IDOT contract 62R62 bid tabulation
Section FAI. Let by Illinois DOT on April 25, 2025, Cook, District 01. 3 bids received; low bid $12,098,192 by Areatha Construction Co., Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 187
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Areatha Construction Co., Inc. | $12,098,192 | Low |
| 2 | Lorig Construction Company | $12,213,381 | +1.0% |
| 3 | Rausch Infrastructure, LLC | $12,244,022 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Areatha Construction Co., Inc. | 2. Lorig Construction Company | 3. Rausch Infrastructure, LLC |
|---|---|---|---|---|---|---|
| 1 | Rem HM lumnrs salvage (X1400190) | EACH | 113 | $124.80 | $270.00 | $312.00 |
| 2 | Rem luminaire salvage (X1400341) | EACH | 8 | $249.65 | $270.00 | $312.00 |
| 3 | Selective clearing (X2010514) | ACRE | 1 | $8,000.00 | $12,000 | $10,000 |
| 4 | Temp access- FLD ent (X4024000) | EACH | 1 | $6,929.10 | $2,800.00 | $17,800 |
| 5 | CL D patch T1 10 SPL (X4421761) | SY | 240 | $155.00 | $220.00 | $125.00 |
| 6 | CL D patch T2 10 SPL (X4421763) | SY | 240 | $155.00 | $170.00 | $122.00 |
| 7 | Bar terminators (X5080530) | EACH | 1,304 | $35.05 | $30.00 | $32.00 |
| 8 | SS cleaned 12 (X5537800) | LF | 279 | $2.00 | $2.00 | $2.30 |
| 9 | SS cleaned 15 (X5537900) | LF | 428 | $2.00 | $2.00 | $2.30 |
| 10 | SS cleaned 18 (X5538000) | LF | 408 | $2.00 | $2.00 | $2.30 |
| 11 | Comb CC&G TB6.24 SPL (X6060052) | LF | 661 | $55.85 | $92.00 | $58.00 |
| 12 | Fill EX rumble strip (X6420002) | LF | 1,417 | $19.50 | $30.00 | $38.00 |
| 13 | CH LK fence remov (X6640300) | LF | 894 | $6.00 | $6.00 | $7.00 |
| 14 | CH LK gates rem & RE (X6640312) | EACH | 1 | $1,800.00 | $1,800.00 | $2,100.00 |
| 15 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 30 | $4,800.00 | $3,000.00 | $5,530.00 |
| 16 | Traf cont & prot SPL (X7010216) | LS | 1 | $25,000 | $160,000 | $29,250 |
| 17 | Speed display trailer (X7010410) | CAL MO | 20 | $350.00 | $350.00 | $410.00 |
| 18 | TR C-prot expressways (X7011015) | LS | 1 | $260,000 | $300,000 | $170,000 |
| 19 | TR cont surveil expwy (X7013820) | CAL DAY | 300 | $200.00 | $200.00 | $234.00 |
| 20 | Temp info signing (X7200061) | SF | 171 | $50.00 | $50.00 | $59.00 |
| 21 | Detour signing (X7200203) | LS | 1 | $25,000 | $25,000 | $30,000 |
| 22 | Maint lighting systm (X8000003) | CAL MO | 12 | $2,995.60 | $2,700.00 | $3,065.00 |
| 23 | Lum LED rdwy rod H (X8210007) | EACH | 8 | $1,159.25 | $800.00 | $935.00 |
| 24 | High mast lum CTRWT (X8210410) | EACH | 67 | $394.80 | $350.00 | $406.00 |
| 25 | Approach slab rem (Z0004552) | SY | 683 | $45.05 | $53.00 | $44.00 |
| 26 | Clean EX man/hand (Z0010614) | EACH | 12 | $300.00 | $1,600.00 | $1,175.00 |
| 27 | Clean EX inlets (Z0010615) | EACH | 19 | $318.00 | $325.00 | $375.00 |
| 28 | Drainage scuppr DS-11 (Z0018002) | EACH | 4 | $1,688.90 | $2,100.00 | $2,125.00 |
| 29 | Diamond grind BR sec (Z0029090) | SY | 1,480 | $9.65 | $8.00 | $9.00 |
| 30 | Lum sfty CBL assembly (Z0033020) | EACH | 8 | $178.80 | $200.00 | $230.00 |
| 31 | Temp TR signal timing (Z0073510) | EACH | 8 | $735.00 | $1,150.00 | $1,335.00 |
| 32 | Trainees (Z0076600) | HR | 2,500 | $0.80 | $0.80 | $0.80 |
| 33 | Trainees TPG (Z0076604) | HR | 2,500 | $15.00 | $15.00 | $15.00 |
| 34 | Tree remov 6-15 (20100110) | UNIT | 92 | $28.00 | $30.00 | $32.00 |
| 35 | Tree remov over 15 (20100210) | UNIT | 40 | $34.00 | $40.00 | $400.00 |
| 36 | Tree remov acres (20100500) | ACRE | 1 | $8,000.00 | $15,000 | $9,360.00 |
| 37 | Tree trunk protection (20101100) | EACH | 10 | $100.00 | $100.00 | $275.00 |
| 38 | Tree root pruning (20101200) | EACH | 7 | $100.00 | $75.00 | $175.00 |
| 39 | Tree prun 1-10 (20101300) | EACH | 3 | $50.00 | $75.00 | $58.00 |
| 40 | Tree prun over 10 (20101350) | EACH | 4 | $75.00 | $60.00 | $175.00 |
| 41 | Earth excavation (20200100) | CY | 1,005 | $29.30 | $50.00 | $70.00 |
| 42 | Rem & disp uns matl (20201200) | CY | 206 | $51.25 | $80.00 | $97.00 |
| 43 | Trench backfill (20800150) | CY | 33 | $65.00 | $85.00 | $140.00 |
| 44 | Geotech fab F/GR stab (21001000) | SY | 725 | $6.80 | $4.00 | $3.50 |
| 45 | Topsoil F & P 4 (21101615) | SY | 4,098 | $7.95 | $6.00 | $9.25 |
| 46 | Seeding CL 2A (25000210) | ACRE | 0.50 | $1,336.85 | $3,100.00 | $1,563.00 |
| 47 | Seeding CL 4A (25000312) | ACRE | 0.25 | $2,027.85 | $2,500.00 | $2,375.00 |
| 48 | Nitrogen fert nutr (25000400) | LB | 90 | $3.20 | $3.00 | $3.75 |
| 49 | Potassium fert nutr (25000600) | LB | 90 | $3.20 | $3.00 | $3.75 |
| 50 | Mulch method 2 (25100115) | ACRE | 0.50 | $5,459.60 | $1,700.00 | $6,388.00 |
| 51 | Erosion contr blanket (25100630) | SY | 2,206 | $1.35 | $1.40 | $1.55 |
| 52 | Sodding salt tolerant (25200110) | SY | 1,514 | $12.95 | $16.00 | $15.00 |
| 53 | Supple watering (25200200) | UNIT | 1,921 | $1.00 | $0.01 | $1.20 |
| 54 | Temp eros contr seed (28000250) | LB | 35 | $17.80 | $5.00 | $21.00 |
| 55 | Temp ditch checks (28000305) | LF | 21 | $14.05 | $4.00 | $16.00 |
| 56 | Perimeter eros bar (28000400) | LF | 1,823 | $3.20 | $2.00 | $4.00 |
| 57 | Inlet filters (28000510) | EACH | 22 | $276.90 | $200.00 | $324.00 |
| 58 | Temp HD eros contr BL (28001200) | SY | 518 | $1.75 | $1.30 | $2.00 |
