IDOT contract 61L19 bid tabulation
Waukegan, section 20-00243-00-BR. Let by Illinois DOT on January 16, 2026, Lake, District 01. 3 bids received; low bid $7,980,812 by Dunnet Bay Construction Company.
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 125
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dunnet Bay Construction Company | $7,980,812 | Low |
| 2 | Lorig Construction Company | $7,989,739 | 0.0% |
| 3 | Rausch Infrastructure, LLC | $8,234,574 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dunnet Bay Construction Company | 2. Lorig Construction Company | 3. Rausch Infrastructure, LLC |
|---|---|---|---|---|---|---|
| 1 | Stump removal only (X2010400) | UNIT | 186 | $10.00 | $5.00 | $5.80 |
| 2 | Clearing & grubbing (X2010510) | LS | 1 | $4,500.00 | $6,500.00 | $7,572.50 |
| 3 | Explor trench SPL (X2130010) | LF | 100 | $85.00 | $125.00 | $58.20 |
| 4 | Bar terminators (X5080530) | EACH | 608 | $51.03 | $35.00 | $42.80 |
| 5 | Parapet railing SPL (X5091755) | LF | 291 | $339.91 | $345.00 | $339.91 |
| 6 | Man reconst SPL (X6028000) | EACH | 1 | $10,000 | $7,000.00 | $9,217.40 |
| 7 | Plug pipe penetration (X6050188) | EACH | 1 | $2,100.00 | $2,600.00 | $1,903.60 |
| 8 | SPBGR (short radius) (X6330725) | LF | 175 | $35.50 | $36.00 | $41.30 |
| 9 | Rem imp atten SM (X6431120) | EACH | 2 | $2,000.00 | $1,200.00 | $873.70 |
| 10 | Traf cont & prot SPL (X7010216) | LS | 1 | $25,000 | $400,000 | $29,125 |
| 11 | Rem temp conc barrier (X7040650) | LF | 401 | $20.00 | $12.00 | $19.80 |
| 12 | Temp info signing (X7200061) | SF | 75 | $18.00 | $20.00 | $16.30 |
| 13 | Temp TR signal timing SPL (X8900106) | EACH | 2 | $720.00 | $1,000.00 | $699.00 |
| 14 | Approach slab rem (Z0004552) | SY | 392 | $63.48 | $59.00 | $49.70 |
| 15 | Construction layout (Z0013798) | LS | 1 | $8,705.40 | $235,000 | $33,203 |
| 16 | Pref joint filler (Z0043900) | LF | 98 | $15.00 | $22.00 | $16.20 |
| 17 | RR prot liability ins (Z0048665) | LS | 1 | $22,000 | $16,000 | $9,320.00 |
| 18 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 19 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 20 | Tree remov 6-15 (20100110) | UNIT | 157 | $35.00 | $25.00 | $29.10 |
| 21 | Tree remov over 15 (20100210) | UNIT | 18 | $55.00 | $32.00 | $37.20 |
| 22 | Temporary fence (20101000) | LF | 1,561 | $2.98 | $3.00 | $3.40 |
| 23 | Earth excavation (20200100) | CY | 1,695 | $30.00 | $20.00 | $60.00 |
| 24 | Rem & disp uns matl (20201200) | CY | 2,120 | $0.01 | $24.00 | $42.00 |
| 25 | Furnished excavation (20400800) | CY | 1,075 | $25.00 | $65.00 | $72.00 |
| 26 | Geotech fab F/GR stab (21001000) | SY | 1,252 | $2.25 | $3.00 | $3.50 |
