IDOT contract 80B20 bid tabulation
Section 2025-1094-RS. Let by Illinois DOT on April 24, 2026, Mchenry, District 01. 4 bids received; low bid $1,799,920 by Triggi Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 101
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Triggi Construction, Inc. | $1,799,920 | Low |
| 2 | Martam Construction Incorporated | $2,342,896 | +30% |
| 3 | Acura Inc. | $2,436,086 | +35% |
| 4 | Alliance Contractors, Inc. | $2,447,167 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Triggi Construction, Inc. | 2. Martam Construction Incorporated | 3. Acura Inc. | 4. Alliance Contractors, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Ped signal post 5 FT (X1400378) | EACH | 7 | $3,500.00 | $1,300.00 | $1,250.00 | $3,280.00 |
| 2 | CC&G RMVL repl < = 10 (X4400501) | LF | 132 | $70.00 | $85.00 | $120.00 | $98.60 |
| 3 | CC&G RMVL repl > 10FT (X4400503) | LF | 1,677 | $55.00 | $72.00 | $105.00 | $98.60 |
| 4 | Part depth patch SPL (X4421003) | EACH | 550 | $30.00 | $120.00 | $150.00 | $360.00 |
| 5 | SS cleaned 12 (X5537800) | LF | 1,950 | $1.00 | $10.00 | $2.00 | $1.00 |
| 6 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,000.00 | $5,300.00 | $4,000.00 | $500.00 |
| 7 | Temp info signing (X7200061) | SF | 170 | $15.00 | $18.00 | $18.00 | $18.00 |
| 8 | Accessible ped signal (X8760200) | EACH | 26 | $2,500.00 | $2,100.00 | $2,000.00 | $2,474.00 |
| 9 | Conc FDN TY A 12D (X8780012) | LF | 28 | $450.00 | $400.00 | $400.00 | $450.00 |
| 10 | LED SF lens cover (X8809005) | EACH | 3 | $300.00 | $460.00 | $440.00 | $300.00 |
| 11 | Det loop repl (X8860105) | LF | 620 | $50.00 | $27.00 | $27.00 | $45.75 |
| 12 | Temp TR signal timing (X8900104) | EACH | 7 | $850.00 | $480.00 | $445.00 | $500.00 |
| 13 | Weld wire fab 6X6 (Z0007120) | SY | 1,597 | $10.00 | $8.00 | $30.00 | $7.50 |
| 14 | Construction layout (Z0013798) | LS | 1 | $25,000 | $24,000 | $25,000 | $1.00 |
| 15 | Drainage STR cleaned (Z0018500) | EACH | 130 | $315.00 | $400.00 | $400.00 | $312.00 |
| 16 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 4 | $1,150.00 | $630.00 | $600.00 | $1,300.00 |
| 17 | Pavt fabric epoxy CTD (Z0037100) | SY | 1,663 | $15.00 | $18.00 | $1.00 | $18.50 |
| 18 | RR prot liability ins (Z0048665) | LS | 1 | $10,000 | $8,000.00 | $12,000 | $1.00 |
| 19 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 |
| 20 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 |
| 21 | Earth excavation (20200100) | CY | 110 | $100.00 | $126.00 | $70.00 | $50.00 |
| 22 | Topsoil F & P 4 (21101615) | SY | 513.90 | $0.10 | $8.00 | $9.00 | $6.00 |
| 23 | Sodding salt tolerant (25200110) | SY | 513.90 | $40.00 | $27.00 | $25.00 | $25.00 |
| 24 | Supple watering (25200200) | UNIT | 4.10 | $0.10 | $1.00 | $35.00 | $0.01 |
| 25 | Protective coat (42001300) | SY | 878.30 | $1.50 | $2.00 | $1.00 | $0.01 |
| 26 | PC conc sidewalk 5 (42400200) | SF | 6,233 | $15.00 | $12.00 | $16.00 | $16.50 |
| 27 | Detectable warnings (42400800) | SF | 717 | $35.00 | $45.00 | $50.00 | $40.00 |
| 28 | Sidewalk rem (44000600) | SF | 6,233 | $5.00 | $3.00 | $5.00 | $5.00 |
| 29 | CL B patch T2 10 (44200970) | SY | 1,188 | $145.00 | $165.00 | $152.00 | $278.25 |