| 59 | Agg subgrade improve (30300001) | CY | 219 | $83.55 | $105.00 | $142.00 |
| 60 | Agg subgrade impr 12 (30300112) | SY | 2,661 | $58.35 | $30.00 | $47.00 |
| 61 | Agg base cse B 2 (35101582) | SY | 588 | $15.90 | $13.00 | $19.00 |
| 62 | Agg base cse B 4 (35101600) | SY | 1,617 | $20.00 | $16.00 | $25.00 |
| 63 | HMA base cse 12 3/4 (35501335) | SY | 362 | $180.00 | $133.00 | $237.00 |
| 64 | Bit matls PR CT (40600275) | LB | 80 | $0.10 | $16.00 | $0.10 |
| 65 | Bit matls tack CT (40600290) | LB | 80 | $0.10 | $16.00 | $0.10 |
| 66 | HMA SC IL-9.5 D N70 (40604062) | TON | 43 | $525.00 | $625.00 | $520.00 |
| 67 | PVT con PCC BR app SL (42000080) | SY | 352 | $151.90 | $215.00 | $206.00 |
| 68 | PCC PVT 10 jointed (42000501) | SY | 1,623 | $109.50 | $145.00 | $132.00 |
| 69 | Protective coat (42001300) | SY | 6,171 | $1.25 | $1.50 | $2.00 |
| 70 | PCC driveway pavt 5 (42300100) | SY | 18 | $321.70 | $130.00 | $222.00 |
| 71 | PC conc sidewalk 5 (42400200) | SF | 12,462 | $8.40 | $10.00 | $10.00 |
| 72 | Detectable warnings (42400800) | SF | 60 | $54.05 | $90.00 | $68.00 |
| 73 | Pavement rem (44000100) | SY | 2,150 | $33.00 | $20.00 | $34.00 |
| 74 | Drive pavement rem (44000200) | SY | 18 | $33.90 | $47.00 | $105.00 |
| 75 | Comb curb gutter rem (44000500) | LF | 636 | $7.65 | $14.00 | $33.00 |
| 76 | Sidewalk rem (44000600) | SF | 1,478 | $1.80 | $2.75 | $4.50 |
| 77 | Paved SHLD removal (44004250) | SY | 261 | $56.95 | $25.00 | $27.00 |
| 78 | Welded wire reinf (44200050) | SY | 352 | $9.15 | $28.00 | $30.00 |
| 79 | Dowel bars 1 1/4 (44201298) | EACH | 98 | $12.05 | $28.00 | $25.00 |
| 80 | Aggregate SHLDS B 6 (48101500) | SY | 816 | $29.00 | $21.00 | $40.00 |
| 81 | PCC shoulders 10 (48300500) | SY | 18 | $561.80 | $160.00 | $440.00 |
| 82 | Rem exist struct (50100200) | LS | 1 | $812,600 | $1,350,000 | $1,105,000 |
| 83 | Protective shield (50157300) | SY | 1,074 | $97.65 | $0.10 | $68.00 |
| 84 | Structure excavation (50200100) | CY | 483 | $214.40 | $80.00 | $100.00 |
| 85 | Rem/disp uns matl-STR (50200450) | CY | 314 | $73.65 | $145.00 | $79.00 |
| 86 | Conc struct (50300225) | CY | 392 | $1,285.85 | $1,150.00 | $1,390.00 |
| 87 | Conc sup-STR (50300255) | CY | 602 | $1,523.45 | $1,050.00 | $1,250.00 |
| 88 | BR deck grooving (50300260) | SY | 1,480 | $5.00 | $5.25 | $6.00 |
| 89 | Form liner tex surf (50300285) | SF | 960 | $24.55 | $14.00 | $20.00 |
| 90 | Conc supstr app slab (50301350) | CY | 203 | $403.10 | $625.00 | $540.00 |
| 91 | F & E struct steel (50500105) | LS | 1 | $2,981,911 | $2,950,000 | $2,555,000 |
