IDOT contract 61L85 bid tabulation

Project Number: 50B4-000 / /, section 18-00488-00-BR. Let by Illinois DOT on September 18, 2026, Mchenry, District 01. 5 bids received; low bid $4,751,000 by ICC Group Inc..

Owner
Illinois DOT
Letting
18 SEP 2026
Pay items
107
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1ICC Group Inc.$4,751,000Low
2Lorig Construction Company$5,298,411+12%
3Dunnet Bay Construction Company$5,419,964+14%
4Herlihy Mid-Continent Company$5,859,962+23%
5F. H. Paschen, S.N. Nielsen & Associates LLC$6,747,517+42%
IDOT contract 61L85: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. ICC Group Inc.2. Lorig Construction Company3. Dunnet Bay Construction Company4. Herlihy Mid-Continent Company5. F. H. Paschen, S.N. Nielsen & Associates LLC
1Outfall structure (XX007061)EACH1$5,100.00$5,000.00$1,200.00$5,740.00$5,404.00
2Rodent shields (X0322278)EACH10$20.00$150.00$83.00$345.00$165.00
3Washout basin (X0326806)LS1$5,000.00$500.00$2,000.00$5,500.00$3,376.05
4Relocate EX mailbox (X0327301)EACH4$200.00$1,100.00$250.00$800.00$1,500.00
5Temporary fence SPL (X2011000)LF32$125.00$65.00$21.00$58.60$80.00
6Eros cont blanket SPL (X2511630)SY1,668$1.80$2.00$1.90$2.90$2.90
7Temp access- priv ent (X4021000)EACH4$1,250.00$1,100.00$500.00$1,100.00$1,275.00
8Temp access- com ent (X4022000)EACH1$1,750.00$1,600.00$500.00$1,800.00$2,634.25
9Temp access- FLD ent (X4024000)EACH3$1,250.00$1,600.00$500.00$1,100.00$2,847.79
10Dewatering (X5021507)LS1$10,000$1,000.00$1.00$125,000$77,581
11BR deck grooving long (X5030250)SY659$10.47$13.00$12.00$12.68$17.81
12Bar terminators (X5080530)EACH386$30.00$34.00$22.36$22.55$27.54
13Retaining wall remov (X5220101)SF40$65.00$100.00$55.00$100.00$75.00
14Fence removal (X6640104)LF150$10.00$10.00$10.00$9.74$10.00
15Engr FLD off A mod (X6700405)CAL MO9$3,200.00$4,000.00$3,500.00$5,000.00$5,200.00
16Traf cont & prot SPL (X7010216)LS1$17,664$200,000$50,000$50,000$250,000
17Temp info signing (X7200061)SF95$15.00$20.00$15.00$15.00$18.00
18Steel railing SPL (Z0007124)LF452$478.00$465.00$465.00$463.71$478.00
19Stab constr entrance (Z0013797)SY244$55.00$3.00$10.00$42.00$52.23
20Construction layout (Z0013798)LS1$28,000$115,000$1.00$150,000$202,000
21Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80$0.80
22Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00$15.00
23Tree remov 6-15 (20100110)UNIT568$17.00$17.00$35.00$17.00$17.00
24Tree remov over 15 (20100210)UNIT317$24.00$24.00$45.00$24.00$24.00
25Temporary fence (20101000)LF950$3.00$3.00$3.00$2.90$2.90
26Tree root pruning (20101200)EACH12$150.00$150.00$70.00$150.00$150.00
27Tree prun 1-10 (20101300)EACH4$50.00$50.00$40.00$50.00$50.00
28Tree prun over 10 (20101350)EACH8$75.00$75.00$90.00$75.00$75.00
29Earth excavation (20200100)CY2,838$26.00$43.00$20.00$35.00$53.51
