IDOT contract 87843 bid tabulation
Project Number:, section 21-P4006-03-BT. Let by Illinois DOT on November 7, 2025, Dekalb, District 03. 4 bids received; low bid $1,580,482 by Martin & Company Excavating.
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 71
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Martin & Company Excavating | $1,580,482 | Low |
| 2 | Copenhaver Construction, Inc. | $1,696,862 | +7.0% |
| 3 | Civil Constructors, Inc. d/b/a/ Helm Civil | $1,907,743 | +21% |
| 4 | Alliance Contractors, Inc. | $2,382,149 | +51% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Martin & Company Excavating | 2. Copenhaver Construction, Inc. | 3. Civil Constructors, Inc. d/b/a/ Helm Civil | 4. Alliance Contractors, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Boardwalk structure (XX008287) | SF | 3,631 | $165.00 | $160.00 | $223.00 | $272.00 |
| 2 | Constructn layout SPL (X0320050) | LS | 1 | $30,000 | $15,000 | $25,750 | $24,175 |
| 3 | Rodent shields (X0322278) | EACH | 2 | $100.00 | $300.00 | $52.00 | $100.00 |
| 4 | Ped truss superstr (X0322508) | SF | 960 | $235.00 | $265.00 | $296.00 | $241.00 |
| 5 | Washout basin (X0326806) | LS | 1 | $1,500.00 | $1,400.00 | $1,350.00 | $500.00 |
| 6 | Fold down bollards (X0350805) | EACH | 3 | $2,250.00 | $1,500.00 | $1,988.00 | $2,700.00 |
| 7 | Rem & rel SN P&P assy (X2600012) | EACH | 1 | $300.00 | $500.00 | $1,000.00 | $400.00 |
| 8 | Biaxial geogrid (X3010104) | SY | 1,170 | $4.00 | $4.00 | $3.80 | $5.00 |
| 9 | Concrete removal SPL (X5012501) | SY | 15 | $50.00 | $40.00 | $124.00 | $100.00 |
| 10 | Man san 5 dia T1F CL (X6022820) | EACH | 1 | $8,500.00 | $8,000.00 | $11,000 | $27,500 |
| 11 | Sanitary manhole adj (X6026050) | EACH | 1 | $1,850.00 | $1,200.00 | $1,800.00 | $3,500.00 |
| 12 | CH LK fence remov SP (X6640302) | LF | 75 | $22.00 | $30.00 | $19.28 | $19.28 |
| 13 | Stab constr entrance (Z0013797) | SY | 250 | $15.00 | $0.01 | $18.00 | $10.00 |
| 14 | Storm sew WM req 12 (Z0056608) | LF | 50 | $100.00 | $250.00 | $139.00 | $140.00 |
| 15 | Tree remov 6-15 (20100110) | UNIT | 243 | $32.00 | $42.00 | $29.00 | $29.00 |
| 16 | Tree remov over 15 (20100210) | UNIT | 66 | $38.00 | $55.00 | $34.00 | $34.00 |
| 17 | Temporary fence (20101000) | LF | 220 | $5.00 | $5.00 | $6.50 | $6.50 |
| 18 | Tree prun over 10 (20101350) | EACH | 32 | $225.00 | $185.00 | $200.00 | $200.00 |
| 19 | Earth excavation (20200100) | CY | 188 | $30.00 | $55.00 | $25.00 | $90.00 |
| 20 | Rem & disp uns matl (20201200) | CY | 390 | $30.00 | $55.00 | $34.00 | $90.00 |
| 21 | Furnished excavation (20400800) | CY | 1,248 | $30.00 | $10.00 | $36.00 | $1.00 |
| 22 | Geotech fab F/GR stab (21001000) | SY | 1,170 | $4.00 | $3.00 | $3.80 | $1.00 |
| 23 | Topsoil exc & plac (21101505) | CY | 1,786 | $22.00 | $17.00 | $48.00 | $1.00 |
| 24 | Seeding CL 1 (25000100) | ACRE | 1 | $4,650.00 | $3,000.00 | $2,900.00 | $2,900.00 |
| 25 | Seeding CL 4A (25000312) | ACRE | 0.75 | $6,200.00 | $8,000.00 | $2,995.00 | $2,995.00 |
| 26 | Erosion contr blanket (25100630) | SY | 7,757 | $1.60 | $2.00 | $1.40 | $1.40 |
| 27 | Temp eros contr seed (28000250) | LB | 175 | $9.00 | $0.01 | $11.00 | $11.00 |
| 28 | Perimeter eros bar (28000400) | LF | 2,681 | $2.75 | $3.00 | $3.75 | $3.75 |
| 29 | Inlet & pipe protect (28000500) | EACH | 10 | $150.00 | $250.00 | $154.00 | $50.00 |
| 30 | Stone riprap CL A3 (28100105) | SY | 33 | $75.00 | $90.00 | $68.00 | $100.00 |
| 31 | Filter fabric (28200200) | SY | 65 | $5.00 | $10.00 | $2.00 | $1.00 |