| 92 | Stud shear connectors (50500505) | EACH | 5,694 | $3.50 | $5.25 | $5.00 |
| 93 | Reinforcement bars (50800105) | LB | 62,690 | $3.05 | $1.80 | $2.00 |
| 94 | Reinf bars, epoxy CTD (50800205) | LB | 318,430 | $1.45 | $1.80 | $1.80 |
| 95 | Bicycle railing (50901720) | LF | 210 | $213.50 | $200.00 | $234.00 |
| 96 | Bicycle railing, curved (50901735) | LF | 218 | $314.90 | $310.00 | $362.00 |
| 97 | Bridge fence railing, curved (50901739) | LF | 244 | $264.20 | $260.00 | $304.00 |
| 98 | Parapet railing (50901750) | LF | 274 | $99.80 | $95.00 | $111.00 |
| 99 | Fur M S pile 16X0.312 (51200961) | LF | 990 | $218.30 | $135.00 | $125.00 |
| 100 | Driving piles (51202305) | LF | 990 | $1.00 | $0.55 | $1.00 |
| 101 | Test pile met shells (51203200) | EACH | 2 | $26,467 | $7,500.00 | $15,000 |
| 102 | Pile shoes (51204650) | EACH | 20 | $422.50 | $450.00 | $500.00 |
| 103 | Name plates (51500100) | EACH | 2 | $887.50 | $650.00 | $820.00 |
| 104 | Drilled shaft in soil (51603000) | CY | 207 | $593.45 | $1,300.00 | $350.00 |
| 105 | Drilled shaft in rock (51604000) | CY | 8 | $20,181 | $6,600.00 | $23,400 |
| 106 | Elast bearing assy T1 (52100010) | EACH | 10 | $4,909.60 | $4,500.00 | $6,700.00 |
| 107 | Anchor bolts 1 (52100520) | EACH | 40 | $187.90 | $215.00 | $568.00 |
| 108 | Anchor bolts 1 1/4 (52100530) | EACH | 20 | $290.80 | $240.00 | $62.00 |
| 109 | Temp soil reten systm (52200020) | SF | 342 | $100.75 | $1.00 | $186.00 |
| 110 | Fur soldier piles WS (52200105) | LF | 480 | $277.70 | $105.00 | $203.00 |
| 111 | Drill set SLD PI soil (52200200) | CF | 2,592 | $20.30 | $65.00 | $41.00 |
| 112 | Untreated timber lag (52200250) | SF | 960 | $13.20 | $24.00 | $37.00 |
| 113 | Mech ST earth ret WL (52200500) | SF | 4,092 | $168.10 | $162.00 | $165.00 |
| 114 | Storm sew CL A 2 12 (550A0340) | LF | 44 | $125.00 | $90.00 | $193.00 |
| 115 | Water valves adjust (56109210) | EACH | 1 | $700.00 | $4,600.00 | $713.00 |
| 116 | Granular backfill STR (58600101) | CY | 126 | $75.55 | $110.00 | $193.00 |
| 117 | Concrete sealer (58700300) | SF | 33,767 | $0.10 | $2.83 | $3.30 |
| 118 | Geocomposite wall DR (59100100) | SY | 107 | $37.35 | $41.00 | $46.00 |
| 119 | P undr for struct 4 (60146304) | LF | 220 | $40.00 | $35.00 | $26.00 |
| 120 | CB TA 4 dia T1F OL (60200105) | EACH | 2 | $3,500.00 | $6,600.00 | $12,000 |
| 121 | Man adjust (60255500) | EACH | 5 | $750.00 | $1,800.00 | $1,345.00 |
| 122 | Inlets adjust (60260100) | EACH | 2 | $750.00 | $900.00 | $1,228.00 |
| 123 | Remov inlets (60500060) | EACH | 1 | $550.00 | $900.00 | $2,660.00 |
| 124 | Conc curb TB (60600605) | LF | 45 | $87.00 | $91.00 | $55.00 |
