IDOT contract 62R73 bid tabulation

Section FAP. Let by Illinois DOT on March 7, 2025, Cook, District 01. 4 bids received; low bid $2,946,729 by Martam Construction Incorporated.

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
141
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Martam Construction Incorporated$2,946,729Low
2Lorig Construction Company$3,150,252+7.0%
3Copenhaver Construction, Inc.$3,236,517+10%
4Alliance Contractors, Inc.$3,437,717+17%
IDOT contract 62R73: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Martam Construction Incorporated2. Lorig Construction Company3. Copenhaver Construction, Inc.4. Alliance Contractors, Inc.
1Stump removal only (X2010400)UNIT252$15.00$11.00$20.00$10.00
2Seeding CL 4B mod (X2502024)ACRE0.25$3,300.00$3,000.00$10,000$3,000.00
3HD eros cont blank SP (X2510635)SY68$6.00$7.00$10.00$5.00
4Eros cont blanket SPL (X2511630)SY7,238$1.40$1.30$0.01$1.25
5CL D patch T4 10 SPL (X4421768)SY49$320.00$126.00$170.00$187.00
6Aggregate SHLD removl (X4810200)CY29$120.00$90.00$75.00$40.00
7Cofferdam typ 1 IS WW (X5021512)EACH2$32,000$1,000.00$45,000$47,205
8Remov EX flar end sec (X5427602)EACH10$800.00$850.00$250.00$250.00
9Memb WTRPRF sys B STR (X5810103)SY106$52.00$82.00$60.00$48.77
10Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,800.00$3,500.00$3,000.00$500.00
11Traf cont & prot SPL (X7010216)LS1$168,724$187,000$235,000$33,066
12RRPM reflector removl (X7830050)EACH29$15.00$15.00$30.00$25.00
13RRPM reflector replac (X7830052)EACH29$30.00$25.00$45.00$20.00
14Det loop repl (X8860105)LF40$60.00$125.00$100.00$52.46
15Construction layout (Z0013798)LS1$24,000$100,000$68,000$10,900
16Temp info signing (Z0030850)SF52$25.00$18.00$22.00$18.00
17Rock fill (Z0054400)CY149$58.00$90.00$60.00$100.00
18Temp pavement (Z0062456)SY1,307$68.00$73.00$68.00$57.00
19Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80
20Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00
21Tree trunk protection (20101100)EACH20$100.00$80.00$100.00$80.00
22Earth excavation (20200100)CY632$65.00$40.00$47.00$40.00
23Furnished excavation (20400800)CY1,006$1.00$30.00$30.00$10.00
24Trench backfill (20800150)CY1,532$65.00$62.00$45.00$34.00
25Geotech fab F/GR stab (21001000)SY761$3.00$4.00$3.00$1.00
26Topsoil exc & plac (21101505)CY987$25.00$60.00$15.00$10.00
27Seeding CL 1A (25000110)ACRE1$3,000.00$2,500.00$13,000$2,500.00
28Temp ditch checks (28000305)LF64$15.00$10.00$60.00$10.00
29Perimeter eros bar (28000400)LF3,411$3.00$2.10$4.00$2.10
30Inlet filters (28000510)EACH13$300.00$275.00$300.00$25.00
31Stone riprap CL A4 (28100107)SY63$112.00$160.00$140.00$90.00
32Filter fabric (28200200)SY63$8.00$5.00$10.00$5.00
33Agg subgrade improve (30300001)CY254$65.00$110.00$45.00$43.00
34Agg subgrade impr 12 (30300112)SY3,043$18.00$33.00$28.00$18.75
35Sub gran mat B 4 (31101200)SY771$12.00$8.00$10.00$7.25
36Agg base cse B 3 (35101598)SY819$11.00$16.00$10.00$5.50
37HMA base cse 6 (35501308)SY90$140.00$91.00$55.00$90.00
38HMA base cse 8 (35501316)SY1,427$55.00$62.00$56.00$52.00
39HMA BC wid 8 (35600708)SY309$55.00$80.00$65.00$68.00
40Bit matls tack CT (40600290)LB2,972$0.30$0.01$0.01$3.00
41Long joint sealant (40600370)LF1,479$7.00$8.10$12.00$7.00
42Mix CR JTS flangewys (40600400)TON80$220.00$190.00$360.00$75.00
