Triggi Construction, Inc.: IDOT bid record
Triggi Construction, Inc. submitted 47 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 24 APR 2026, and was the low bidder on 21 of them (45%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $17,571,416
- Latest bid
- 24 APR 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 13 | 5 | 38% |
| 2022 | 9 | 5 | 56% |
| 2023 | 3 | 1 | 33% |
| 2024 | 11 | 2 | 18% |
| 2025 | 9 | 6 | 67% |
| 2026 | 2 | 2 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 41 | 19 | 46% |
| District 02 | 3 | 2 | 67% |
| District 03 | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Protective coat | 42001300 | SY | 22 | 21 (95%) | $0.10 | $1.00 |
| Nitrogen fert nutr | 25000400 | LB | 22 | 19 (86%) | $1.00 | $3.00 |
| Potassium fert nutr | 25000600 | LB | 22 | 19 (86%) | $1.00 | $3.00 |
| Supple watering | 25200200 | UNIT | 19 | 19 (100%) | $1.00 | $10.00 |
| Soil disposal analy | 66900530 | EACH | 30 | 18 (60%) | $1,275.00 | $1,470.00 |
| Topsoil F & P 4 | 21101615 | SY | 21 | 18 (86%) | $2.50 | $6.60 |
| Detectable warnings | 42400800 | SF | 36 | 16 (44%) | $29.25 | $37.00 |
| PC conc sidewalk 5 | 42400200 | SF | 36 | 13 (36%) | $10.00 | $10.00 |
| Phosphorus fert nutr | 25000500 | LB | 16 | 13 (81%) | $1.00 | $3.00 |
| Trainees TPG | Z0076604 | HR | 13 | 13 (100%) | $15.00 | $15.00 |
| THPL PVT MK line 24 | 78000650 | LF | 30 | 12 (40%) | $9.62 | $6.00 |
| Valve box adj | 60266600 | EACH | 22 | 12 (55%) | $250.00 | $400.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Alliance Contractors, Inc. | 30 | 9 of 30 |
| Acura Inc. | 25 | 5 of 25 |
| Davis Concrete Construction Co. | 16 | 4 of 16 |
| Martam Construction Incorporated | 15 | 2 of 15 |
| Landmark Contractors, Inc. | 14 | 2 of 14 |
| R. W. Dunteman Company | 13 | 3 of 13 |
| Copenhaver Construction, Inc. | 12 | 3 of 12 |
| A Lamp Concrete Contractors, Inc. | 11 | 4 of 11 |
| MYS, Incorporated | 10 | 1 of 10 |
| D'Land Construction, LLC | 9 | 3 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 APR 2026 | 80B20 | District 01 | Section 2025-1094-RS | 1 of 4 | $1,799,920 | Low, 30% under the second |
| 16 JAN 2026 | 62P93 | District 01 | Section 2021-172-SW | 1 of 5 | $2,633,662 | Low, 9.0% under the second |
| 07 NOV 2025 | 61L77 | District 01 | Hanover Park, section 23-00079-00-SW | 1 of 9 | $359,832 | Low, 4.0% under the second |
| 19 SEP 2025 | 61L70 | District 01 | Barrington, section 24-00093-00-SW | 1 of 10 | $220,672 | Low, 18% under the second |
| 19 SEP 2025 | 61L74 | District 01 | Hampshire, section 24-00021-00-SW | 1 of 8 | $354,811 | Low, 48% under the second |
| 13 JUN 2025 | 61L34 | District 01 | Skokie, section 13-00295-00-BT | 3 of 7 | $2,274,051 | +8.0% |
| 25 APR 2025 | 61L41 | District 01 | Evanston, section 23-00297-00-SW | 1 of 5 | $396,952 | Low, 14% under the second |
| 25 APR 2025 | 62R02 | District 01 | Section 2021-181-SW | 1 of 4 | $1,609,615 | Low, 3.0% under the second |
| 25 APR 2025 | 66R13 | District 03 | Section (108,109)PP | 3 of 3 | $217,795 | +17% |
| 07 MAR 2025 | 61L16 | District 01 | Lake Forest, section 23-00099-00-SW | 2 of 6 | $268,695 | +9.0% |
| 17 JAN 2025 | 61K98 | District 01 | Batavia, section 22-00088-00-SW | 1 of 8 | $414,112 | Low, 20% under the second |
| 08 NOV 2024 | 61K58 | District 01 | Berkeley, section 18-00036-00-SW | 1 of 6 | $341,626 | Low, 4.0% under the second |
| 08 NOV 2024 | 61K59 | District 01 | Berkeley, section 20-00038-00-SW | 3 of 6 | $1,703,550 | +16% |
| 08 NOV 2024 | 62P92 | District 01 | Section 2021-171-SW | 4 of 4 | $1,311,972 | +8.0% |
| 08 NOV 2024 | 62P94 | District 01 | Section 2021-173-SW | 3 of 3 | $1,282,992 | +31% |
| 08 NOV 2024 | 62P98 | District 01 | Section 2021-177-SW | 3 of 4 | $1,891,196 | +26% |
| 20 SEP 2024 | 62P38 | District 01 | Section 2021-125-SW | 4 of 5 | $1,127,175 | +6.0% |
| 20 SEP 2024 | 62P40 | District 01 | Section 2021-123-SW | 3 of 3 | $994,503 | +12% |
| 26 APR 2024 | 61K13 | District 01 | Addison, section 23-00110-00-SW | 4 of 8 | $620,722 | +14% |
| 26 APR 2024 | 61K31 | District 01 | Alsip, section 23-00103-00-SW | 2 of 6 | $305,503 | +14% |
| 08 MAR 2024 | 61K27 | District 01 | Sugar Grove, section 20-00031-00-SW | 1 of 8 | $212,336 | Low, 4.0% under the second |
| 08 MAR 2024 | 87844 | District 03 | Diamond, section 20-00013-00-SW | 3 of 4 | $599,623 | +18% |
| 22 SEP 2023 | 61J66 | District 01 | Lombard, section 22-00162-00-BT | 1 of 8 | $1,298,699 | Low, 4.0% under the second |
| 04 AUG 2023 | 62P42 | District 01 | Section 2021-121-SW | 2 of 4 | $1,071,876 | +22% |
| 20 JAN 2023 | 61J20 | District 01 | Bellwood, section 21-00148-00-RS | 9 of 11 | $997,492 | +17% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.