| 125 | Corrugated med dow (60624610) | SF | 712 | $24.30 | $23.00 | $21.00 |
| 126 | SPBGR TY A 6FT posts (63000001) | LF | 638 | $30.00 | $30.00 | $35.00 |
| 127 | Traf bar term T2 (63100045) | EACH | 5 | $1,800.00 | $1,800.00 | $2,100.00 |
| 128 | Traf bar term T5 (63100070) | EACH | 2 | $1,800.00 | $1,800.00 | $2,100.00 |
| 129 | Traf bar term T6 (63100085) | EACH | 2 | $4,800.00 | $4,800.00 | $5,600.00 |
| 130 | Traf bar term T6B (63100089) | EACH | 4 | $6,500.00 | $6,500.00 | $7,600.00 |
| 131 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $4,200.00 | $4,200.00 | $4,915.00 |
| 132 | Guardrail remov (63200310) | LF | 572 | $6.00 | $6.00 | $7.00 |
| 133 | Shoulder rum strip 8 (64200108) | LF | 1,417 | $1.55 | $3.00 | $2.00 |
| 134 | CH LK fence 6 (66400305) | LF | 633 | $55.00 | $55.00 | $65.00 |
| 135 | Non SPL waste disposl (66900200) | CY | 4,670 | $110.45 | $90.00 | $85.00 |
| 136 | Soil disposal analy (66900530) | EACH | 2 | $1,000.00 | $1,800.00 | $2,035.00 |
| 137 | Reg sub P-const plan (66901001) | LS | 1 | $3,900.00 | $2,700.00 | $3,160.00 |
| 138 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $3,000.00 | $3,510.00 |
| 139 | Reg sub mon (66901006) | CAL DAY | 40 | $700.00 | $1,400.00 | $1,158.00 |
| 140 | Mobilization (67100100) | LS | 1 | $730,000 | $650,000 | $734,000 |
| 141 | Changeable message SN (70107025) | CAL DAY | 1,200 | $25.00 | $25.00 | $29.00 |
| 142 | Temp PVT MK line 4 - paint (70300221) | LF | 16,496 | $0.30 | $0.30 | $0.35 |
| 143 | Temp PVT MK line 5 - paint (70300231) | LF | 5,871 | $0.40 | $0.50 | $0.50 |
| 144 | Temp PVT MK line 6 - paint (70300241) | LF | 719 | $1.00 | $1.00 | $1.20 |
| 145 | Temp PVT MK line 8 - paint (70300251) | LF | 1,781 | $1.50 | $1.50 | $1.75 |
| 146 | Temp PVT MK L8 T4 tape (70307140) | LF | 2,371 | $2.00 | $2.00 | $2.40 |
| 147 | Temp conc barrier (70400100) | LF | 1,100 | $29.65 | $33.00 | $55.00 |
| 148 | Pin temp conc barrier (70400125) | EACH | 975 | $12.85 | $21.00 | $17.50 |
| 149 | Rel temp conc barrier (70400200) | LF | 888 | $32.25 | $4.00 | $28.25 |
| 150 | Imp attn temp FRN TL3 (70600260) | EACH | 2 | $11,000 | $1,100.00 | $12,870 |
| 151 | Imp attn rel FRN TL3 (70600332) | EACH | 2 | $3,200.00 | $3,200.00 | $3,744.00 |
| 152 | Sign panel T1 (72000100) | SF | 12 | $41.65 | $42.00 | $48.75 |
| 153 | Sign panel T3 (72000300) | SF | 54 | $64.80 | $65.00 | $75.00 |
| 154 | Remov sign panel T3 (72400330) | SF | 54 | $33.35 | $34.00 | $39.00 |
| 155 | Reloc sin pan assy TA (72400500) | EACH | 4 | $360.00 | $360.00 | $420.00 |
| 156 | Reloc sign panel T1 (72400710) | SF | 32 | $37.50 | $38.00 | $73.00 |
| 157 | Terminal marker - DA (72501000) | EACH | 4 | $50.00 | $50.00 | $58.00 |
| 158 | Metal post TY A (72900100) | LF | 21 | $23.00 | $23.00 | $27.00 |
| 159 | THPL PVT MK line 4 (78000200) | LF | 6,576 | $1.00 | $1.00 | $1.10 |
| 160 | THPL PVT MK line 8 (78000500) | LF | 1,595 | $2.50 | $2.50 | $3.00 |
| 161 | THPL PVT MK line 12 (78000600) | LF | 427 | $5.00 | $5.00 | $6.00 |
| 162 | Pref PL PM TB inl L4 (78004210) | LF | 2,928 | $5.00 | $5.00 | $6.00 |
| 163 | Pref PL PM TB inl L8 (78004240) | LF | 318 | $10.25 | $10.25 | $12.00 |
| 164 | Pref PL PM TD STD L 7 (78004635) | LF | 396 | $14.00 | $14.00 | $16.00 |
| 165 | Mod ureth PM line 4 (78009004) | LF | 2,443 | $1.50 | $1.50 | $2.00 |
| 166 | Mod ureth PM line 8 (78009008) | LF | 227 | $3.25 | $3.25 | $4.00 |
| 167 | Mod ureth PM line 12 (78009012) | LF | 85 | $6.50 | $6.50 | $8.00 |
| 168 | Mod ureth PM line 24 (78009024) | LF | 87 | $13.00 | $13.00 | $15.00 |
| 169 | GRV RCSD PVT MRKG 8 (78011040) | LF | 227 | $6.00 | $6.00 | $7.00 |
| 170 | Raised refl pavt MKR (78100100) | EACH | 364 | $38.00 | $38.00 | $45.00 |
| 171 | Grdrail ref type A (78200005) | EACH | 28 | $15.00 | $15.00 | $58.00 |
| 172 | Raised ref PVT MK rem (78300200) | EACH | 364 | $15.00 | $10.00 | $16.00 |
| 173 | PVT MKG rem WTR blast (78300202) | SF | 7,565 | $2.00 | $2.00 | $2.50 |
| 174 | Con at ST 1 PVC GS (81100320) | LF | 950 | $58.10 | $63.00 | $74.00 |
| 175 | Con at ST 3 PVC galvs (81100805) | LF | 60 | $121.10 | $210.00 | $240.00 |
| 176 | Jun BX SS as 6X6X4 (81300220) | EACH | 24 | $1,098.10 | $1,130.00 | $1,315.00 |
| 177 | Jun BX SS as 12X10X6 (81300530) | EACH | 4 | $1,640.55 | $2,125.00 | $2,475.00 |
| 178 | Jun BX SS as 18X18X8 (81300830) | EACH | 4 | $2,964.20 | $2,700.00 | $3,140.00 |
| 179 | UD 3#2#4GXLPUSE 1.5 P (81603081) | LF | 400 | $41.55 | $39.25 | $45.00 |
| 180 | EC C XLP use 1C 10 (81702110) | LF | 4,600 | $5.55 | $3.35 | $4.00 |
| 181 | Lum LED HGHMST J (82110017) | EACH | 113 | $2,189.00 | $1,650.00 | $1,920.00 |
| 182 | Lum LED UP sus D (82110026) | EACH | 24 | $5,122.30 | $7,450.00 | $8,690.00 |
| 183 | LP F M 15BC 10" X 8' (83600365) | EACH | 3 | $2,747.10 | $2,550.00 | $2,963.00 |
| 184 | Bkwy dev TR B 15BC (83800205) | EACH | 2 | $1,033.25 | $1,100.00 | $1,200.00 |
| 185 | Rem LT U no salv (84200600) | EACH | 28 | $249.65 | $340.00 | $390.00 |
| 186 | Rem pole FDN (84200804) | EACH | 3 | $1,497.80 | $1,100.00 | $1,250.00 |
| 187 | Reloc EX LT unit (84400105) | EACH | 3 | $1,997.10 | $1,100.00 | $1,250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.