43HMA surf rem butt JT (40600982)SY212$22.00$25.00$15.00$1.00
44HMA SC IL-9.5 D N50 (40604060)TON11$330.00$525.00$160.00$335.00
45P HMA SC IL-9.5 E N70 (40604172)TON740$132.00$133.00$160.00$107.00
46PC conc sidewalk 5 (42400200)SF7,137$10.00$13.00$13.00$9.50
47Detectable warnings (42400800)SF45$41.00$50.00$40.00$40.00
48Pavement rem (44000100)SY2,312$18.00$36.00$17.00$40.00
49HMA surf rem 2 (44000157)SY4,641$7.00$5.75$5.00$6.00
50Drive pavement rem (44000200)SY218$15.00$18.00$16.00$40.00
51Curb rem (44000300)LF46$8.00$18.00$10.00$40.00
52Comb curb gutter rem (44000500)LF1,040$8.00$12.00$8.00$40.00
53Sidewalk rem (44000600)SF114$5.00$8.00$5.00$4.00
54Median removal (44003100)SF85$23.00$13.00$10.00$4.00
55Saw cuts (44213200)LF67$12.00$7.00$5.00$10.00
56Rem exist struct (50100200)LS1$60,000$200,000$55,000$207,800
57Conc headwall removal (50104400)EACH2$4,500.00$600.00$5,000.00$20,000
58Pipe culvert remov (50105220)LF185$60.00$32.00$40.00$15.00
59Structure excavation (50200100)CY331$65.00$1.00$55.00$50.00
60Rem/disp uns matl-STR (50200450)CY149$65.00$110.00$55.00$50.00
61Conc struct (50300225)CY75.30$1,850.00$1,650.00$1,800.00$2,575.00
62Stud shear connectors (50500505)EACH450$32.00$25.00$50.00$30.00
63Reinf bars, epoxy CTD (50800205)LB33,060$2.00$1.60$3.00$1.75
64Bar splicers (50800515)EACH74$65.00$56.00$50.00$40.00
65Parapet railing (50901750)LF191$130.00$109.00$130.00$192.90
66Name plates (51500100)EACH1$1,200.00$650.00$1,100.00$750.00
67Temp soil reten systm (52200020)SF697$65.00$1.00$85.00$192.00
68Fur soldier piles HP (52200100)LF791.50$185.00$115.00$210.00$211.00
69Drive soldier piles (52200150)LF579.50$1.00$1.00$1.00$1.00
70Untreated timber lag (52200250)SF1,357$24.00$21.00$20.00$10.00
71Conc box cul (54003000)CY114.80$1,720.00$1,900.00$1,500.00$2,575.00
72PRC flar end sec 12 (54213657)EACH1$1,500.00$1,825.00$2,000.00$2,195.00
73PRC flar end sec 15 (54213660)EACH1$1,600.00$1,900.00$2,200.00$2,450.00
74PRC flar end sec 36 (54213681)EACH1$4,200.00$3,600.00$4,900.00$5,100.00
75Storm sew CL A 1 12 (550A0050)LF266$95.00$50.00$115.00$70.00
76Storm sew CL A 1 15 (550A0070)LF226$98.00$51.00$120.00$72.00
77Storm sew CL A 1 18 (550A0090)LF63$115.00$10.00$125.00$230.00
78Storm sew CL A 1 24 (550A0120)LF344$145.00$100.00$160.00$121.00
79Storm sew CL A 1 30 (550A0140)LF351$162.00$126.00$172.00$166.00
80Storm sew CL A 1 36 (550A0160)LF200$188.00$158.00$192.00$236.00
81Storm sew CL A 2 12 (550A0340)LF102$95.00$57.00$117.00$74.00
82Storm sew CL A 2 15 (550A0360)LF137$98.00$65.00$122.00$80.00
83Storm sew CL A 2 36 (550A0450)LF271$188.00$125.00$197.00$231.00
84Storm sew CL B 1 36 (550B0160)LF92$188.00$162.00$250.00$251.00
85Storm sewer rem 12 (55100500)LF188$10.00$34.00$15.00$13.50
86Storm sewer rem 15 (55100700)LF464$10.00$36.00$18.00$13.50
87Granular backfill STR (58600101)CY233$65.00$101.00$59.00$100.00
88Concrete sealer (58700300)SF1,695$1.00$7.00$2.00$1.00
89Geocomposite wall DR (59100100)SY151$46.00$26.00$45.00$20.00
90P undr for struct 4 (60146304)LF176$32.00$42.00$30.00$40.00
91CB TA 4 dia T12F&G (60201205)EACH7$4,500.00$5,400.00$4,000.00$4,600.00
92CB TA 4 dia T24F&G (60201340)EACH6$4,500.00$4,900.00$4,000.00$4,450.00
93CB TD 3 dia T1F OL (60210500)EACH1$3,600.00$3,500.00$3,100.00$3,000.00
