IDOT contract 61L46 bid tabulation

Hanover Park, section 19-00070-00-BT. Let by Illinois DOT on August 1, 2025, Dupage, District 01. 7 bids received; low bid $1,424,943 by A Lamp Concrete Contractors, Inc..

Owner
Illinois DOT
Letting
01 AUG 2025
Pay items
92
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1A Lamp Concrete Contractors, Inc.$1,424,943Low
2Martam Construction Incorporated$1,452,847+2.0%
3Alliance Contractors, Inc.$1,500,467+5.0%
4Schroeder Asphalt Services, Inc.$1,560,708+10%
5Acura Inc.$1,615,000+13%
6Copenhaver Construction, Inc.$1,635,257+15%
7MYS, Incorporated$1,977,107+39%
IDOT contract 61L46: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. A Lamp Concrete Contractors, Inc.2. Martam Construction Incorporated3. Alliance Contractors, Inc.4. Schroeder Asphalt Services, Inc.5. Acura Inc.6. Copenhaver Construction, Inc.
1T-acerx fre AF 2.50 (A2000192)EACH8$450.00$522.08$502.00$565.00$550.00$900.00
2T-gled tri-I SK 2-1/2 (A2004820)EACH8$450.00$499.20$480.00$565.00$520.00$900.00
3T-quercus macr 2 (A2006716)EACH8$450.00$444.08$427.00$565.00$450.00$700.00
4T-syrg pek M TF 2-1/2 (B2006120)EACH8$450.00$576.16$554.00$565.00$590.00$900.00
5Washout basin (X0326806)LS1$1,000.00$1,333.40$750.00$1,750.00$3,000.00$2,000.00
6Fold down bollards (X0350805)EACH3$2,183.00$2,270.32$1,500.00$2,500.00$3,200.00$3,300.00
7FR & lids adjust SPL (X6030310)EACH1$1,100.00$822.63$1,000.00$2,300.00$2,500.00$900.00
8Fence removal (X6640104)LF19$38.00$39.52$100.00$50.00$33.00$80.00
9Change message SN SPL (X7010238)CAL MO12$1.00$1,040.00$1,000.00$1,450.00$1,250.00$1,400.00
10Temp info signing (X7200061)SF129$20.00$15.60$15.00$27.50$22.00$30.00
11Reloc EX signs (X7240500)EACH4$250.00$520.00$500.00$700.00$500.00$700.00
12Maint lighting systm (X8000003)CAL MO2$1,500.00$2,433.87$3,030.00$1,800.00$3,500.00$1,500.00
13Construction layout (Z0013798)LS1$9,900.00$12,887$9,900.00$15,000$24,000$33,000
14Lum sfty CBL assembly (Z0033020)EACH1$250.00$245.78$638.75$285.00$700.00$250.00
15Tree remov 6-15 (20100110)UNIT249$24.00$24.96$24.00$27.00$33.00$30.00
16Tree remov over 15 (20100210)UNIT18$32.00$33.28$32.00$38.00$50.00$45.00
17Temporary fence (20101000)LF360$1.00$3.12$3.00$5.75$3.30$3.00
18Supple watering (20101700)UNIT40$0.10$52.00$50.00$115.00$60.00$0.01
19Earth excavation (20200100)CY4,444$5.00$8.10$1.00$49.00$45.00$40.00
20Rem & disp uns matl (20201200)CY2,132$5.00$8.11$1.00$55.00$40.00$40.00
21Trench backfill (20800150)CY27$62.00$56.62$1.00$26.00$30.00$65.00
22Geotech fab F/GR stab (21001000)SY173$2.60$3.73$1.00$5.00$5.00$3.00
23Topsoil F & P 4 (21101615)SY3,266$0.10$6.24$6.00$6.70$6.50$4.00