| 32 | Agg subgrade improve (30300001) | CY | 390 | $60.00 | $57.00 | $55.00 | $50.00 |
| 33 | Agg base cse B 8 (35102000) | SY | 2,669 | $14.00 | $12.00 | $20.00 | $8.50 |
| 34 | HMA repl over patch (40601005) | TON | 2 | $500.00 | $220.00 | $200.00 | $200.00 |
| 35 | HMA SC IL-9.5 C N50 (40604050) | TON | 414 | $175.00 | $150.00 | $101.25 | $101.25 |
| 36 | Pavement rem (44000100) | SY | 1,894 | $9.00 | $17.00 | $4.00 | $40.00 |
| 37 | HMA RM OV patch 2 (44002208) | SY | 14 | $200.00 | $220.00 | $20.00 | $20.00 |
| 38 | CL D patch T1 6 (44201713) | SY | 11 | $240.00 | $250.00 | $85.00 | $85.00 |
| 39 | Conc struct (50300225) | CY | 34 | $1,750.00 | $2,400.00 | $2,240.00 | $3,450.00 |
| 40 | Protective coat (50300300) | SY | 135 | $4.00 | $5.00 | $5.50 | $0.01 |
| 41 | Conc supstr app slab (50301350) | CY | 9 | $1,750.00 | $1,600.00 | $830.00 | $950.00 |
| 42 | Reinf bars, epoxy CTD (50800205) | LB | 6,750 | $3.25 | $3.00 | $4.00 | $3.00 |
| 43 | Fur STL pile HP14X73 (51201800) | LF | 405 | $104.00 | $150.00 | $93.00 | $280.00 |
| 44 | Driving piles (51202305) | LF | 405 | $1.00 | $1.00 | $0.10 | $1.00 |
| 45 | Test pile ST HP14X73 (51203800) | EACH | 2 | $9,500.00 | $8,000.00 | $11,600 | $5,000.00 |
| 46 | PRC flar end sec 12 (54213657) | EACH | 5 | $1,850.00 | $1,700.00 | $2,400.00 | $600.00 |
| 47 | PRC flar end sec 15 (54213660) | EACH | 1 | $1,950.00 | $2,000.00 | $2,400.00 | $700.00 |
| 48 | PRC flar end sec 18 (54213663) | EACH | 1 | $2,050.00 | $2,500.00 | $3,000.00 | $800.00 |
| 49 | Storm sew CL B 1 12 (550B0050) | LF | 102 | $90.00 | $125.00 | $112.00 | $70.00 |
| 50 | Storm sew CL B 1 15 (550B0070) | LF | 58 | $95.00 | $160.00 | $77.00 | $80.00 |
| 51 | Storm sew CL B 2 20 (550B0390) | LF | 334 | $105.00 | $150.00 | $65.00 | $90.00 |
| 52 | Granular backfill STR (58600101) | CY | 24 | $32.00 | $80.00 | $147.00 | $50.00 |
| 53 | Concrete sealer (58700300) | SF | 753 | $4.00 | $2.00 | $1.65 | $0.01 |
| 54 | Geocomposite wall DR (59100100) | SY | 25 | $22.00 | $45.00 | $45.00 | $10.00 |
| 55 | Conc HDWL for P drain (60100060) | EACH | 2 | $450.00 | $1,200.00 | $480.00 | $500.00 |
| 56 | P undr for struct 4 (60146304) | LF | 122 | $38.00 | $40.00 | $45.00 | $10.00 |
| 57 | CB TA 4 dia T8G (60200805) | EACH | 2 | $2,850.00 | $3,900.00 | $3,000.00 | $8,000.00 |
| 58 | CB TC T8G (60207605) | EACH | 3 | $1,950.00 | $3,000.00 | $2,100.00 | $5,000.00 |
| 59 | Man TA 4 dia (60220200) | EACH | 4 | $2,950.00 | $5,500.00 | $3,800.00 | $8,000.00 |
| 60 | Man TA 5 dia (60222900) | EACH | 1 | $3,250.00 | $7,000.00 | $3,700.00 | $10,000 |
| 61 | CB adj new T1F CL (60250500) | EACH | 1 | $1,250.00 | $800.00 | $1,500.00 | $1,000.00 |
| 62 | Conc curb TB (60600605) | LF | 165 | $65.00 | $55.00 | $72.00 | $50.00 |
| 63 | CH LK fence 6 (66400305) | LF | 65 | $91.00 | $120.00 | $82.56 | $82.56 |
| 64 | Mobilization (67100100) | LS | 1 | $88,000 | $105,000 | $114,465 | $385,428 |
| 65 | TR cont & prot 701501 (70102620) | LS | 1 | $8,000.00 | $48,000 | $4,000.00 | $8,000.00 |
| 66 | TR cont & prot 701801 (70102640) | LS | 1 | $2.00 | $200.00 | $1,200.00 | $125.00 |
| 67 | Sign panel T1 (72000100) | SF | 31 | $70.00 | $17.00 | $40.00 | $70.00 |
| 68 | Metal post TY A (72900100) | LF | 115 | $30.00 | $18.00 | $30.00 | $35.00 |
| 69 | Paint PVT MK line 4 (78001110) | LF | 2,207 | $1.00 | $2.00 | $1.85 | $1.80 |
| 70 | Paint PVT MK line 12 (78001150) | LF | 254 | $4.50 | $10.00 | $5.50 | $8.40 |
| 71 | Paint PVT MK line 24 (78001180) | LF | 25 | $10.00 | $20.00 | $11.00 | $16.70 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.