| 27 | Topsoil F & P 6 (21101625) | SY | 1,095 | $11.50 | $10.00 | $11.50 |
| 28 | Seeding CL 2A (25000210) | ACRE | 0.25 | $2,750.00 | $3,500.00 | $2,750.00 |
| 29 | Seeding CL 5 (25000320) | ACRE | 1 | $4,531.00 | $6,000.00 | $4,531.00 |
| 30 | Nitrogen fert nutr (25000400) | LB | 23 | $3.00 | $3.00 | $3.00 |
| 31 | Potassium fert nutr (25000600) | LB | 23 | $3.00 | $3.00 | $3.00 |
| 32 | Erosion contr blanket (25100630) | SY | 4,658 | $1.41 | $1.50 | $1.41 |
| 33 | Temp eros contr seed (28000250) | LB | 102 | $4.00 | $4.00 | $4.00 |
| 34 | Perimeter eros bar (28000400) | LF | 1,610 | $3.65 | $2.25 | $3.65 |
| 35 | Inlet filters (28000510) | EACH | 3 | $295.00 | $250.00 | $295.00 |
| 36 | Temp eros contr blank (28001100) | SY | 4,653 | $0.97 | $1.30 | $0.97 |
| 37 | Agg subgrade improve (30300001) | CY | 1,252 | $50.00 | $40.00 | $85.00 |
| 38 | Agg subgrade impr 12 (30300112) | SY | 6,273 | $42.00 | $28.00 | $35.00 |
| 39 | Stab subbase HMA 4 (31200500) | SY | 247 | $56.60 | $61.00 | $65.90 |
| 40 | Agg base cse B 6 (35101800) | SY | 46 | $33.00 | $33.00 | $84.50 |
| 41 | HMA base cse 6 1/4 (35501309) | SY | 5,008 | $34.55 | $39.00 | $34.55 |
| 42 | Bit matls tack CT (40600290) | LB | 4,508 | $0.01 | $0.01 | $0.01 |
| 43 | HMA BC IL-19.0 N50 (40603080) | TON | 632 | $91.75 | $97.00 | $91.75 |
| 44 | HMA SC IL-9.5 D N50 (40604060) | TON | 421 | $102.00 | $110.00 | $102.00 |
| 45 | Welded wire reinf (42000060) | SY | 247 | $44.57 | $18.00 | $8.00 |
| 46 | PVT con PCC BR app SL (42000080) | SY | 247 | $200.00 | $183.00 | $165.36 |
| 47 | PC conc sidewalk 5 (42400200) | SF | 1,981 | $12.00 | $15.00 | $12.31 |
| 48 | Pavement rem (44000100) | SY | 4,893 | $21.50 | $51.50 | $32.60 |
| 49 | Comb curb gutter rem (44000500) | LF | 2,167 | $10.00 | $10.00 | $11.80 |
| 50 | Sidewalk rem (44000600) | SF | 1,622 | $3.00 | $4.00 | $3.20 |
| 51 | Median removal (44003100) | SF | 3,804 | $8.00 | $2.00 | $8.10 |
| 52 | Aggregate SHLDS B 6 (48101500) | SY | 81 | $39.00 | $41.00 | $102.60 |
| 53 | Rem exist struct (50100100) | EACH | 1 | $627,000 | $1,400,000 | $1,000,000 |
| 54 | Slope wall remov (50104650) | SY | 1,108 | $27.57 | $16.00 | $27.80 |
| 55 | Protective shield (50157300) | SY | 683 | $0.01 | $1.00 | $145.00 |
| 56 | Structure excavation (50200100) | CY | 5,548 | $120.00 | $50.00 | $23.00 |
| 57 | Conc struct (50300225) | CY | 250.50 | $600.00 | $1,000.00 | $625.00 |
| 58 | Conc sup-STR (50300255) | CY | 502.10 | $1,400.00 | $825.00 | $925.00 |
| 59 | BR deck grooving (50300260) | SY | 1,114 | $8.30 | $7.00 | $9.10 |
| 60 | Protective coat (50300300) | SY | 1,748 | $3.58 | $1.75 | $2.90 |
| 61 | Conc supstr app slab (50301350) | CY | 231.50 | $700.00 | $625.00 | $515.00 |
| 62 | F&E PP con beams IL45 (50401320) | LF | 1,491 | $700.00 | $660.00 | $690.00 |
| 63 | Reinf bars, epoxy CTD (50800205) | LB | 203,800 | $1.69 | $1.65 | $1.65 |
| 64 | Fur M S pile 16X0.375 (51200963) | LF | 780 | $179.00 | $100.00 | $220.00 |
| 65 | Driving piles (51202305) | LF | 780 | $0.01 | $1.00 | $1.00 |
| 66 | Test pile met shells (51203200) | EACH | 2 | $20,000 | $2,000.00 | $10,000 |
| 67 | Pile shoes (51204650) | EACH | 13 | $470.00 | $500.00 | $470.00 |
| 68 | Name plates (51500100) | EACH | 1 | $1,000.00 | $800.00 | $1,747.50 |
| 69 | Elast bearing assy T1 (52100010) | EACH | 13 | $2,281.00 | $2,300.00 | $3,528.50 |
| 70 | Anchor bolts 1 (52100520) | EACH | 26 | $200.00 | $200.00 | $183.00 |
| 71 | Mech ST earth ret WL (52200500) | SF | 7,884 | $155.00 | $100.00 | $192.80 |
| 72 | Storm sewer rem 12 (55100500) | LF | 24 | $81.00 | $75.00 | $125.80 |
| 73 | CB recon new T11F&G (60254100) | EACH | 3 | $3,500.00 | $4,100.00 | $9,217.40 |
| 74 | Remov catch bas (60500050) | EACH | 1 | $1,800.00 | $2,100.00 | $2,625.90 |
| 75 | Comb CC&G TY B-6.24 (60605000) | LF | 1,219 | $70.65 | $56.00 | $45.25 |
| 76 | Conc median surf 4 (60618300) | SF | 368 | $18.95 | $8.00 | $12.87 |
| 77 | Conc med TSB6.12 (60619600) | SF | 466 | $10.30 | $25.00 | $18.52 |
| 78 | SPBGR TY A 6FT posts (63000001) | LF | 650 | $44.06 | $30.00 | $29.38 |
| 79 | Traf bar term T2 (63100045) | EACH | 6 | $1,519.00 | $1,550.00 | $1,519.00 |
| 80 | Traf bar term T5 (63100070) | EACH | 1 | $1,289.60 | $1,200.00 | $1,108.00 |
| 81 | Traf bar term T6 (63100085) | EACH | 3 | $4,176.05 | $3,900.00 | $3,861.20 |
| 82 | Guardrail remov (63200310) | LF | 1,067 | $6.90 | $7.00 | $8.00 |
| 83 | Non SPL waste disposl (66900200) | CY | 9,165 | $65.00 | $40.00 | $70.00 |
| 84 | Soil disposal analy (66900530) | EACH | 4 | $850.00 | $1,500.00 | $1,689.20 |
| 85 | Reg sub P-const plan (66901001) | LS | 1 | $5,800.00 | $3,100.00 | $3,611.50 |
| 86 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $1,200.00 | $1,398.00 |
| 87 | Reg sub mon (66901006) | CAL DAY | 30 | $715.00 | $2,200.00 | $792.20 |
| 88 | Engr field office A (67000400) | CAL MO | 15 | $4,566.21 | $3,900.00 | $4,000.00 |
| 89 | Mobilization (67100100) | LS | 1 | $478,849 | $425,000 | $492,620 |
| 90 | Changeable message SN (70107025) | CAL DAY | 150 | $30.00 | $30.00 | $31.40 |
| 91 | SHRT TRM pavt MK rem (70300150) | SF | 178 | $3.00 | $11.00 | $0.70 |
| 92 | Temp PVT MK L4 T4 tape (70307120) | LF | 440 | $2.25 | $2.25 | $1.30 |
| 93 | Temp PVT MK L24 T4 tape (70307210) | LF | 16 | $15.00 | $15.00 | $8.40 |
| 94 | Sign panel T1 (72000100) | SF | 51 | $30.00 | $30.00 | $34.90 |
| 95 | Remov sin pan assy TA (72400100) | EACH | 8 | $100.00 | $10.00 | $58.20 |
| 96 | Teles STL sin support (72800100) | LF | 56 | $20.00 | $20.00 | $25.60 |
| 97 | Base tel STL sin supp (73100100) | EACH | 4 | $250.00 | $250.00 | $407.70 |
| 98 | THPL PVT MK LTR & sym (78000100) | SF | 52 | $5.75 | $5.75 | $9.00 |
| 99 | THPL PVT MK line 4 (78000200) | LF | 2,970 | $1.45 | $1.50 | $1.50 |
| 100 | THPL PVT MK line 6 (78000400) | LF | 165 | $1.72 | $2.00 | $2.25 |
| 101 | THPL PVT MK line 8 (78000500) | LF | 450 | $1.95 | $2.00 | $3.00 |
| 102 | THPL PVT MK line 12 (78000600) | LF | 782 | $3.32 | $3.50 | $4.50 |
| 103 | THPL PVT MK line 24 (78000650) | LF | 73 | $5.75 | $6.00 | $9.00 |
| 104 | Polyurea PM T2 LTR-SY (78008300) | SF | 58 | $14.50 | $14.50 | $42.00 |
| 105 | Polyurea PM T2 LN 4 (78008310) | LF | 762 | $5.80 | $6.00 | $7.00 |
| 106 | Polyurea PM T2 LN 6 (78008330) | LF | 180 | $7.80 | $8.00 | $10.50 |
| 107 | Polyurea PM T2 LN 8 (78008340) | LF | 22 | $10.60 | $11.00 | $14.00 |
| 108 | Polyurea PM T2 LN 12 (78008350) | LF | 74 | $14.95 | $15.00 | $21.00 |
| 109 | Raised refl pavt MKR (78100100) | EACH | 6 | $750.00 | $750.00 | $1,250.00 |
| 110 | Grdrail ref type A (78200005) | EACH | 28 | $11.00 | $11.00 | $12.80 |
| 111 | Raised ref PVT MK rem (78300200) | EACH | 6 | $11.62 | $25.00 | $97.00 |
| 112 | Elect serv install (80400100) | EACH | 1 | $5,513.40 | $5,700.00 | $5,513.40 |
| 113 | Elect util serv conn (80400200) | LS | 1 | $5,000.00 | $5,000.00 | $5,000.00 |
| 114 | Undrgrd C galvs 1 1/2 (81028190) | LF | 500 | $31.60 | $32.00 | $31.60 |
| 115 | Undrgrd C galvs 3 (81028220) | LF | 100 | $91.30 | $92.00 | $91.30 |
| 116 | Undrgrd C PVC 1 (81028320) | LF | 110 | $42.10 | $44.00 | $42.10 |
| 117 | Con at ST 1 PVC GS (81100320) | LF | 280 | $70.80 | $72.00 | $70.80 |
| 118 | Jun BX SS as 12X12X6 (81300550) | EACH | 1 | $1,695.20 | $1,800.00 | $1,695.20 |
| 119 | EC C XLP use 1C 10 (81702110) | LF | 1,320 | $3.90 | $4.00 | $3.90 |
| 120 | EC C XLP use 1C 4 (81702140) | LF | 1,300 | $7.60 | $8.00 | $7.60 |
| 121 | Lum LED rdwy H (82110008) | EACH | 2 | $1,183.10 | $1,200.00 | $1,183.10 |
| 122 | Lum LED UP sus E (82110027) | EACH | 4 | $5,128.40 | $5,200.00 | $5,128.40 |
| 123 | LT cont basem 240V100 (82500350) | EACH | 1 | $24,340 | $25,000 | $24,340 |
| 124 | LT P A 47.5MH 15MA (83050810) | EACH | 2 | $7,589.30 | $7,700.00 | $7,589.30 |
| 125 | Light pole FDN 24D (83600200) | LF | 20 | $476.50 | $500.00 | $476.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.