.00 | $1.00 | $100.00 |
| 77 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $1.04 | $1.00 | $100.00 | $18,000 | $100.00 |
| 78 | Sign panel T1 (72000100) | SF | 104 | $25.00 | $39.00 | $37.50 | $33.00 | $44.00 | $35.00 |
| 79 | Teles STL sin support (72800100) | LF | 240 | $20.00 | $26.00 | $25.00 | $19.00 | $21.00 | $21.00 |
| 80 | THPL PVT MK LTR & sym (78000100) | SF | 130 | $7.50 | $9.36 | $7.50 | $8.00 | $10.00 | $19.00 |
| 81 | THPL PVT MK line 4 (78000200) | LF | 4,660 | $0.94 | $0.77 | $0.94 | $1.55 | $0.80 | $2.00 |
| 82 | THPL PVT MK line 6 (78000400) | LF | 256 | $1.42 | $1.51 | $1.42 | $2.15 | $1.60 | $5.00 |
| 83 | THPL PVT MK line 12 (78000600) | LF | 989 | $3.60 | $3.02 | $3.60 | $4.00 | $3.10 | $10.00 |
| 84 | THPL PVT MK line 24 (78000650) | LF | 48 | $7.50 | $6.24 | $7.50 | $8.50 | $7.00 | $20.00 |
| 85 | PVT MKG rem WTR blast (78300202) | SF | 180 | $23.00 | $14.56 | $14.00 | $19.00 | $32.00 | $25.00 |
| 86 | Undrgrd C galvs 4 (81028240) | LF | 32 | $80.00 | $114.46 | $64.71 | $89.00 | $70.00 | $80.00 |
| 87 | UD 2#6 #6G xlpuse 1 (81603035) | LF | 530 | $26.00 | $29.06 | $9.25 | $29.00 | $10.00 | $26.00 |
| 88 | Lum LED rdwy H (82110008) | EACH | 3 | $1,400.00 | $1,054.58 | $1,519.40 | $1,575.00 | $1,600.00 | $1,400.00 |
| 89 | LT P A 50MH 10DA (83004400) | EACH | 3 | $6,820.00 | $7,296.64 | $7,307.98 | $6,900.00 | $8,000.00 | $6,200.00 |
| 90 | LP F M 15BC 10" X 8' (83600365) | EACH | 3 | $1,815.00 | $2,498.34 | $1,683.13 | $1,850.00 | $2,000.00 | $1,650.00 |
| 91 | Bkwy dev TR B 15BC (83800205) | EACH | 1 | $1,760.00 | $808.86 | $1,446.00 | $1,780.00 | $1,600.00 | $1,600.00 |
| 92 | Rebuild EX handhole (89502376) | EACH | 3 | $2,310.00 | $4,157.11 | $2,000.00 | $2,300.00 | $2,500.00 | $2,100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.