24Nitrogen fert nutr (25000400)LB61$1.00$3.12$3.00$3.40$3.00$1.00
25Potassium fert nutr (25000600)LB61$1.00$3.12$3.00$3.40$3.00$1.00
26Sodding salt tolerant (25200110)SY3,266$16.40$10.40$10.00$16.00$11.00$14.00
27Supple watering (25200200)UNIT177$1.00$0.01$0.01$57.00$1.00$0.01
28Temp eros contr seed (28000250)LB75$1.00$5.20$5.00$2.00$6.00$0.01
29Perimeter eros bar (28000400)LF3,670$1.00$2.08$2.00$3.15$2.20$3.00
30Inlet filters (28000510)EACH22$15.00$222.56$25.00$220.00$290.00$200.00
31Stone riprap CL A4 (28100107)SY25$81.25$143.30$60.00$180.00$180.00$200.00
32Filter fabric (28200200)SY25$7.50$2.34$1.00$10.00$6.00$10.00
33Agg subgrade improve (30300001)CY58$20.00$122.03$45.60$68.00$50.00$60.00
34Sub gran mat B 12 (31101810)SY532$29.00$43.99$15.60$30.00$22.00$19.00
35Agg base cse B 4 (35101600)SY405$10.25$37.29$5.20$12.50$12.00$10.00
36Agg base cse B 8 (35102000)SY4,375$17.85$43.39$25.00$20.70$14.00$22.00
37PCC base cse W 6 (35400100)SY532$99.00$72.73$94.90$89.00$70.00$100.00
38HMA base cse 6 (35501308)SY48$50.00$92.06$85.00$100.00$185.00$135.00
39Bit matls PR CT (40600275)LB7,866$0.01$0.01$0.01$0.01$0.10$0.01
40Bit matls tack CT (40600290)LB3,600$0.01$0.01$0.01$0.01$0.10$0.01
41HMA surf rem butt JT (40600982)SY164$13.74$16.25$15.00$12.00$22.00$13.00
42P HMA BC IL-4.75 N50 (40603200)TON224$140.00$178.70$165.00$140.00$212.00$149.00
43HMA SC IL-9.5 D N50 (40604060)TON839$110.00$124.55$115.00$108.00$129.00$108.00
44PCC driveway pavt 8 (42300400)SY357$142.00$98.71$150.00$112.00$95.00$130.00
45PC conc sidewalk 5 (42400200)SF8,335$9.50$9.30$24.00$11.25$12.00$12.00
46Detectable warnings (42400800)SF305$35.00$35.51$50.00$46.50$45.00$35.00
47HMA surf rem 2 (44000157)SY5,098$3.91$4.60$4.25$2.75$5.75$3.00
48Drive pavement rem (44000200)SY578$18.00$11.72$20.00$15.00$14.00$16.00
49Comb curb gutter rem (44000500)LF774$7.30$5.40$15.00$13.50$6.00$8.00
50Sidewalk rem (44000600)SF15,223$1.10$1.37$2.00$3.35$2.50$2.00
51CL D patch T2 6 (44201717)SY150$50.00$137.42$70.00$65.00$100.00$78.00
52CL D patch T3 6 (44201721)SY150$40.00$136.68$70.00$62.00$100.00$77.00
53CL D patch T4 6 (44201723)SY150$30.00$135.21$70.00$60.00$100.00$75.00
54Pipe culvert remov (50105220)LF124$1.00$10.52$15.00$8.00$5.00$20.00
55Seg conc block wall (52200800)SF825$45.25$74.13$45.00$46.00$55.00$65.00
56P cul CL A 1 12 (542A0217)LF139$153.00$66.38$150.00$205.00$195.00$130.00
57PRC flar end sec 12 (54213657)EACH4$4,200.00$1,459.44$2,000.00$1,900.00$1,800.00$1,700.00
58Storm sew CL A 1 12 (550A0050)LF20$206.00$146.13$150.00$205.00$195.00$190.00
59Storm sewer rem 12 (55100500)LF10$27.00$17.13$50.00$6.00$5.00$50.00
