IDOT contract 61L70 bid tabulation
Barrington, section 24-00093-00-SW. Let by Illinois DOT on September 19, 2025, Cook, District 01. 10 bids received; low bid $220,672 by Triggi Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 43
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Triggi Construction, Inc. | $220,672 | Low |
| 2 | Everlast Blacktop Inc. | $260,077 | +18% |
| 3 | A Lamp Concrete Contractors, Inc. | $261,992 | +19% |
| 4 | Landmark Contractors, Inc. | $276,134 | +25% |
| 5 | Alliance Contractors, Inc. | $300,870 | +36% |
| 6 | Martam Construction Incorporated | $317,181 | +44% |
| 7 | Copenhaver Construction, Inc. | $321,232 | +46% |
| 8 | Acura Inc. | $333,180 | +51% |
| 9 | Meade Inc. | $336,018 | +52% |
| 10 | Davis Concrete Construction Co. | $370,462 | +68% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Triggi Construction, Inc. | 2. Everlast Blacktop Inc. | 3. A Lamp Concrete Contractors, Inc. | 4. Landmark Contractors, Inc. | 5. Alliance Contractors, Inc. | 6. Martam Construction Incorporated |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Rem & rein bric paver (X0327611) | SF | 178 | $21.00 | $20.00 | $21.00 | $10.30 | $21.00 | $26.00 |
| 2 | Curb wall SPL (X1700107) | SF | 91 | $50.00 | $151.00 | $80.00 | $77.00 | $51.00 | $93.69 |
| 3 | Rem/SLV L RT BK walls (X3400001) | LS | 1 | $1,000.00 | $3,500.00 | $750.00 | $1,330.00 | $1,200.00 | $2,051.64 |
| 4 | Temp access- priv ent (X4021000) | EACH | 22 | $1.00 | $200.00 | $175.00 | $71.55 | $10.00 | $610.84 |
| 5 | HMA driveway pavt 3 (X4060280) | SY | 443 | $50.00 | $40.50 | $39.00 | $62.50 | $62.50 | $69.02 |
| 6 | HMA driveway PVT rem (X4400082) | SY | 648 | $25.00 | $14.00 | $16.75 | $12.40 | $20.00 | $11.77 |
| 7 | CC&G RMVL repl < = 10 (X4400501) | LF | 42 | $55.00 | $126.00 | $85.00 | $131.75 | $74.25 | $87.12 |
| 8 | CC&G RMVL repl > 10FT (X4400503) | LF | 166 | $40.00 | $71.00 | $66.00 | $104.50 | $74.25 | $81.53 |
| 9 | CL D patch T3 6 SPL (X4420484) | SY | 22 | $77.50 | $100.00 | $125.00 | $356.45 | $356.45 | $445.68 |
| 10 | Remov EX flar end sec (X5427602) | EACH | 3 | $200.00 | $200.00 | $400.00 | $178.25 | $50.00 | $215.38 |
| 11 | Construction layout (Z0013798) | LS | 1 | $5,750.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $7,794.41 |
| 12 | Drain util STR adj (Z0017400) | EACH | 3 | $500.00 | $650.00 | $550.00 | $350.00 | $350.00 | $810.00 |
| 13 | Tree trunk protection (20101100) | EACH | 15 | $100.00 | $250.00 | $150.00 | $100.00 | $125.00 | $228.80 |
| 14 | Tree root pruning (20101200) | EACH | 15 | $105.00 | $160.00 | $150.00 | $105.00 | $125.00 | $72.80 |
| 15 | Earth excavation (20200100) | CY | 276 | $50.00 | $40.00 | $51.50 | $67.60 | $30.00 | $71.34 |
| 16 | Topsoil F & P 4 (21101615) | SY | 496 | $0.10 | $5.00 | $0.10 | $10.50 | $0.10 | $3.64 |
| 17 | Seeding CL 1A (25000110) | ACRE | 0.25 | $38,720 | $1,200.00 | $38,720 | $6,500.00 | $38,720 | $4,160.00 |
| 18 | Nitrogen fert nutr (25000400) | LB | 23 | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 | $3.12 |
| 19 | Potassium fert nutr (25000600) | LB | 23 | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 | $3.12 |
| 20 | Erosion contr blanket (25100630) | SY | 496 | $1.50 | $2.00 | $1.50 | $8.75 | $1.50 | $10.40 |
| 21 | Inlet & pipe protect (28000500) | EACH | 18 | $125.00 | $1.00 | $50.00 | $328.00 | $125.00 | $130.00 |
| 22 | Inlet filters (28000510) | EACH | 11 | $225.00 | $180.00 | $15.00 | $268.35 | $25.00 | $234.00 |
| 23 | Agg base cse B 4 (35101600) | SY | 908 | $10.00 | $6.12 | $1.00 | $17.70 | $7.00 | $9.82 |
| 24 | PC conc sidewalk 5 (42400200) | SF | 5,836 | $7.75 | $11.40 | $9.00 | $9.55 | $15.35 | $10.36 |
| 25 | PC conc sidewalk 6 (42400300) | SF | 761 | $8.50 | $11.90 | $11.00 | $10.20 | $16.75 | $11.18 |
| 26 | PC conc sidewalk 7 (42400400) | SF | 1,579 | $9.00 | $12.46 | $13.50 | $10.85 | $16.90 | $12.08 |
| 27 | Detectable warnings (42400800) | SF | 62.50 | $25.00 | $54.00 | $35.00 | $49.15 | $30.00 | $43.22 |
| 28 | Sidewalk rem (44000600) | SF | 117 | $3.50 | $2.00 | $6.00 | $3.50 | $3.00 | $6.47 |
| 29 | Pipe culvert remov (50105220) | LF | 22 | $10.00 | $40.00 | $1.00 | $24.40 | $10.00 | $25.67 |
| 30 | P cul CL A 1 12 (542A0217) | LF | 8 | $250.00 | $325.00 | $251.00 | $149.50 | $294.00 | $114.47 |
| 31 | P cul CL C 1 12 (542C0217) | LF | 12 | $265.00 | $325.00 | $283.00 | $149.50 | $249.00 | $109.37 |
| 32 | Metal FL end sec 12" (54262712) | EACH | 1 | $1,250.00 | $650.00 | $1,625.00 | $460.00 | $600.00 | $526.00 |
| 33 | Fire hydnts to BE MVD (56400100) | EACH | 1 | $11,250 | $1,200.00 | $7,150.00 | $9,000.00 | $10,500 | $6,688.54 |
| 34 | Inlets TA T8G (60236200) | EACH | 1 | $3,850.00 | $2,950.00 | $3,650.00 | $2,013.90 | $5,000.00 | $2,135.14 |
| 35 | Man adj new T1F CL (60255800) | EACH | 1 | $1,000.00 | $800.00 | $1,125.00 | $626.15 | $680.00 | $1,182.98 |
| 36 | FR & lids T1 ADA compl OL (60406001) | EACH | 2 | $500.00 | $900.00 | $650.00 | $339.90 | $450.00 | $1,280.15 |
| 37 | Mobilization (67100100) | LS | 1 | $7,500.00 | $14,721 | $15,700 | $19,000 | $18,000 | $19,031 |
| 38 | TR cont & prot 701501 (70102620) | LS | 1 | $5,000.00 | $15,000 | $28,950 | $100.00 | $1.00 | $25,764 |
| 39 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $1.00 | $3,483.00 | $5,450.00 | $7,850.00 | $5,668.00 |
| 40 | Sign panel T1 (72000100) | SF | 66 | $36.00 | $40.00 | $30.00 | $25.00 | $36.00 | $26.00 |
| 41 | Reloc sin pan assy TA (72400500) | EACH | 2 | $250.00 | $350.00 | $150.00 | $300.00 | $250.00 | $312.00 |
| 42 | Teles STL sin support (72800100) | LF | 90 | $20.00 | $40.00 | $18.00 | $15.00 | $20.00 | $15.60 |
| 43 | THPL PVT MK line 12 (78000600) | LF | 180 | $25.00 | $12.00 | $25.00 | $25.00 | $25.00 | $26.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.