Davis Concrete Construction Co.: IDOT bid record

Davis Concrete Construction Co. submitted 30 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 24 APR 2026, and was the low bidder on 4 of them (13%). When it was not low, its total sat a median +21% above the low bid.

Owner
Illinois DOT
Low bid volume
$1,219,543
Latest bid
24 APR 2026
Data through
18 SEP 2026
30Bids
4Low bids
13Win rate, percent
+21%Median gap to the low bid when not low, 26 bids

By year

YearBidsLow bidsWin rate
20214125%
2022300%
2023200%
20246117%
20251119%
20264125%
Davis Concrete Construction Co., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0121314%
District 039111%
Davis Concrete Construction Co., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Inlet filters28000510EACH2015 (75%)$25.00$180.20
Detectable warnings42400800SF2810 (36%)$26.50$37.00
THPL PVT MK line 1278000600LF2210 (45%)$5.05$3.10
Earth excavation20200100CY1910 (53%)$25.00$48.00
Tree trunk protection20101100EACH119 (82%)$25.00$150.00
THPL PVT MK line 678000400LF158 (53%)$2.25$1.40
Tree root pruning20101200EACH148 (57%)$47.50$125.00
THPL PVT MK line 2478000650LF187 (39%)$9.11$6.00
Tree prun 1-1020101300EACH87 (88%)$35.00$75.00
Rem & disp uns matl20201200CY116 (55%)$20.00$44.80
Erosion contr blanket25100630SY125 (42%)$1.39$1.85
Comb CC&G TB6.1260603800LF125 (42%)$41.50$42.50
Davis Concrete Construction Co., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Davis Concrete Construction Co., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
24 APR 202687907District 03Gardner, section 24-00019-00-SW2 of 4$175,879+7.0%
24 APR 202687909District 03Marseiles, section 24-00057-00-SW1 of 6$274,017Low, 3.0% under the second
27 FEB 202661M05District 01South Holland, section 22-00116-00-RS5 of 5$366,692+25%
27 FEB 202661M18District 01Hazel Crest, section 25-00097-00-RS2 of 5$426,537+7.0%
07 NOV 202561L76District 01Maywood, section 24-00144-00-MS1 of 5$298,167Low, 12% under the second
07 NOV 202561L77District 01Hanover Park, section 23-00079-00-SW4 of 9$437,251+22%
07 NOV 202587884District 03Dwight, section 24-00056-00-SW3 of 6$279,243+21%
19 SEP 202561L70District 01Barrington, section 24-00093-00-SW10 of 10$370,462+68%
19 SEP 202561L74District 01Hampshire, section 24-00021-00-SW8 of 8$773,572+118%
19 SEP 202587871District 03Oglesby, section 22-00042-00-SW7 of 7$599,685+111%
01 AUG 202587904District 03City Of Lasalle, section 19-00082-00-SW5 of 7$414,388+22%
13 JUN 202546941District 03Section SR6 of 6$811,053+58%
13 JUN 202587883District 03Bradley, section 21-00100-00-BT4 of 4$394,226+20%
25 APR 202561L29District 01Bloomingdale, section 20-00073-00-RS4 of 10$1,622,144+6.0%
17 JAN 202561K98District 01Batavia, section 22-00088-00-SW2 of 8$496,086+20%
08 NOV 202461K58District 01Berkeley, section 18-00036-00-SW3 of 6$363,564+6.0%
08 NOV 202487870District 03Braceville, section 22-00010-00-SW4 of 4$370,506+49%
26 APR 202461K13District 01Addison, section 23-00110-00-SW3 of 8$568,255+4.0%
26 APR 202461K31District 01Alsip, section 23-00103-00-SW1 of 6$268,435Low, 14% under the second
08 MAR 202461K17District 01Monee, section 22-00034-00-SW4 of 6$471,532+13%
08 MAR 202461K27District 01Sugar Grove, section 20-00031-00-SW5 of 8$228,745+8.0%
22 SEP 202361J66District 01Lombard, section 22-00162-00-BT8 of 8$1,688,354+30%
10 MAR 202387812District 03Grant Park, section 21-00018-00-BT5 of 5$347,054+29%
18 NOV 202261H12District 01Crestwood, section 15-00036-00-BT3 of 6$3,353,510+10%
21 JAN 202261F88District 01Woodridge, section 17-00077-00-SW5 of 7$390,571+27%
Davis Concrete Construction Co.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy