Lake County Grading Company, LLC: IDOT bid record

Lake County Grading Company, LLC submitted 22 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 01 AUG 2025, and was the low bidder on 4 of them (18%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$27,145,336
Latest bid
01 AUG 2025
Data through
18 SEP 2026
22Bids
4Low bids
18Win rate, percent
+7.0%Median gap to the low bid when not low, 18 bids

By year

YearBidsLow bidsWin rate
20218113%
20222150%
20235120%
2024400%
20253133%
Lake County Grading Company, LLC, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0120315%
District 032150%
Lake County Grading Company, LLC, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR2020 (100%)$15.00$15.00
TraineesZ0076600HR2020 (100%)$0.80$0.80
Bit matls tack CT40600290LB1917 (89%)$0.01$0.01
Sign panel T172000100SF1917 (89%)$22.00$31.00
Temp info signingZ0030850SF1816 (89%)$14.00$18.00
THPL PVT MK LTR & sym78000100SF1914 (74%)$5.00$5.75
Drive pavement rem44000200SY2013 (65%)$7.50$20.00
THPL PVT MK line 2478000650LF1813 (72%)$5.00$6.00
Erosion contr blanket25100630SY1513 (87%)$0.80$1.85
Temp eros contr seed28000250LB2011 (55%)$4.50$5.00
Temp ditch checks28000305LF1711 (65%)$7.00$12.50
Undrgrd C galvs 381028220LF1611 (69%)$45.15$51.90
Lake County Grading Company, LLC, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
01 AUG 202561L37District 01Schaumburg, section 22-00142-01-PV2 of 9$5,921,026+3.0%
01 AUG 202561L38District 01Schaumburg, section 22-00142-02-PV2 of 8$6,022,9910.0%
13 JUN 202561J86District 01Round Lake Beach, section 17-00080-00-PV1 of 5$4,391,124Low, 3.0% under the second
20 SEP 202461K06District 01Streamwood, section 10-00055-02-WR2 of 8$10,749,9910.0%
08 MAR 202461J65District 01South Elgin, section 18-00050-00-PV2 of 6$13,394,863+5.0%
08 MAR 202461K10District 01Volo, section 15-08113-05-CH4 of 4$3,331,541+18%
08 MAR 202462W53District 01Section 2023-917-TL2 of 3$4,533,233+3.0%
04 AUG 202362R18District 01Section FA2 of 3$4,326,482+1.0%
16 JUN 202362K05District 01Section 2019-132-DM&T3 of 5$495,971+43%
28 APR 202360N11District 01Section 3Y-R2 of 2$16,583,020+4.0%
10 MAR 202387800District 03Project Number: Yjby-239 / /, section 19-00154-00-FP3 of 3$14,321,214+18%
20 JAN 202387783District 03Oswego, section 20-00052-01-PV1 of 6$10,257,420Low, 1.0% under the second
05 AUG 202261A96District 01Project Number: 3Zru-835 / /, section 99-00147-07-FP2 of 4$10,910,910+9.0%
11 MAR 202261G85District 01Highland Park, section 15-00125-00-PV1 of 6$9,399,399Low, 4.0% under the second
30 JUL 202160X57District 01Section 118N-23 of 5$1,273,894+10%
11 JUN 202160T15District 01Section 146N-24 of 6$2,878,045+5.0%
11 JUN 202161B89District 01Project Number: 7Z9S-265 / /, section 08-00138-28-TL3 of 5$8,564,734+8.0%
23 APR 202160T11District 01Section (39&41)N-31 of 5$3,097,393Low, 2.0% under the second
05 MAR 202161G92District 01Indian Head Park, section 18-00013-00-FP9 of 10$1,720,914+18%
05 MAR 202162M70District 01Section 2020-197-DM4 of 7$420,000+14%
15 JAN 202161G19District 01Naperville, section 08-00140-00-PV2 of 9$10,601,272+5.0%
15 JAN 202161G83District 01Carpentersville, section 17-00091-00-FP7 of 11$1,791,063+14%
Lake County Grading Company, LLC: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy