Rausch Infrastructure, LLC: IDOT bid record
Rausch Infrastructure, LLC submitted 81 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 8 of them (10%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $8,621,905
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 18 | 2 | 11% |
| 2022 | 2 | 0 | 0% |
| 2023 | 12 | 3 | 25% |
| 2024 | 20 | 0 | 0% |
| 2025 | 19 | 2 | 11% |
| 2026 | 10 | 1 | 10% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 80 | 8 | 10% |
| District 03 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bit matls tack CT | 40600290 | LB | 63 | 42 (67%) | $0.01 | $0.01 |
| Trainees TPG | Z0076604 | HR | 39 | 39 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 35 | 35 (100%) | $0.80 | $0.80 |
| Reinf bars, epoxy CTD | 50800205 | LB | 64 | 17 (27%) | $3.00 | $2.50 |
| SHRT TRM pavt MK rem | 70300150 | SF | 43 | 11 (26%) | $0.80 | $1.20 |
| Diamond grind BR sec | Z0029090 | SY | 27 | 10 (37%) | $9.20 | $13.78 |
| THPL PVT MK line 4 | 78000200 | LF | 57 | 8 (14%) | $1.70 | $0.88 |
| Conc rem | 50102400 | CY | 51 | 8 (16%) | $2,200.00 | $2,400.00 |
| Temp info signing | Z0030850 | SF | 49 | 8 (16%) | $19.00 | $18.00 |
| Temp PVT MK L4 T4 tape | 70307120 | LF | 49 | 8 (16%) | $1.40 | $1.25 |
| Raised ref PVT MK rem | 78300200 | EACH | 34 | 8 (24%) | $17.50 | $15.00 |
| RRPM reflector removl | X7830050 | EACH | 32 | 7 (22%) | $11.00 | $10.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lorig Construction Company | 67 | 53 of 67 |
| Areatha Construction Co., Inc. | 58 | 44 of 58 |
| Martam Construction Incorporated | 48 | 43 of 48 |
| Alliance Contractors, Inc. | 28 | 20 of 28 |
| MYS, Incorporated | 25 | 19 of 25 |
| Herlihy Mid-Continent Company | 24 | 20 of 24 |
| D. Construction, Inc. | 19 | 18 of 19 |
| Copenhaver Construction, Inc. | 15 | 13 of 15 |
| Dunnet Bay Construction Company | 14 | 11 of 14 |
| ERA-Valdivia Contractors, Inc. | 10 | 6 of 10 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 80C90 | District 01 | Section (1616-VB-WPGM) | 3 of 3 | $3,331,833 | +36% |
| 12 JUN 2026 | 80C97 | District 01 | Section 2025-2134-I | 1 of 3 | $727,711 | Low, 1.0% under the second |
| 24 APR 2026 | 62X44 | District 01 | Section 2024-1009-BDS | 3 of 4 | $684,173 | +49% |
| 27 FEB 2026 | 61M25 | District 01 | Project Number: H406-985 / /, section 16-11107-01-BR | 7 of 7 | $2,235,707 | +43% |
| 27 FEB 2026 | 62Y17 | District 01 | Section (551X-B)BDR,BJR | 4 of 6 | $1,499,139 | +18% |
| 27 FEB 2026 | 62Y26 | District 01 | Section (143VB-R-1(90))BR | 4 of 7 | $1,349,446 | +13% |
| 16 JAN 2026 | 61L19 | District 01 | Waukegan, section 20-00243-00-BR | 3 of 3 | $8,234,574 | +3.0% |
| 16 JAN 2026 | 62D34 | District 01 | Section 95-B | 4 of 4 | $8,490,592 | +22% |
| 16 JAN 2026 | 62K65 | District 01 | Section 2019-192-B-R | 4 of 7 | $14,953,900 | +12% |
| 16 JAN 2026 | 62U12 | District 01 | Section FAI | 4 of 6 | $12,754,438 | +15% |
| 07 NOV 2025 | 61L82 | District 01 | Broadview, section 22-00086-00-BR | 5 of 5 | $3,357,778 | +30% |
| 07 NOV 2025 | 62R63 | District 01 | 6 of 6 | $19,791,419 | +26% | |
| 19 SEP 2025 | 62Y12 | District 01 | Section (21B-NRM-4)BR | 3 of 5 | $1,092,103 | +14% |
| 19 SEP 2025 | 62Y13 | District 01 | Section (1293-BR)BDR,BJR | 6 of 6 | $1,215,514 | +26% |
| 01 AUG 2025 | 62W21 | District 01 | Section FAI | 5 of 6 | $2,298,533 | +29% |
| 13 JUN 2025 | 62T22 | District 01 | Section FAP | 5 of 6 | $1,992,308 | +14% |
| 13 JUN 2025 | 62X02 | District 01 | Section (K-B-2)BR | 2 of 2 | $6,141,473 | +45% |
| 13 JUN 2025 | 62Y04 | District 01 | Section (1293-BR)BR | 4 of 5 | $949,806 | +37% |
| 25 APR 2025 | 61K26 | District 01 | Project Number: Zu0Q-834 / /, section 17-12082-01-BR | 1 of 3 | $3,894,087 | Low, 7.0% under the second |
| 25 APR 2025 | 62R62 | District 01 | Section FAI | 3 of 3 | $12,244,022 | +1.0% |
| 25 APR 2025 | 62T27 | District 01 | Section FAP | 5 of 5 | $1,897,476 | +51% |
| 25 APR 2025 | 62X27 | District 01 | Section (60B&C-NRM)BR | 3 of 3 | $483,453 | +12% |
| 25 APR 2025 | 62X40 | District 01 | Section (068-2323.3-CF)BR,I | 4 of 4 | $1,345,711 | +13% |
| 07 MAR 2025 | 62T31 | District 01 | Section FAP | 4 of 5 | $1,689,561 | +46% |
| 07 MAR 2025 | 62T48 | District 01 | Section FAU | 4 of 4 | $888,561 | +51% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.