| 30 | CL B patch T3 10 (44200974) | SY | 964 | $130.00 | $162.00 | $125.00 | $278.25 |
| 31 | CL B patch T4 10 (44200976) | SY | 892 | $115.00 | $160.00 | $125.00 | $278.25 |
| 32 | Dowel bars 1 1/2 (44201299) | EACH | 4,664 | $15.00 | $35.00 | $18.00 | $8.00 |
| 33 | Saw cuts (44213200) | LF | 12,170 | $2.50 | $5.00 | $4.00 | $3.50 |
| 34 | Tie bars 3/4 (44213204) | EACH | 440 | $10.00 | $28.00 | $15.00 | $2.80 |
| 35 | JT CR RT PCC pav/SHLD (45200100) | LF | 79,688 | $0.05 | $0.20 | $2.30 | $0.04 |
| 36 | JT or crack filling (45200300) | LB | 22,767 | $2.50 | $5.00 | $3.50 | $2.48 |
| 37 | CB adjust (60250200) | EACH | 5 | $500.00 | $600.00 | $800.00 | $250.00 |
| 38 | CB reconst (60252800) | EACH | 1 | $1,000.00 | $1,600.00 | $1,600.00 | $3,600.00 |
| 39 | Man adjust (60255500) | EACH | 5 | $500.00 | $600.00 | $800.00 | $250.00 |
| 40 | Inlets adjust (60260100) | EACH | 5 | $500.00 | $600.00 | $800.00 | $250.00 |
| 41 | FR & grates adjust (60300105) | EACH | 10 | $500.00 | $600.00 | $700.00 | $250.00 |
| 42 | FR & lids adjust (60300305) | EACH | 5 | $500.00 | $600.00 | $700.00 | $250.00 |
| 43 | FR & grates T24 (60404950) | EACH | 5 | $750.00 | $550.00 | $700.00 | $750.00 |
| 44 | FR & lids T1 OL (60406000) | EACH | 5 | $500.00 | $480.00 | $900.00 | $500.00 |
| 45 | FR & lids T1 CL (60406100) | EACH | 5 | $500.00 | $480.00 | $900.00 | $500.00 |
| 46 | Pipe culv cleaned 12 (60920012) | LF | 200 | $2.00 | $15.00 | $3.00 | $2.00 |
| 47 | Pipe culv cleaned 15 (60920015) | LF | 200 | $2.00 | $15.00 | $3.00 | $2.00 |
| 48 | Non SPL waste disposl (66900200) | CY | 110 | $100.00 | $98.00 | $140.00 | $93.00 |
| 49 | Soil disposal analy (66900530) | EACH | 2 | $775.00 | $1,600.00 | $1,500.00 | $900.00 |
| 50 | Reg sub P-const plan (66901001) | LS | 1 | $5,000.00 | $3,500.00 | $3,500.00 | $5,100.00 |
| 51 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $1,400.00 | $1,100.00 | $500.00 |
| 52 | Reg sub mon (66901006) | CAL DAY | 5 | $750.00 | $800.00 | $1,200.00 | $1,750.00 |
| 53 | Mobilization (67100100) | LS | 1 | $50,000 | $144,000 | $146,000 | $62,800 |
| 54 | TR cont & prot 701502 (70102622) | LS | 1 | $6,000.00 | $20,000 | $20,000 | $1.00 |
| 55 | TR cont & prot 701606 (70102625) | LS | 1 | $6,000.00 | $170,000 | $30,000 | $42,000 |
| 56 | TR cont & prot 701602 (70102632) | LS | 1 | $6,000.00 | $1.00 | $1.00 | $1.00 |
| 57 | TR cont & prot 701701 (70102635) | LS | 1 | $6,000.00 | $1.00 | $1.00 | $1.00 |
| 58 | TR cont & prot 701801 (70102640) | LS | 1 | $6,000.00 | $30,000 | $30,000 | $1.00 |
| 59 | TR cont surveillance (70103815) | CAL DAY | 70 | $200.00 | $160.00 | $160.00 | $350.00 |
| 60 | Changeable message SN (70107025) | CAL DAY | 246 | $30.00 | $36.00 | $38.00 | $30.00 |
| 61 | SHRT TRM pavt MK rem (70300150) | SF | 5,350 | $0.35 | $1.00 | $1.30 | $0.40 |
| 62 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 540 | $10.00 | $10.00 | $9.50 | $3.85 |
| 63 | Temp PVT MK L4 T4 tape (70307120) | LF | 9,350 | $1.25 | $1.70 | $1.70 | $1.20 |
| 64 | Temp PVT MK L6 T4 tape (70307130) | LF | 1,715 | $1.75 | $2.50 | $2.40 | $1.88 |
| 65 | Temp PVT MK L12 T4 tape (70307160) | LF | 610 | $3.50 | $5.00 | $5.00 | $3.66 |
| 66 | Temp PVT MK L24 T4 tape (70307210) | LF | 110 | $7.00 | $10.00 | $10.00 | $7.35 |
| 67 | THPL PVT MK line 4 (78000200) | LF | 111 | $9.00 | $11.00 | $27.00 | $14.00 |
| 68 | THPL PVT MK line 6 (78000400) | LF | 28 | $13.25 | $18.00 | $11.00 | $21.00 |
| 69 | THPL PVT MK line 12 (78000600) | LF | 95 | $26.50 | $30.00 | $16.00 | $42.00 |
| 70 | THPL PVT MK line 24 (78000650) | LF | 31 | $52.75 | $55.00 | $26.00 | $84.00 |
| 71 | Pref PL PM TD STD L 7 (78004635) | LF | 4,877 | $8.25 | $10.00 | $47.00 | $11.35 |
| 72 | Mod ureth PM LTR-sym (78009000) | SF | 1,708 | $7.75 | $6.00 | $5.50 | $7.00 |
| 73 | Mod ureth PM line 4 (78009004) | LF | 29,572 | $1.00 | $0.80 | $0.70 | $0.72 |
| 74 | Mod ureth PM line 6 (78009006) | LF | 5,409 | $2.00 | $1.10 | $1.10 | $1.08 |
| 75 | Mod ureth PM line 12 (78009012) | LF | 1,827 | $4.00 | $3.00 | $3.00 | $3.50 |
| 76 | Mod ureth PM line 24 (78009024) | LF | 310 | $8.00 | $6.00 | $5.50 | $7.00 |
| 77 | GRV RCSD PVT MRKG 8 (78011040) | LF | 4,877 | $1.00 | $1.70 | $1.60 | $1.35 |
| 78 | Raised refl pavt MKR (78100100) | EACH | 100 | $50.00 | $70.00 | $69.00 | $56.65 |
| 79 | Replacement reflector (78100300) | EACH | 100 | $10.00 | $20.00 | $20.00 | $32.00 |
| 80 | Raised ref PVT MK rem (78300200) | EACH | 100 | $20.00 | $25.00 | $60.00 | $10.00 |
| 81 | PVT MKG rem WTR blast (78300202) | SF | 2,305 | $3.50 | $2.50 | $2.50 | $2.75 |
| 82 | Undrgrd C galvs 2 (81028200) | LF | 294 | $60.00 | $90.00 | $85.00 | $58.00 |
| 83 | Undrgrd C galvs 3 (81028220) | LF | 6 | $55.00 | $120.00 | $120.00 | $53.00 |
| 84 | HD handhole (81400200) | EACH | 3 | $3,250.00 | $6,900.00 | $7,000.00 | $3,250.00 |
| 85 | Main EX TR sig instal (85000200) | EACH | 5 | $14,500 | $1,870.00 | $2,000.00 | $14,500 |
| 86 | Elcbl C signal 14 2C (87301215) | LF | 1,350 | $5.75 | $6.00 | $6.00 | $5.70 |
| 87 | Elcbl C signal 14 5C (87301245) | LF | 433 | $6.00 | $6.90 | $6.50 | $5.90 |
| 88 | Elcbl C lead 14 1PR (87301305) | LF | 2,185 | $5.75 | $6.00 | $6.00 | $5.70 |
| 89 | Elcbl C egrdc 6 1C (87301900) | LF | 168 | $7.50 | $7.00 | $7.00 | $7.50 |
| 90 | TS post galvs 16 (87502500) | EACH | 1 | $4,150.00 | $2,600.00 | $2,500.00 | $4,150.00 |
| 91 | Conc FDN TY A (87800100) | LF | 4 | $550.00 | $370.00 | $360.00 | $550.00 |
| 92 | Drill EX handhole (87900200) | EACH | 11 | $325.00 | $520.00 | $520.00 | $325.00 |
| 93 | SH LED 1F 3S mam (88030020) | EACH | 1 | $1,750.00 | $1,100.00 | $1,100.00 | $1,745.00 |
| 94 | SH LED 1F 3S BM (88030050) | EACH | 1 | $1,650.00 | $1,300.00 | $1,300.00 | $1,650.00 |
| 95 | Ped SH LED 1F BM CDT (88102717) | EACH | 4 | $1,145.00 | $780.00 | $800.00 | $1,145.00 |
| 96 | TS backplate L F plas (88200410) | EACH | 1 | $650.00 | $240.00 | $230.00 | $650.00 |
| 97 | Det loop T1 (88600100) | LF | 3,440 | $45.75 | $27.00 | $27.00 | $45.75 |
| 98 | Mod EX contr (89502200) | EACH | 3 | $3,750.00 | $1,450.00 | $1,500.00 | $3,745.00 |
| 99 | Rem elcbl FR con (89502300) | LF | 1,600 | $1.50 | $0.20 | $0.18 | $1.50 |
| 100 | Remov EX TS equip (89502375) | EACH | 4 | $725.00 | $330.00 | $320.00 | $685.00 |
| 101 | Remov EX handhole (89502380) | EACH | 3 | $1,000.00 | $1,600.00 | $1,500.00 | $995.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.