30Rem & disp uns matl (20201200)CY1,686$18.50$55.00$80.00$75.00$49.72
31Channel excavation (20300100)CY2,356$18.50$60.00$20.00$65.00$49.84
32Furnished excavation (20400800)CY50$50.00$95.00$65.00$75.00$75.10
33Geotech fab F/GR stab (21001000)SY6,370$2.25$3.00$4.00$1.80$2.38
34Topsoil exc & plac (21101505)CY2,673$28.00$1.00$34.00$12.00$26.89
35Seeding CL 2A (25000210)ACRE1.25$2,300.00$2,300.00$3,313.00$4,500.00$4,500.00
36Seeding CL 4 (25000310)ACRE0.25$3,500.00$3,500.00$1,947.00$4,500.00$4,500.00
37Seeding CL 4B (25000314)ACRE0.25$5,500.00$5,500.00$3,292.00$9,000.00$9,000.00
38Seeding CL 5 (25000320)ACRE0.25$4,500.00$4,500.00$4,887.00$10,000$10,000
39Nitrogen fert nutr (25000400)LB116$4.00$4.00$4.00$3.30$3.30
40Potassium fert nutr (25000600)LB116$4.00$4.00$4.00$3.30$3.30
41Wildlife friendly ecb (25100645)SY6,225$1.80$2.00$1.90$2.00$2.00
42Temp eros contr seed (28000250)LB173$5.00$5.00$4.00$14.00$14.00
43Temp ditch checks (28000305)LF227$9.00$9.00$4.30$11.00$11.00
44Perimeter eros bar (28000400)LF5,722$2.75$3.00$2.10$3.50$3.50
45Temp WLDLF frndly ecb (28001105)SY6,684$1.10$1.25$1.80$1.75$1.75
46Stone riprap CL A3 (28100105)SY228$115.00$135.00$135.00$115.00$75.00
47Stone riprap CL A4 (28100107)SY1,793$115.00$135.00$122.00$145.00$103.52
48Filter fabric (28200200)SY2,275$2.00$3.00$4.00$2.50$2.41
49Articul block rev mat (28500400)SY155$400.00$335.00$546.00$300.00$300.00
50Agg subgrade improve (30300001)CY1,083$66.00$65.00$40.00$105.00$82.65
51Agg subgrade impr 12 (30300112)SY4,014$24.00$33.00$22.00$35.00$29.63
52Agg base cse B 6 (35101800)SY373$24.50$25.00$20.00$15.00$12.29
53Agg base cse B 8 (35102000)SY626$28.00$32.00$23.00$20.00$16.93
54Bit matls PR CT (40600275)LB9,863$0.01$0.01$0.01$0.01$0.01
55Bit matls tack CT (40600290)LB1,524$0.01$0.01$0.01$0.01$0.01
56Long joint sealant (40600370)LF5,828$4.28$4.50$4.28$4.28$4.28
57HMA SC IL-9.5 D N50 (40604060)TON105$125.00$135.00$125.00$125.00$125.00
58HMA pavt FD 10 (40701881)SY2,374$52.00$60.00$52.00$52.00$52.00
59Welded wire reinf (42000060)SY125$30.00$25.00$0.01$22.00$78.81
60PVT con PCC BR app SL (42000080)SY125$290.00$300.00$238.00$240.00$459.92
61Protective coat (42001300)SY125$5.00$2.50$5.00$3.50$5.00
62Pavement rem (44000100)SY2,696$20.00$17.00$20.00$26.00$37.58
63Drive pavement rem (44000200)SY111$23.00$10.00$28.00$27.00$18.30
64HMA shoulders 2 (48203005)SY286$31.00$40.00$31.00$31.00$31.00
65HMA shoulders 10 (48203037)SY1,013$49.00$55.00$49.00$49.00$49.00
66Rem exist struct (50100100)EACH1$283,335$600,000$1,075,000$673,000$595,000
67Pipe culvert remov (50105220)LF245$26.50$35.00$22.00$44.00$21.00
68Structure excavation (50200100)CY206$85.00$55.00$65.00$50.00$94.13
69Cofferdam excavation (50200300)CY57$65.00$55.00$1.00$50.00$128.94
70Cofferdam typ 1 loc 1 (50201101)EACH1$15,000$1,000.00$1.00$100,000$25,000
71Conc struct (50300225)CY131.80$1,265.00$1,300.00$1,000.00$980.00$2,550.00
72Conc sup-STR (50300255)CY356.70$1,200.00$800.00$600.00$1,353.00$2,050.00
73Concrete encasement (50300280)CY5.50$2,700.00$1,700.00$1,100.00$1,900.00$3,500.00
74Protective coat (50300300)SY1,222$3.00$2.25$2.50$3.50$10.00
75Conc supstr app slab (50301350)CY97$800.00$750.00$715.00$650.00$1,131.44
76F&E PP con beams IL36 (50401310)LF1,451$830.00$725.00$800.00$800.00$954.00
77Reinf bars, epoxy CTD (50800205)LB153,250$1.60$1.85$1.77$1.60$2.12
78Fur STL pile HP14X89 (51201900)LF1,344$170.00$125.00$130.00$95.00$110.00
79Driving piles (51202305)LF1,344$1.00$1.00$0.01$1.00$1.00
80Test pile ST HP14X89 (51203900)EACH3$15,000$12,000$20,000$36,000$5,500.00
81Pile shoes (51204650)EACH24$300.00$175.00$170.00$176.00$140.00
82Name plates (51500100)EACH1$1,500.00$1,100.00$1,200.00$1,000.00$2,500.00
83P cul CL D 1 15 (542D0220)LF392$60.50$100.00$170.00$108.00$111.00
84SLP MT ES WG 15",1:6 (54260715)EACH16$1,800.00$1,600.00$1,400.00$1,235.00$2,164.00
85Granular backfill STR (58600101)CY128$70.00$140.00$112.00$65.00$70.49
86Concrete sealer (58700300)SF1,850$3.00$5.00$5.00$2.00$2.00
87Geocomposite wall DR (59100100)SY74$55.00$45.00$19.00$20.00$30.00
88Conc HDWL for P drain (60100060)EACH9$450.00$1,400.00$705.00$689.00$1,404.00
89Pipe underdrain 4 SP (60108100)LF80$31.00$43.00$45.00$47.00$48.00
90Pipe underdr T 2 4 (60108204)LF1,980$19.00$46.00$50.00$38.50$47.00
91P undr for struct 4 (60146304)LF110$93.20$55.00$58.00$40.00$90.00
92SPBGR TY A 9FT posts (63000003)LF256.25$51.00$52.00$51.00$47.60$51.00
93Traf bar term T6 (63100085)EACH4$5,200.00$4,500.00$5,290.00$3,581.00$5,200.00
94TR bar TRM T1 SPL tan (63100167)EACH4$4,200.00$3,700.00$4,100.00$3,491.00$4,200.00
95Guardrail remov (63200310)LF322$10.00$7.80$9.00$7.80$10.00
96Fur erect row markers (66600105)EACH17$200.00$550.00$168.00$1,200.00$800.00
97Mobilization (67100100)LS1$285,000$300,000$325,198$350,000$410,000
98SHRT TRM pavt MK rem (70300150)SF1,699$0.75$0.40$0.01$0.40$0.40
99Temp PVT MK L4 T4 tape (70307120)LF5,100$1.20$0.10$0.01$1.20$0.01
100Terminal marker - DA (72501000)EACH4$20.00$40.00$20.00$40.00$20.00
101Pref PL PM TD STD L4 (78004620)LF2,550$4.50$4.50$4.50$4.50$4.50
102Pref PL PM TD STD L 6 (78004630)LF2,550$5.50$5.50$5.50$5.50$5.50
103GRV RCSD PVT MRKG 5 (78011025)LF1,944$1.25$1.25$1.25$1.25$1.25
104GRV RCSD PVT MRKG 7 (78011035)LF1,944$1.50$1.50$1.50$1.50$1.50
105Grdrail ref type A (78200005)EACH8$20.00$13.40$20.00$13.40$20.00
106Barr wall ref type B (78200010)EACH6$20.00$20.00$20.00$20.00$15.00
107PVT MKG rem WTR blast (78300202)SF29$75.00$175.00$155.20$155.20$175.00
IDOT contract 61L85: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy