Meade Inc. submitted 40 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 14 of them (35%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $170,199,508
- Latest bid
- 12 JUN 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 8 | 2 | 25% |
| 2022 | 5 | 2 | 40% |
| 2023 | 7 | 3 | 43% |
| 2024 | 5 | 2 | 40% |
| 2025 | 8 | 3 | 38% |
| 2026 | 7 | 2 | 29% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 35 | 13 | 37% |
| District 03 | 4 | 1 | 25% |
| District 02 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 19 | 19 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 18 | 18 (100%) | $0.80 | $0.80 |
| Main EX TR sig instal | 85000200 | EACH | 18 | 14 (78%) | $333.75 | $2,600.00 |
| Reg sub mon | 66901006 | CAL DAY | 21 | 9 (43%) | $913.50 | $820.00 |
| Non SPL waste disposl | 66900200 | CY | 20 | 7 (35%) | $105.00 | $92.99 |
| Undrgrd C galvs 2 | 81028200 | LF | 17 | 7 (41%) | $40.00 | $38.08 |
| Fac in exist cab | X8570215 | EACH | 11 | 7 (64%) | $8,777.30 | $8,202.49 |
| Elect serv install | 80400100 | EACH | 13 | 6 (46%) | $5,800.06 | $4,720.33 |
| Rel EM veh PR sys P U | 89501410 | EACH | 11 | 6 (55%) | $145.82 | $231.30 |
| Upgr EX con ntcip SPL | X1400221 | EACH | 9 | 6 (67%) | $800.94 | $939.61 |
| Lum LED rdwy H | 82110008 | EACH | 8 | 6 (75%) | $638.35 | $964.16 |
| Soil disposal analy | 66900530 | EACH | 20 | 5 (25%) | $1,580.50 | $1,470.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| H & H Electric Co. | 19 | 16 of 19 |
| John Burns Construction Company | 14 | 6 of 14 |
| Hecker and Company, Inc. | 12 | 6 of 12 |
| Electric Conduit Construction | 10 | 4 of 10 |
| Home Towne Electric, Inc. | 3 | 1 of 3 |
| Thorne Electric, Inc. | 3 | 1 of 3 |
| Helm Electric Facility Solutions, Inc. d/b/a Helm Electric | 3 | 2 of 3 |
| Utility Dynamics Corporation | 3 | 1 of 3 |
| Davis Concrete Construction Co. | 3 | 0 of 3 |
| Lyons Electric Company, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JUN 2026 | 62W83 | District 01 | Section 2024-957-TS | 3 of 4 | $2,446,109 | +19% |
| 24 APR 2026 | 62Y28 | District 01 | Section 2025-1076-I | 1 of 2 | $9,649,148 | Low, 44% under the second |
| 27 FEB 2026 | 61M20 | District 01 | Oak Lawn, section 24-00199-00-LT | 2 of 5 | $387,973 | +22% |
| 27 FEB 2026 | 61M21 | District 01 | Oak Lawn, section 24-00198-00-LT | 2 of 5 | $398,947 | +22% |
| 27 FEB 2026 | 62R19 | District 01 | Section FAI | 1 of 2 | $12,989,531 | Low, 39% under the second |
| 27 FEB 2026 | 62W92 | District 01 | Section 2024-967-TS | 3 of 4 | $2,242,203 | +19% |
| 16 JAN 2026 | 61M02 | District 01 | Elgin, section 22-00197-00-TL | 2 of 3 | $605,903 | +4.0% |
| 19 SEP 2025 | 61L70 | District 01 | Barrington, section 24-00093-00-SW | 9 of 10 | $336,018 | +52% |
| 19 SEP 2025 | 62W89 | District 01 | Section 2024-964-TS | 1 of 1 | $1,997,198 | Low |
| 19 SEP 2025 | 87871 | District 03 | Oglesby, section 22-00042-00-SW | 3 of 7 | $339,530 | +20% |
| 01 AUG 2025 | 87904 | District 03 | City Of Lasalle, section 19-00082-00-SW | 2 of 7 | $347,710 | +2.0% |
| 13 JUN 2025 | 62N39 | District 01 | Section 2020-266-SUR,SW&TS | 1 of 2 | $20,875,047 | Low, 23% under the second |
| 13 JUN 2025 | 62W15 | District 01 | Section FAI | 4 of 4 | $2,103,651 | +23% |
| 13 JUN 2025 | 62W90 | District 01 | Section 2024-965-TS | 2 of 2 | $3,703,259 | +10% |
| 13 JUN 2025 | 66P96 | District 03 | Section D3 | 1 of 1 | $341,893 | Low |
| 20 SEP 2024 | 62V17 | District 01 | Section FAP | 1 of 3 | $9,281,773 | Low, 17% under the second |
| 20 SEP 2024 | 62W79 | District 01 | Section 2024-961-ELE | 1 of 1 | $49,297,581 | Low |
| 14 JUN 2024 | 62N32 | District 01 | Section 2020-265-SUR,SW&TS | 3 of 3 | $18,079,862 | +18% |
| 14 JUN 2024 | 62N40 | District 01 | Section 2020-264-SUR,SW&TS | 2 of 4 | $18,618,652 | +9.0% |
| 19 JAN 2024 | 64R56 | District 02 | Section ILU | 4 of 4 | $758,500 | +25% |
| 17 NOV 2023 | 62R83 | District 01 | Section 2023 | 2 of 3 | $1,688,016 | +25% |
| 17 NOV 2023 | 62U86 | District 01 | Section 2023 | 1 of 2 | $683,765 | Low, 9.0% under the second |
| 17 NOV 2023 | 62W13 | District 01 | Section 2023 | 1 of 2 | $472,427 | Low, 13% under the second |
| 22 SEP 2023 | 62D82 | District 01 | Section 2016-071L | 2 of 3 | $3,847,169 | +20% |
| 22 SEP 2023 | 62U48 | District 01 | Section 2022 | 4 of 5 | $4,158,330 | +20% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.