94Man TA 4 dia T1F OL (60218300)EACH2$4,800.00$4,900.00$4,200.00$5,200.00
95Man TA 4 dia T1F CL (60218400)EACH6$4,800.00$5,000.00$4,200.00$5,200.00
96Man TA 5 dia T1F OL (60221000)EACH3$6,200.00$6,500.00$5,200.00$6,545.00
97Man TA 5 dia T1F CL (60221100)EACH5$6,200.00$6,500.00$5,200.00$6,545.00
98Inlets TA T12F&G (60236900)EACH5$2,800.00$2,800.00$2,300.00$2,950.00
99Inlets TA T24F&G (60237470)EACH1$2,800.00$2,300.00$3,000.00$2,750.00
100Inlets adjust (60260100)EACH2$600.00$900.00$500.00$575.00
101FR & lids adjust (60300305)EACH2$600.00$900.00$500.00$575.00
102FR & lids T1 OL (60406000)EACH2$980.00$400.00$700.00$475.00
103FR & lids T1 ADA compl OL (60406001)EACH2$1,120.00$400.00$700.00$600.00
104FR & lids T1 CL (60406100)EACH2$980.00$375.00$600.00$475.00
105Remov catch bas (60500050)EACH8$500.00$1,800.00$600.00$450.00
106Conc curb TB (60600605)LF8$95.00$57.00$102.00$45.75
107Comb CC&G TB6.12 (60603800)LF894$36.00$44.00$32.00$51.25
108Comb CC&G TY B-6.24 (60605000)LF1,012$45.00$45.00$33.00$59.75
109SPBGR TY A 6FT posts (63000001)LF458$28.00$27.00$60.00$27.49
110LSG OV cul 18'9" span (63000360)LF44$45.00$40.00$57.00$38.60
111TR bar TRM T1 SPL FLR (63100169)EACH2$4,100.00$3,900.00$4,100.00$2,910.00
112Guardrail remov (63200310)LF538$6.00$5.00$17.00$6.88
113Non SPL waste disposl (66900200)CY280$92.00$105.00$110.00$88.00
114Soil disposal analy (66900530)EACH3$1,700.00$1,300.00$1,500.00$1,400.00
115Reg sub P-const plan (66901001)LS1$3,700.00$4,300.00$5,000.00$2,900.00
116Reg sub F con report (66901003)LS1$1,700.00$900.00$1,000.00$1,200.00
117Reg sub mon (66901006)CAL DAY20$800.00$1,300.00$600.00$700.00
118Mobilization (67100100)LS1$176,000$175,000$210,500$415,188
119TR cont surveillance (70103815)CAL DAY105$165.00$300.00$200.00$200.00
120Changeable message SN (70107025)CAL DAY180$10.00$30.00$33.00$30.00
121Short term pavt mking (70300100)LF11,527$0.40$1.60$0.50$1.00
122SHRT TRM pavt MK rem (70300150)SF8,931$1.00$0.40$0.50$0.50
123Temp PVT MK line 4 - paint (70300221)LF10,695$0.40$0.35$0.50$0.35
124Temp PVT MK L4 T4 tape (70307120)LF13,935$1.40$1.30$1.50$1.20
125Temp conc barrier (70400100)LF710$27.00$31.00$39.00$93.50
126Pin temp conc barrier (70400125)EACH264$15.00$26.00$30.00$1.00
127Rel temp conc barrier (70400200)LF617$8.00$4.50$15.00$10.00
128Imp attn temp FRN TL3 (70600260)EACH4$8,800.00$8,000.00$9,000.00$4,438.00
129Imp attn rel FRN TL3 (70600332)EACH4$3,200.00$2,800.00$3,200.00$2,290.00
130Reloc sin pan assy TA (72400500)EACH1$800.00$350.00$200.00$150.00
131Reloc sin pan assy TB (72400600)EACH1$800.00$350.00$200.00$150.00
132THPL PVT MK LTR & sym (78000100)SF37$7.00$7.00$7.00$4.50
133THPL PVT MK line 4 (78000200)LF10,544$1.00$1.00$1.40$0.76
134THPL PVT MK line 6 (78000400)LF329$1.60$1.30$3.00$1.15
135THPL PVT MK line 12 (78000600)LF517$3.30$2.50$4.00$2.27
136THPL PVT MK line 24 (78000650)LF27$7.00$7.00$7.00$4.50
137Raised refl pavt MKR (78100100)EACH68$80.00$73.00$85.00$63.00
138Raised ref PVT MK rem (78300200)EACH68$25.00$15.00$40.00$25.00
139PVT MKG rem grinding (78300201)SF2,432$1.00$1.00$2.00$1.50
140PVT MKG rem WTR blast (78300202)SF991$2.00$5.00$5.00$4.05
141Rebuild EX handhole (89502376)EACH2$2,800.00$1,500.00$4,000.00$2,454.84
IDOT contract 62R73: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy