IDOT contract 61L19 bid tabulation

Waukegan, section 20-00243-00-BR. Let by Illinois DOT on January 16, 2026, Lake, District 01. 3 bids received; low bid $7,980,812 by Dunnet Bay Construction Company.

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
125
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Dunnet Bay Construction Company$7,980,812Low
2Lorig Construction Company$7,989,7390.0%
3Rausch Infrastructure, LLC$8,234,574+3.0%
IDOT contract 61L19: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Dunnet Bay Construction Company2. Lorig Construction Company3. Rausch Infrastructure, LLC
1Stump removal only (X2010400)UNIT186$10.00$5.00$5.80
2Clearing & grubbing (X2010510)LS1$4,500.00$6,500.00$7,572.50
3Explor trench SPL (X2130010)LF100$85.00$125.00$58.20
4Bar terminators (X5080530)EACH608$51.03$35.00$42.80
5Parapet railing SPL (X5091755)LF291$339.91$345.00$339.91
6Man reconst SPL (X6028000)EACH1$10,000$7,000.00$9,217.40
7Plug pipe penetration (X6050188)EACH1$2,100.00$2,600.00$1,903.60
8SPBGR (short radius) (X6330725)LF175$35.50$36.00$41.30
9Rem imp atten SM (X6431120)EACH2$2,000.00$1,200.00$873.70
10Traf cont & prot SPL (X7010216)LS1$25,000$400,000$29,125
11Rem temp conc barrier (X7040650)LF401$20.00$12.00$19.80
12Temp info signing (X7200061)SF75$18.00$20.00$16.30
13Temp TR signal timing SPL (X8900106)EACH2$720.00$1,000.00$699.00
14Approach slab rem (Z0004552)SY392$63.48$59.00$49.70
15Construction layout (Z0013798)LS1$8,705.40$235,000$33,203
16Pref joint filler (Z0043900)LF98$15.00$22.00$16.20
17RR prot liability ins (Z0048665)LS1$22,000$16,000$9,320.00
18Trainees (Z0076600)HR1,000$0.80$0.80$0.80
19Trainees TPG (Z0076604)HR1,000$15.00$15.00$15.00
20Tree remov 6-15 (20100110)UNIT157$35.00$25.00$29.10
21Tree remov over 15 (20100210)UNIT18$55.00$32.00$37.20
22Temporary fence (20101000)LF1,561$2.98$3.00$3.40
23Earth excavation (20200100)CY1,695$30.00$20.00$60.00
24Rem & disp uns matl (20201200)CY2,120$0.01$24.00$42.00
25Furnished excavation (20400800)CY1,075$25.00$65.00$72.00
26Geotech fab F/GR stab (21001000)SY1,252$2.25$3.00$3.50
27Topsoil F & P 6 (21101625)SY1,095$11.50$10.00$11.50
28Seeding CL 2A (25000210)ACRE0.25$2,750.00$3,500.00$2,750.00
29Seeding CL 5 (25000320)ACRE1$4,531.00$6,000.00$4,531.00
30Nitrogen fert nutr (25000400)LB23$3.00$3.00$3.00
31Potassium fert nutr (25000600)LB23$3.00$3.00$3.00
32Erosion contr blanket (25100630)SY4,658$1.41$1.50$1.41
33Temp eros contr seed (28000250)LB102$4.00$4.00$4.00
34Perimeter eros bar (28000400)LF1,610$3.65$2.25$3.65
35Inlet filters (28000510)EACH3$295.00$250.00$295.00
36Temp eros contr blank (28001100)SY4,653$0.97$1.30$0.97
37Agg subgrade improve (30300001)CY1,252$50.00$40.00$85.00
38Agg subgrade impr 12 (30300112)SY6,273$42.00$28.00$35.00
39Stab subbase HMA 4 (31200500)SY247$56.60$61.00$65.90
40Agg base cse B 6 (35101800)SY46$33.00$33.00$84.50
41HMA base cse 6 1/4 (35501309)SY5,008$34.55$39.00$34.55
42Bit matls tack CT (40600290)LB4,508$0.01$0.01$0.01
43HMA BC IL-19.0 N50 (40603080)TON632$91.75$97.00$91.75
44HMA SC IL-9.5 D N50 (40604060)TON421$102.00$110.00$102.00
45Welded wire reinf (42000060)SY247$44.57$18.00$8.00
46PVT con PCC BR app SL (42000080)SY247$200.00$183.00$165.36
47PC conc sidewalk 5 (42400200)SF1,981$12.00$15.00$12.31
48Pavement rem (44000100)SY4,893$21.50$51.50$32.60
49Comb curb gutter rem (44000500)LF2,167$10.00$10.00$11.80
50Sidewalk rem (44000600)SF1,622$3.00$4.00$3.20
51Median removal (44003100)SF3,804$8.00$2.00$8.10
52Aggregate SHLDS B 6 (48101500)SY81$39.00$41.00$102.60
53Rem exist struct (50100100)EACH1$627,000$1,400,000$1,000,000
54Slope wall remov (50104650)SY1,108$27.57$16.00$27.80
55Protective shield (50157300)SY683$0.01$1.00$145.00
56Structure excavation (50200100)CY5,548$120.00$50.00$23.00
57Conc struct (50300225)CY250.50$600.00$1,000.00$625.00
58Conc sup-STR (50300255)CY502.10$1,400.00$825.00$925.00
59BR deck grooving (50300260)SY1,114$8.30$7.00$9.10
60Protective coat (50300300)SY1,748$3.58$1.75$2.90
61Conc supstr app slab (50301350)CY231.50$700.00$625.00$515.00
62F&E PP con beams IL45 (50401320)LF1,491$700.00$660.00$690.00
63Reinf bars, epoxy CTD (50800205)LB203,800$1.69$1.65$1.65
64Fur M S pile 16X0.375 (51200963)LF780$179.00$100.00$220.00
65Driving piles (51202305)LF780$0.01$1.00$1.00
66Test pile met shells (51203200)EACH2$20,000$2,000.00$10,000
67Pile shoes (51204650)EACH13$470.00$500.00$470.00
68Name plates (51500100)EACH1$1,000.00$800.00$1,747.50
69Elast bearing assy T1 (52100010)EACH13$2,281.00$2,300.00$3,528.50
70Anchor bolts 1 (52100520)EACH26$200.00$200.00$183.00
71Mech ST earth ret WL (52200500)SF7,884$155.00$100.00$192.80
72Storm sewer rem 12 (55100500)LF24$81.00$75.00$125.80
73CB recon new T11F&G (60254100)EACH3$3,500.00$4,100.00$9,217.40
74Remov catch bas (60500050)EACH1$1,800.00$2,100.00$2,625.90
75Comb CC&G TY B-6.24 (60605000)LF1,219$70.65$56.00$45.25
76Conc median surf 4 (60618300)SF368$18.95$8.00$12.87
77Conc med TSB6.12 (60619600)SF466$10.30$25.00$18.52
78SPBGR TY A 6FT posts (63000001)LF650$44.06$30.00$29.38
79Traf bar term T2 (63100045)EACH6$1,519.00$1,550.00$1,519.00
80Traf bar term T5 (63100070)EACH1$1,289.60$1,200.00$1,108.00
81Traf bar term T6 (63100085)EACH3$4,176.05$3,900.00$3,861.20
82Guardrail remov (63200310)LF1,067$6.90$7.00$8.00
83Non SPL waste disposl (66900200)CY9,165$65.00$40.00$70.00
84Soil disposal analy (66900530)EACH4$850.00$1,500.00$1,689.20
85Reg sub P-const plan (66901001)LS1$5,800.00$3,100.00$3,611.50
86Reg sub F con report (66901003)LS1$500.00$1,200.00$1,398.00
87Reg sub mon (66901006)CAL DAY30$715.00$2,200.00$792.20
88Engr field office A (67000400)CAL MO15$4,566.21$3,900.00$4,000.00
89Mobilization (67100100)LS1$478,849$425,000$492,620
90Changeable message SN (70107025)CAL DAY150$30.00$30.00$31.40
91SHRT TRM pavt MK rem (70300150)SF178$3.00$11.00$0.70
92Temp PVT MK L4 T4 tape (70307120)LF440$2.25$2.25$1.30
93Temp PVT MK L24 T4 tape (70307210)LF16$15.00$15.00$8.40
94Sign panel T1 (72000100)SF51$30.00$30.00$34.90
95Remov sin pan assy TA (72400100)EACH8$100.00$10.00$58.20
96Teles STL sin support (72800100)LF56$20.00$20.00$25.60
97Base tel STL sin supp (73100100)EACH4$250.00$250.00$407.70
98THPL PVT MK LTR & sym (78000100)SF52$5.75$5.75$9.00
99THPL PVT MK line 4 (78000200)LF2,970$1.45$1.50$1.50
100THPL PVT MK line 6 (78000400)LF165$1.72$2.00$2.25
101THPL PVT MK line 8 (78000500)LF450$1.95$2.00$3.00
102THPL PVT MK line 12 (78000600)LF782$3.32$3.50$4.50
103THPL PVT MK line 24 (78000650)LF73$5.75$6.00$9.00
104Polyurea PM T2 LTR-SY (78008300)SF58$14.50$14.50$42.00
105Polyurea PM T2 LN 4 (78008310)LF762$5.80$6.00$7.00
106Polyurea PM T2 LN 6 (78008330)LF180$7.80$8.00$10.50
107Polyurea PM T2 LN 8 (78008340)LF22$10.60$11.00$14.00
108Polyurea PM T2 LN 12 (78008350)LF74$14.95$15.00$21.00
109Raised refl pavt MKR (78100100)EACH6$750.00$750.00$1,250.00
110Grdrail ref type A (78200005)EACH28$11.00$11.00$12.80
111Raised ref PVT MK rem (78300200)EACH6$11.62$25.00$97.00
112Elect serv install (80400100)EACH1$5,513.40$5,700.00$5,513.40
113Elect util serv conn (80400200)LS1$5,000.00$5,000.00$5,000.00
114Undrgrd C galvs 1 1/2 (81028190)LF500$31.60$32.00$31.60
115Undrgrd C galvs 3 (81028220)LF100$91.30$92.00$91.30
116Undrgrd C PVC 1 (81028320)LF110$42.10$44.00$42.10
117Con at ST 1 PVC GS (81100320)LF280$70.80$72.00$70.80
118Jun BX SS as 12X12X6 (81300550)EACH1$1,695.20$1,800.00$1,695.20
119EC C XLP use 1C 10 (81702110)LF1,320$3.90$4.00$3.90
120EC C XLP use 1C 4 (81702140)LF1,300$7.60$8.00$7.60
121Lum LED rdwy H (82110008)EACH2$1,183.10$1,200.00$1,183.10
122Lum LED UP sus E (82110027)EACH4$5,128.40$5,200.00$5,128.40
123LT cont basem 240V100 (82500350)EACH1$24,340$25,000$24,340
124LT P A 47.5MH 15MA (83050810)EACH2$7,589.30$7,700.00$7,589.30
125Light pole FDN 24D (83600200)LF20$476.50$500.00$476.50
IDOT contract 61L19: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy