Berger Excavating Contractors, Inc.: IDOT bid record

Berger Excavating Contractors, Inc. submitted 30 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 10 MAR 2023, and was the low bidder on 4 of them (13%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$20,980,010
Latest bid
10 MAR 2023
Data through
18 SEP 2026
30Bids
4Low bids
13Win rate, percent
+9.0%Median gap to the low bid when not low, 26 bids

By year

YearBidsLow bidsWin rate
202120210%
20228225%
2023200%
Berger Excavating Contractors, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0128311%
District 032150%
Berger Excavating Contractors, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR2626 (100%)$15.00$15.00
TraineesZ0076600HR2626 (100%)$0.80$0.80
Temp info signingZ0030850SF2717 (63%)$14.00$18.00
Bit matls tack CT40600290LB2417 (71%)$0.01$0.01
Sign panel T172000100SF2316 (70%)$22.00$31.00
Tree remov 6-1520100110UNIT2014 (70%)$19.50$35.00
Comb curb gutter rem44000500LF2613 (50%)$4.40$11.61
Perimeter eros bar28000400LF2712 (44%)$2.00$3.50
Temp eros contr seed28000250LB2412 (50%)$5.00$5.00
THPL PVT MK line 478000200LF2312 (52%)$0.75$0.88
HMA surf rem butt JT40600982SY1912 (63%)$10.00$16.50
Teles STL sin support72800100LF1612 (75%)$10.00$19.50
Berger Excavating Contractors, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Berger Excavating Contractors, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
10 MAR 202361J15District 01Vernon Hills, section 98-00026-02-WR3 of 3$7,086,232+17%
20 JAN 202387783District 03Oswego, section 20-00052-01-PV5 of 6$11,226,016+9.0%
18 NOV 202261J02District 01Maywood, section 18-00139-00-PV5 of 8$6,630,426+15%
29 APR 202261H47District 01Western Springs, section 16-00094-00-PV1 of 4$4,645,651Low, 5.0% under the second
29 APR 202261H71District 01Glenview, section 15-00190-00-PV3 of 3$5,755,636+9.0%
11 MAR 202261G85District 01Highland Park, section 15-00125-00-PV3 of 6$9,841,311+5.0%
11 MAR 202261H45District 01Buffalo Grove, section 16-00106-03-RS4 of 7$3,428,542+11%
11 MAR 202262H38District 01Section 2019-109-RS,SW&T2 of 5$6,152,035+8.0%
21 JAN 202261G01District 01Woodstock, section 16-00114-00-PV2 of 8$2,770,883+1.0%
21 JAN 202287763District 03Sandwich, section 20-00046-00-FP1 of 5$3,227,920Low, 0.0% under the second
05 NOV 202161H15District 01Streamwood, section 10-00055-01-WR6 of 8$6,631,313+12%
05 NOV 202161H27District 01Crystal Lake, section 15-00124-00-PV3 of 5$4,834,862+6.0%
17 SEP 202162H87District 01Section 2019-006-N1 of 7$2,974,033Low, 1.0% under the second
30 JUL 202162G11District 01Section 32R-DR-13 of 5$4,043,013+4.0%
11 JUN 202160T15District 01Section 146N-25 of 6$2,911,487+6.0%
11 JUN 202161B89District 01Project Number: 7Z9S-265 / /, section 08-00138-28-TL4 of 5$9,286,034+17%
11 JUN 202161H05District 01Elk Grove Village, section 15-00061-00-BR4 of 8$1,488,305+21%
23 APR 202160T11District 01Section (39&41)N-33 of 5$3,221,317+4.0%
23 APR 202160T17District 01Section 52-N5 of 9$1,478,679+13%
23 APR 202160X72District 01Section (541S-1)T3 of 4$474,063+31%
23 APR 202161G58District 01Aurora, section 14-00210-02-PV2 of 11$7,944,339+2.0%
23 APR 202162633District 01Section 2003-065N3 of 9$4,816,496+7.0%
05 MAR 202161E91District 01Barrington, section 12-00089-00-PK5 of 10$1,593,380+7.0%
05 MAR 202161G60District 01Algonquin, section 16-00090-02-PV4 of 8$6,583,275+4.0%
05 MAR 202161G81District 01Palos Heights, section 15-00053-00-PV4 of 12$1,748,149+19%
Berger Excavating Contractors, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way