Pir Tano Construction Company, Inc.: IDOT bid record

Pir Tano Construction Company, Inc. submitted 10 bids on Illinois DOT contracts in the data, from 05 MAR 2021 to 11 MAR 2022, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$8,445,790
Latest bid
11 MAR 2022
Data through
18 SEP 2026
10Bids
2Low bids
20Win rate, percent
+9.0%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
20218225%
2022200%
Pir Tano Construction Company, Inc., IDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR88 (100%)$15.00$15.00
TraineesZ0076600HR88 (100%)$0.80$0.80
Perimeter eros bar28000400LF104 (40%)$2.00$3.50
Reg sub mon66901006CAL DAY74 (57%)$680.00$820.00
Tree remov 6-1520100110UNIT74 (57%)$24.00$35.00
Conc curb TB60600605LF74 (57%)$28.00$47.00
Bit matls tack CT40600290LB64 (67%)$0.01$0.01
THPL PVT MK line 2478000650LF64 (67%)$5.50$6.00
Temp ditch checks28000305LF64 (67%)$4.40$12.50
Short term pavt mking70300100LF54 (80%)$0.35$1.01
Temp info signingZ0030850SF93 (33%)$15.00$18.00
Temp eros contr seed28000250LB83 (38%)$5.00$5.00
Pir Tano Construction Company, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Pir Tano Construction Company, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
11 MAR 202261H58District 01Spring Grove, section 21-00018-01-RS6 of 8$242,000+47%
21 JAN 202261G01District 01Woodstock, section 16-00114-00-PV4 of 8$2,849,363+3.0%
05 NOV 202161H27District 01Crystal Lake, section 15-00124-00-PV1 of 5$4,564,372Low, 4.0% under the second
17 SEP 202161H17District 01Project Number: Jxct-125 / /, section 18-P4004-01-BT5 of 8$1,082,280+21%
17 SEP 202162K02District 01Section 2019-129-TS&N2 of 7$3,122,894+6.0%
30 JUL 202162G11District 01Section 32R-DR-11 of 5$3,881,417Low, 0.0% under the second
11 JUN 202160T15District 01Section 146N-22 of 6$2,792,600+2.0%
05 MAR 202161G60District 01Algonquin, section 16-00090-02-PV6 of 8$6,632,871+5.0%
05 MAR 202161G81District 01Palos Heights, section 15-00053-00-PV6 of 12$1,763,637+20%
05 MAR 202161G93District 01Project Number: W92H-031 / /, section 18-P4002-00-BT4 of 9$899,000+12%
Pir Tano Construction Company, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way