Davis Concrete Construction Co.: IDOT bid record
Davis Concrete Construction Co. submitted 30 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 24 APR 2026, and was the low bidder on 4 of them (13%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $1,219,543
- Latest bid
- 24 APR 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 4 | 1 | 25% |
| 2022 | 3 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
| 2024 | 6 | 1 | 17% |
| 2025 | 11 | 1 | 9% |
| 2026 | 4 | 1 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 21 | 3 | 14% |
| District 03 | 9 | 1 | 11% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Inlet filters | 28000510 | EACH | 20 | 15 (75%) | $25.00 | $180.20 |
| Detectable warnings | 42400800 | SF | 28 | 10 (36%) | $26.50 | $37.00 |
| THPL PVT MK line 12 | 78000600 | LF | 22 | 10 (45%) | $5.05 | $3.10 |
| Earth excavation | 20200100 | CY | 19 | 10 (53%) | $25.00 | $48.00 |
| Tree trunk protection | 20101100 | EACH | 11 | 9 (82%) | $25.00 | $150.00 |
| THPL PVT MK line 6 | 78000400 | LF | 15 | 8 (53%) | $2.25 | $1.40 |
| Tree root pruning | 20101200 | EACH | 14 | 8 (57%) | $47.50 | $125.00 |
| THPL PVT MK line 24 | 78000650 | LF | 18 | 7 (39%) | $9.11 | $6.00 |
| Tree prun 1-10 | 20101300 | EACH | 8 | 7 (88%) | $35.00 | $75.00 |
| Rem & disp uns matl | 20201200 | CY | 11 | 6 (55%) | $20.00 | $44.80 |
| Erosion contr blanket | 25100630 | SY | 12 | 5 (42%) | $1.39 | $1.85 |
| Comb CC&G TB6.12 | 60603800 | LF | 12 | 5 (42%) | $41.50 | $42.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Triggi Construction, Inc. | 16 | 12 of 16 |
| Acura Inc. | 13 | 6 of 13 |
| Alliance Contractors, Inc. | 13 | 4 of 13 |
| D. Construction, Inc. | 11 | 9 of 11 |
| Landmark Contractors, Inc. | 8 | 3 of 8 |
| R. W. Dunteman Company | 8 | 6 of 8 |
| Martam Construction Incorporated | 8 | 4 of 8 |
| A Lamp Concrete Contractors, Inc. | 8 | 7 of 8 |
| M & J Underground Inc. | 7 | 5 of 7 |
| Copenhaver Construction, Inc. | 7 | 3 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 APR 2026 | 87907 | District 03 | Gardner, section 24-00019-00-SW | 2 of 4 | $175,879 | +7.0% |
| 24 APR 2026 | 87909 | District 03 | Marseiles, section 24-00057-00-SW | 1 of 6 | $274,017 | Low, 3.0% under the second |
| 27 FEB 2026 | 61M05 | District 01 | South Holland, section 22-00116-00-RS | 5 of 5 | $366,692 | +25% |
| 27 FEB 2026 | 61M18 | District 01 | Hazel Crest, section 25-00097-00-RS | 2 of 5 | $426,537 | +7.0% |
| 07 NOV 2025 | 61L76 | District 01 | Maywood, section 24-00144-00-MS | 1 of 5 | $298,167 | Low, 12% under the second |
| 07 NOV 2025 | 61L77 | District 01 | Hanover Park, section 23-00079-00-SW | 4 of 9 | $437,251 | +22% |
| 07 NOV 2025 | 87884 | District 03 | Dwight, section 24-00056-00-SW | 3 of 6 | $279,243 | +21% |
| 19 SEP 2025 | 61L70 | District 01 | Barrington, section 24-00093-00-SW | 10 of 10 | $370,462 | +68% |
| 19 SEP 2025 | 61L74 | District 01 | Hampshire, section 24-00021-00-SW | 8 of 8 | $773,572 | +118% |
| 19 SEP 2025 | 87871 | District 03 | Oglesby, section 22-00042-00-SW | 7 of 7 | $599,685 | +111% |
| 01 AUG 2025 | 87904 | District 03 | City Of Lasalle, section 19-00082-00-SW | 5 of 7 | $414,388 | +22% |
| 13 JUN 2025 | 46941 | District 03 | Section SR | 6 of 6 | $811,053 | +58% |
| 13 JUN 2025 | 87883 | District 03 | Bradley, section 21-00100-00-BT | 4 of 4 | $394,226 | +20% |
| 25 APR 2025 | 61L29 | District 01 | Bloomingdale, section 20-00073-00-RS | 4 of 10 | $1,622,144 | +6.0% |
| 17 JAN 2025 | 61K98 | District 01 | Batavia, section 22-00088-00-SW | 2 of 8 | $496,086 | +20% |
| 08 NOV 2024 | 61K58 | District 01 | Berkeley, section 18-00036-00-SW | 3 of 6 | $363,564 | +6.0% |
| 08 NOV 2024 | 87870 | District 03 | Braceville, section 22-00010-00-SW | 4 of 4 | $370,506 | +49% |
| 26 APR 2024 | 61K13 | District 01 | Addison, section 23-00110-00-SW | 3 of 8 | $568,255 | +4.0% |
| 26 APR 2024 | 61K31 | District 01 | Alsip, section 23-00103-00-SW | 1 of 6 | $268,435 | Low, 14% under the second |
| 08 MAR 2024 | 61K17 | District 01 | Monee, section 22-00034-00-SW | 4 of 6 | $471,532 | +13% |
| 08 MAR 2024 | 61K27 | District 01 | Sugar Grove, section 20-00031-00-SW | 5 of 8 | $228,745 | +8.0% |
| 22 SEP 2023 | 61J66 | District 01 | Lombard, section 22-00162-00-BT | 8 of 8 | $1,688,354 | +30% |
| 10 MAR 2023 | 87812 | District 03 | Grant Park, section 21-00018-00-BT | 5 of 5 | $347,054 | +29% |
| 18 NOV 2022 | 61H12 | District 01 | Crestwood, section 15-00036-00-BT | 3 of 6 | $3,353,510 | +10% |
| 21 JAN 2022 | 61F88 | District 01 | Woodridge, section 17-00077-00-SW | 5 of 7 | $390,571 | +27% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.