60Fire hydnts to BE MVD (56400100)EACH4$7,000.00$6,378.95$20,000$12,500$14,000$3,100.00
61CB adjust (60250200)EACH4$725.00$603.30$400.00$525.00$600.00$600.00
62Man adjust (60255500)EACH8$835.00$603.31$400.00$525.00$600.00$800.00
63Comb CC&G TB6.12 (60603800)LF353$49.00$48.15$150.00$62.00$45.00$38.00
64Comb CC&G TB6.18 (60604400)LF365$52.00$55.17$190.00$62.00$45.00$39.00
65SPBGR TY A 6FT posts (63000001)LF1,512$31.79$33.06$31.79$35.50$36.00$36.00
66BCK SD prot of GRDRL (63000035)LF1,512$13.39$13.93$13.39$15.75$45.00$28.00
67TR bar TRM T1 SPL tan (63100167)EACH7$3,326.00$3,459.04$3,326.00$3,800.00$3,500.00$4,200.00
68Non SPL waste disposl (66900200)CY360$101.00$116.98$80.80$110.00$75.00$90.00
69Soil disposal analy (66900530)EACH1$1,785.00$1,856.40$1,500.00$1,700.00$2,500.00$2,000.00
70Reg sub P-const plan (66901001)LS1$3,400.00$3,536.00$4,000.00$4,800.00$5,000.00$4,000.00
71Reg sub F con report (66901003)LS1$500.00$520.00$500.00$600.00$1,000.00$600.00
72Reg sub mon (66901006)CAL DAY25$700.00$728.00$1.00$815.00$1,200.00$500.00
73Mobilization (67100100)LS1$85,700$87,171$103,098$20,000$96,000$107,000
74TR cont & prot 701501 (70102620)LS1$323,900$95,605$1.00$200.00$6,000.00$119,000
75TR cont & prot 701606 (70102625)LS1$1.00$8,320.00$100,370$25,000$6,000.00$100.00
76TR cont & prot 701701 (70102635)LS1$1.00$1.04$1.00$100.00$1.00$100.00
77TR cont & prot 701801 (70102640)LS1$1.00$1.04$1.00$100.00$18,000$100.00
78Sign panel T1 (72000100)SF104$25.00$39.00$37.50$33.00$44.00$35.00
79Teles STL sin support (72800100)LF240$20.00$26.00$25.00$19.00$21.00$21.00
80THPL PVT MK LTR & sym (78000100)SF130$7.50$9.36$7.50$8.00$10.00$19.00
81THPL PVT MK line 4 (78000200)LF4,660$0.94$0.77$0.94$1.55$0.80$2.00
82THPL PVT MK line 6 (78000400)LF256$1.42$1.51$1.42$2.15$1.60$5.00
83THPL PVT MK line 12 (78000600)LF989$3.60$3.02$3.60$4.00$3.10$10.00
84THPL PVT MK line 24 (78000650)LF48$7.50$6.24$7.50$8.50$7.00$20.00
85PVT MKG rem WTR blast (78300202)SF180$23.00$14.56$14.00$19.00$32.00$25.00
86Undrgrd C galvs 4 (81028240)LF32$80.00$114.46$64.71$89.00$70.00$80.00
87UD 2#6 #6G xlpuse 1 (81603035)LF530$26.00$29.06$9.25$29.00$10.00$26.00
88Lum LED rdwy H (82110008)EACH3$1,400.00$1,054.58$1,519.40$1,575.00$1,600.00$1,400.00
89LT P A 50MH 10DA (83004400)EACH3$6,820.00$7,296.64$7,307.98$6,900.00$8,000.00$6,200.00
90LP F M 15BC 10" X 8' (83600365)EACH3$1,815.00$2,498.34$1,683.13$1,850.00$2,000.00$1,650.00
91Bkwy dev TR B 15BC (83800205)EACH1$1,760.00$808.86$1,446.00$1,780.00$1,600.00$1,600.00
92Rebuild EX handhole (89502376)EACH3$2,310.00$4,157.11$2,000.00$2,300.00$2,500.00$2,100.00
IDOT contract 61L46: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy