IDOT contract 61K26 bid tabulation
Project Number: Zu0Q-834 / /, section 17-12082-01-BR. Let by Illinois DOT on April 25, 2025, Kane, District 01. 3 bids received; low bid $3,894,087 by Rausch Infrastructure, LLC.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 89
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rausch Infrastructure, LLC | $3,894,087 | Low |
| 2 | Lorig Construction Company | $4,163,339 | +7.0% |
| 3 | Martam Construction Incorporated | $4,393,981 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rausch Infrastructure, LLC | 2. Lorig Construction Company | 3. Martam Construction Incorporated |
|---|---|---|---|---|---|---|
| 1 | Conc truck washout (XX006821) | LS | 1 | $1,837.50 | $500.00 | $4,081.10 |
| 2 | HMA driveway pavt 3 (X4060280) | SY | 350 | $75.90 | $30.00 | $38.50 |
| 3 | PCC driveway PVT 6 SP (X4230710) | SY | 43 | $383.60 | $130.00 | $259.98 |
| 4 | Name plates SPL (X5150110) | EACH | 1 | $612.50 | $1,000.00 | $1,111.55 |
| 5 | Traf cont & prot SPL (X7010216) | LS | 1 | $30,564 | $140,000 | $254,258 |
| 6 | STR rep con DP = < 5 (Z0012754) | SF | 40 | $367.50 | $500.00 | $330.00 |
| 7 | Construction layout (Z0013798) | LS | 1 | $13,230 | $75,000 | $32,000 |
| 8 | RR prot liability ins (Z0048665) | LS | 1 | $6,125.00 | $10,000 | $27,500 |
| 9 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 10 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 11 | Earth excavation (20200100) | CY | 307 | $33.50 | $50.00 | $40.79 |
| 12 | Rem & disp uns matl (20201200) | CY | 41 | $62.70 | $80.00 | $107.09 |
| 13 | Furnished excavation (20400800) | CY | 3,122 | $47.40 | $51.00 | $24.31 |
| 14 | Trench backfill (20800150) | CY | 4.10 | $123.80 | $85.00 | $102.71 |
| 15 | Geotech fab F/GR stab (21001000) | SY | 44.40 | $16.90 | $7.00 | $27.18 |
| 16 | Topsoil F & P 4 (21101615) | SY | 3,294 | $6.70 | $5.50 | $6.05 |
| 17 | Seeding CL 2A (25000210) | ACRE | 0.70 | $6,125.00 | $5,000.00 | $5,500.00 |
| 18 | Nitrogen fert nutr (25000400) | LB | 64 | $3.60 | $3.00 | $3.30 |
| 19 | Phosphorus fert nutr (25000500) | LB | 64 | $3.60 | $3.00 | $3.30 |
| 20 | Potassium fert nutr (25000600) | LB | 64 | $3.60 | $3.00 | $3.30 |
| 21 | Erosion contr blanket (25100630) | SY | 3,294 | $1.20 | $1.00 | $1.10 |
| 22 | Perimeter eros bar (28000400) | LF | 1,918 | $3.60 | $3.00 | $3.30 |
| 23 | Inlet & pipe protect (28000500) | EACH | 2 | $306.20 | $250.00 | $275.00 |
| 24 | Stone riprap CL A3 (28100105) | SY | 62.80 | $28.60 | $45.00 | $71.70 |
| 25 | Agg subgrade impr 12 (30300112) | SY | 3,379 | $19.00 | $25.00 | $16.54 |
| 26 | Agg surf cse B (40200900) | CY | 7.70 | $56.60 | $115.00 | $92.90 |
| 27 | Aggregate-temp access (40201000) | TON | 29.50 | $31.10 | $65.00 | $37.22 |
| 28 | Bit matls PR CT (40600275) | LB | 649.90 | $0.01 | $0.01 | $0.01 |
| 29 | Bit matls tack CT (40600290) | LB | 3,788.20 | $0.01 | $0.01 | $0.01 |
| 30 | Long joint sealant (40600370) | LF | 3,235 | $6.10 | $5.00 | $7.15 |
| 31 | HMA BC IL-19.0 N50 (40603080) | TON | 526 | $124.90 | $103.00 | $101.20 |
| 32 | HMA SC IL-9.5 D N50 (40604060) | TON | 1,024 | $108.90 | $91.00 | $99.00 |
| 33 | PVT con HMA BR app SL (42000070) | SY | 85 | $240.10 | $200.00 | $55.00 |
| 34 | PCC driveway pavt 7 (42300300) | SY | 148 | $151.00 | $115.00 | $115.88 |
| 35 | Pavement rem (44000100) | SY | 2,773 | $19.60 | $22.00 | $12.41 |
| 36 | HMA surf rem 1 1/2 (44000155) | SY | 5,966 | $3.50 | $3.00 | $2.04 |
| 37 | HMA surf rem 2 (44000157) | SY | 1,581 | $6.40 | $5.50 | $2.59 |
| 38 | Drive pavement rem (44000200) | SY | 445.20 | $18.30 | $23.00 | $14.69 |
| 39 | Agg wedge SHLD type B (48102100) | TON | 257 | $92.70 | $63.00 | $66.00 |
| 40 | HMA shoulders 6 (48203021) | SY | 1,208 | $55.50 | $51.00 | $41.80 |
| 41 | Rem exist struct (50100100) | EACH | 1 | $335,431 | $670,000 | $403,853 |
| 42 | Conc rem (50102400) | CY | 41.50 | $2,303.80 | $1,600.00 | $1,983.99 |
| 43 | Slope wall remov (50104650) | SY | 207 | $160.60 | $28.00 | $125.00 |
| 44 | Pipe culvert remov (50105220) | LF | 118 | $36.70 | $26.00 | $26.92 |
| 45 | Structure excavation (50200100) | CY | 20 | $157.10 | $115.00 | $102.03 |
| 46 | Conc struct (50300225) | CY | 185.80 | $1,553.70 | $2,000.00 | $2,101.12 |
| 47 | Conc sup-STR (50300255) | CY | 274.60 | $1,443.40 | $1,250.00 | $1,931.29 |
| 48 | BR deck grooving (50300260) | SY | 1,088 | $8.50 | $7.00 | $6.83 |
| 49 | Concrete encasement (50300280) | CY | 33.40 | $1,959.70 | $1,800.00 | $2,154.27 |
| 50 | Protective coat (50300300) | SY | 1,326 | $9.80 | $1.25 | $2.78 |
| 51 | Conc supstr app slab (50301350) | CY | 113.60 | $603.30 | $650.00 | $787.23 |
| 52 | F & E struct steel (50500105) | LS | 1 | $655,137 | $675,000 | $805,150 |
| 53 | Stud shear connectors (50500505) | EACH | 8,328 | $4.30 | $4.00 | $4.90 |
| 54 | Reinf bars, epoxy CTD (50800205) | LB | 164,180 | $2.10 | $1.80 | $1.81 |
| 55 | Slope wall 4 (51100100) | SY | 153 | $191.50 | $400.00 | $295.00 |
| 56 | Fur STL pile HP14X89 (51201900) | LF | 995 | $260.00 | $87.00 | $169.00 |
| 57 | Driving piles (51202305) | LF | 995 | $1.00 | $1.00 | $1.00 |
| 58 | Test pile ST HP14X89 (51203900) | EACH | 4 | $8,000.00 | $8,000.00 | $19,396 |
| 59 | Elast bearing assy T1 (52100010) | EACH | 12 | $2,082.50 | $1,900.00 | $2,293.59 |
| 60 | Anchor bolts 3/4 (52100510) | EACH | 24 | $26.90 | $175.00 | $157.63 |
| 61 | Anchor bolts 1 (52100520) | EACH | 48 | $37.90 | $190.00 | $164.44 |
| 62 | PRC flar end sec 24 (54213669) | EACH | 2 | $1,772.40 | $2,700.00 | $2,484.12 |
| 63 | Storm sew CL A 1 24 (550A0120) | LF | 104 | $231.90 | $130.00 | $165.59 |
| 64 | Granular backfill STR (58600101) | CY | 218 | $43.10 | $89.00 | $68.65 |
| 65 | Geocomposite wall DR (59100100) | SY | 109 | $11.00 | $25.00 | $34.40 |
| 66 | Pipe underdr T 2 4 (60108204) | LF | 100 | $4.20 | $47.00 | $51.95 |
| 67 | P undr for struct 4 (60146304) | LF | 203 | $4.20 | $41.00 | $47.57 |
| 68 | SPBGR TY A 6FT posts (63000001) | LF | 818.75 | $35.00 | $41.00 | $31.47 |
| 69 | Traf bar term T6 (63100085) | EACH | 4 | $5,120.50 | $4,200.00 | $4,598.00 |
| 70 | TR bar TRM T1 SPL tan (63100167) | EACH | 3 | $4,147.80 | $3,600.00 | $3,724.60 |
| 71 | Guardrail remov (63200310) | LF | 1,224 | $7.80 | $10.00 | $7.05 |
| 72 | Non SPL waste disposl (66900200) | CY | 20 | $84.00 | $120.00 | $128.00 |
| 73 | Soil disposal analy (66900530) | EACH | 1 | $3,062.50 | $1,600.00 | $1,870.00 |
| 74 | Reg sub P-const plan (66901001) | LS | 1 | $3,062.50 | $4,000.00 | $3,740.00 |
| 75 | Reg sub F con report (66901003) | LS | 1 | $1,837.50 | $1,000.00 | $550.00 |
| 76 | Reg sub mon (66901006) | CAL DAY | 2 | $490.00 | $1,700.00 | $770.00 |
| 77 | Mobilization (67100100) | LS | 1 | $225,000 | $220,000 | $263,639 |
| 78 | Changeable message SN (70107025) | CAL DAY | 125 | $49.00 | $35.00 | $38.50 |
| 79 | Sign panel T1 (72000100) | SF | 40.50 | $36.70 | $28.00 | $30.80 |
| 80 | Sign panel T2 (72000200) | SF | 14.25 | $42.80 | $35.00 | $38.50 |
| 81 | Remov sin pan assy TA (72400100) | EACH | 6 | $122.50 | $250.00 | $275.00 |
| 82 | Terminal marker - DA (72501000) | EACH | 3 | $42.80 | $20.00 | $38.50 |
| 83 | Teles STL sin support (72800100) | LF | 100 | $22.00 | $22.00 | $24.20 |
| 84 | Mod ureth PM LTR-sym (78009000) | SF | 135.90 | $6.40 | $6.00 | $6.60 |
| 85 | Mod ureth PM line 4 (78009004) | LF | 10,605 | $1.50 | $1.05 | $1.16 |
| 86 | Mod ureth PM line 6 (78009006) | LF | 1,094 | $2.40 | $1.50 | $1.65 |
| 87 | Mod ureth PM line 12 (78009012) | LF | 176 | $4.80 | $3.00 | $3.30 |
| 88 | Mod ureth PM line 24 (78009024) | LF | 54 | $9.70 | $6.00 | $6.60 |
| 89 | Grdrail ref type A (78200005) | EACH | 45 | $12.20 | $20.00 | $11.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.