IDOT contract 61L41 bid tabulation
Evanston, section 23-00297-00-SW. Let by Illinois DOT on April 25, 2025, Cook, District 01. 5 bids received; low bid $396,952 by Triggi Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 23
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Triggi Construction, Inc. | $396,952 | Low |
| 2 | Alliance Contractors, Inc. | $454,097 | +14% |
| 3 | Landmark Contractors, Inc. | $517,070 | +30% |
| 4 | Acura Inc. | $575,783 | +45% |
| 5 | MYS, Incorporated | $644,568 | +62% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Triggi Construction, Inc. | 2. Alliance Contractors, Inc. | 3. Landmark Contractors, Inc. | 4. Acura Inc. | 5. MYS, Incorporated |
|---|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $15,000 | $15,900 | $11,250 | $15,000 | $27,395 |
| 2 | PC conc sidewalk 5 SP (X4240430) | SF | 225 | $20.00 | $25.05 | $37.10 | $35.00 | $38.13 |
| 3 | CC&G RMVL repl < = 10 (X4400501) | LF | 140 | $75.00 | $88.45 | $163.00 | $150.00 | $169.95 |
| 4 | CC&G RMVL repl > 10FT (X4400503) | LF | 224 | $65.00 | $88.45 | $117.00 | $120.00 | $88.08 |
| 5 | Tree trunk protection (20101100) | EACH | 3 | $250.00 | $100.00 | $250.00 | $200.00 | $275.05 |
| 6 | Tree root pruning (20101200) | EACH | 3 | $250.00 | $75.00 | $250.00 | $75.00 | $275.05 |
| 7 | Earth excavation (20200100) | CY | 21 | $100.00 | $20.00 | $244.55 | $75.00 | $194.01 |
| 8 | Topsoil F & P 4 (21101615) | SY | 627 | $20.00 | $6.00 | $8.00 | $9.00 | $22.00 |
| 9 | Sodding salt tolerant (25200110) | SY | 627 | $35.00 | $19.00 | $16.00 | $20.00 | $38.51 |
| 10 | Supple watering (25200200) | UNIT | 5 | $1.00 | $0.01 | $25.00 | $0.01 | $1.10 |
| 11 | Sub gran mat B (31101100) | CY | 89 | $75.00 | $55.00 | $249.00 | $90.00 | $56.31 |
| 12 | Bit matls tack CT (40800029) | LB | 35 | $1.00 | $1.00 | $0.01 | $15.00 | $6.70 |
| 13 | Incidental HMA surf (40800050) | TON | 7 | $500.00 | $1,075.00 | $545.00 | $1,000.00 | $258.31 |
| 14 | PC conc sidewalk 5 (42400200) | SF | 14,031 | $12.75 | $19.20 | $15.10 | $20.00 | $21.63 |
| 15 | Detectable warnings (42400800) | SF | 424 | $35.00 | $40.00 | $46.15 | $60.00 | $48.32 |
| 16 | HMA surf rem 1 (44000153) | SY | 79 | $50.00 | $20.00 | $25.00 | $120.00 | $30.56 |
| 17 | Sidewalk rem (44000600) | SF | 14,302 | $3.50 | $2.00 | $6.25 | $5.00 | $5.72 |
| 18 | CL D patch T1 6 (44201713) | SY | 78 | $125.00 | $150.00 | $186.00 | $120.00 | $159.18 |
| 19 | Man adjust (60255500) | EACH | 1 | $500.00 | $300.00 | $422.00 | $1,500.00 | $1,606.83 |
| 20 | FR & lids T1 ADA compl OL (60406001) | EACH | 1 | $500.00 | $750.00 | $1,030.00 | $1,500.00 | $1,169.58 |
| 21 | Mobilization (67100100) | LS | 1 | $10,000 | $28,000 | $35,000 | $34,500 | $50,638 |
| 22 | TR cont & prot 701501 (70102620) | LS | 1 | $35,500 | $14,000 | $1.00 | $10,000 | $14,399 |
| 23 | TR cont & prot 701801 (70102640) | LS | 1 | $100.00 | $1.00 | $26,900 | $25,000 | $25,918 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.