Lake County Grading Company, LLC: IDOT bid record
Lake County Grading Company, LLC submitted 22 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 01 AUG 2025, and was the low bidder on 4 of them (18%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $27,145,336
- Latest bid
- 01 AUG 2025
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 8 | 1 | 13% |
| 2022 | 2 | 1 | 50% |
| 2023 | 5 | 1 | 20% |
| 2024 | 4 | 0 | 0% |
| 2025 | 3 | 1 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 20 | 3 | 15% |
| District 03 | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 20 | 20 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 20 | 20 (100%) | $0.80 | $0.80 |
| Bit matls tack CT | 40600290 | LB | 19 | 17 (89%) | $0.01 | $0.01 |
| Sign panel T1 | 72000100 | SF | 19 | 17 (89%) | $22.00 | $31.00 |
| Temp info signing | Z0030850 | SF | 18 | 16 (89%) | $14.00 | $18.00 |
| THPL PVT MK LTR & sym | 78000100 | SF | 19 | 14 (74%) | $5.00 | $5.75 |
| Drive pavement rem | 44000200 | SY | 20 | 13 (65%) | $7.50 | $20.00 |
| THPL PVT MK line 24 | 78000650 | LF | 18 | 13 (72%) | $5.00 | $6.00 |
| Erosion contr blanket | 25100630 | SY | 15 | 13 (87%) | $0.80 | $1.85 |
| Temp eros contr seed | 28000250 | LB | 20 | 11 (55%) | $4.50 | $5.00 |
| Temp ditch checks | 28000305 | LF | 17 | 11 (65%) | $7.00 | $12.50 |
| Undrgrd C galvs 3 | 81028220 | LF | 16 | 11 (69%) | $45.15 | $51.90 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Campanella and Sons, Inc. | 12 | 6 of 12 |
| Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | 10 | 3 of 10 |
| Berger Excavating Contractors, Inc. | 9 | 4 of 9 |
| Copenhaver Construction, Inc. | 9 | 0 of 9 |
| Plote Construction, Inc. | 8 | 5 of 8 |
| Martam Construction Incorporated | 8 | 3 of 8 |
| R. W. Dunteman Company | 6 | 0 of 6 |
| A Lamp Concrete Contractors, Inc. | 6 | 2 of 6 |
| Acura Inc. | 4 | 0 of 4 |
| Alliance Contractors, Inc. | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 AUG 2025 | 61L37 | District 01 | Schaumburg, section 22-00142-01-PV | 2 of 9 | $5,921,026 | +3.0% |
| 01 AUG 2025 | 61L38 | District 01 | Schaumburg, section 22-00142-02-PV | 2 of 8 | $6,022,991 | 0.0% |
| 13 JUN 2025 | 61J86 | District 01 | Round Lake Beach, section 17-00080-00-PV | 1 of 5 | $4,391,124 | Low, 3.0% under the second |
| 20 SEP 2024 | 61K06 | District 01 | Streamwood, section 10-00055-02-WR | 2 of 8 | $10,749,991 | 0.0% |
| 08 MAR 2024 | 61J65 | District 01 | South Elgin, section 18-00050-00-PV | 2 of 6 | $13,394,863 | +5.0% |
| 08 MAR 2024 | 61K10 | District 01 | Volo, section 15-08113-05-CH | 4 of 4 | $3,331,541 | +18% |
| 08 MAR 2024 | 62W53 | District 01 | Section 2023-917-TL | 2 of 3 | $4,533,233 | +3.0% |
| 04 AUG 2023 | 62R18 | District 01 | Section FA | 2 of 3 | $4,326,482 | +1.0% |
| 16 JUN 2023 | 62K05 | District 01 | Section 2019-132-DM&T | 3 of 5 | $495,971 | +43% |
| 28 APR 2023 | 60N11 | District 01 | Section 3Y-R | 2 of 2 | $16,583,020 | +4.0% |
| 10 MAR 2023 | 87800 | District 03 | Project Number: Yjby-239 / /, section 19-00154-00-FP | 3 of 3 | $14,321,214 | +18% |
| 20 JAN 2023 | 87783 | District 03 | Oswego, section 20-00052-01-PV | 1 of 6 | $10,257,420 | Low, 1.0% under the second |
| 05 AUG 2022 | 61A96 | District 01 | Project Number: 3Zru-835 / /, section 99-00147-07-FP | 2 of 4 | $10,910,910 | +9.0% |
| 11 MAR 2022 | 61G85 | District 01 | Highland Park, section 15-00125-00-PV | 1 of 6 | $9,399,399 | Low, 4.0% under the second |
| 30 JUL 2021 | 60X57 | District 01 | Section 118N-2 | 3 of 5 | $1,273,894 | +10% |
| 11 JUN 2021 | 60T15 | District 01 | Section 146N-2 | 4 of 6 | $2,878,045 | +5.0% |
| 11 JUN 2021 | 61B89 | District 01 | Project Number: 7Z9S-265 / /, section 08-00138-28-TL | 3 of 5 | $8,564,734 | +8.0% |
| 23 APR 2021 | 60T11 | District 01 | Section (39&41)N-3 | 1 of 5 | $3,097,393 | Low, 2.0% under the second |
| 05 MAR 2021 | 61G92 | District 01 | Indian Head Park, section 18-00013-00-FP | 9 of 10 | $1,720,914 | +18% |
| 05 MAR 2021 | 62M70 | District 01 | Section 2020-197-DM | 4 of 7 | $420,000 | +14% |
| 15 JAN 2021 | 61G19 | District 01 | Naperville, section 08-00140-00-PV | 2 of 9 | $10,601,272 | +5.0% |
| 15 JAN 2021 | 61G83 | District 01 | Carpentersville, section 17-00091-00-FP | 7 of 11 | $1,791,063 | +14% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.