IDOT contract 62Y04 bid tabulation
Section (1293-BR)BR. Let by Illinois DOT on June 13, 2025, Cook, District 01. 5 bids received; low bid $694,687 by Areatha Construction Co., Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 46
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Areatha Construction Co., Inc. | $694,687 | Low |
| 2 | Lorig Construction Company | $777,044 | +12% |
| 3 | MYS, Incorporated | $927,433 | +34% |
| 4 | Rausch Infrastructure, LLC | $949,806 | +37% |
| 5 | Granite Construction Company | $950,158 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Areatha Construction Co., Inc. | 2. Lorig Construction Company | 3. MYS, Incorporated | 4. Rausch Infrastructure, LLC | 5. Granite Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Valve box adj SPL (X6026624) | EACH | 1 | $1,000.00 | $5,000.00 | $322.72 | $1,250.00 | $1,000.00 |
| 2 | FR & lids adjust SPL (X6030310) | EACH | 1 | $1,400.00 | $2,700.00 | $520.31 | $1,750.00 | $1,400.00 |
| 3 | CH LK fence rem & RE (X6640304) | LF | 105 | $75.00 | $77.00 | $82.92 | $93.00 | $74.96 |
| 4 | Traf cont & prot SPL (X7010216) | LS | 1 | $17,000 | $145,000 | $19,912 | $17,000 | $12,999 |
| 5 | TR C-prot expressways (X7011015) | LS | 1 | $1.00 | $1.00 | $2,735.14 | $6,000.00 | $0.01 |
| 6 | Temp info signing (X7200061) | SF | 26 | $35.00 | $50.00 | $49.78 | $20.00 | $15.00 |
| 7 | Rem & RE EX railing (Z0007122) | LF | 287 | $50.15 | $52.00 | $55.43 | $62.00 | $50.11 |
| 8 | Trench backfill (20800150) | CY | 1 | $700.00 | $250.00 | $489.78 | $875.00 | $700.00 |
| 9 | Topsoil F & P 4 (21101615) | SY | 20 | $75.00 | $55.00 | $100.00 | $93.00 | $10.00 |
| 10 | Seeding CL 1A (25000110) | ACRE | 0.00 | $225,000 | $300,000 | $100,000 | $225,000 | $300,000 |
| 11 | Erosion contr blanket (25100630) | SY | 20 | $50.00 | $12.00 | $50.00 | $62.00 | $25.00 |
| 12 | Perimeter eros bar (28000400) | LF | 50 | $25.00 | $21.00 | $20.00 | $31.00 | $25.00 |
| 13 | Inlet filters (28000510) | EACH | 1 | $360.00 | $300.00 | $205.00 | $450.00 | $500.00 |
| 14 | Sub gran mat B (31101000) | TON | 35 | $74.25 | $145.00 | $76.20 | $139.00 | $125.00 |
| 15 | PCC bse cse 10 (35300500) | SY | 78 | $266.70 | $165.00 | $106.95 | $187.00 | $98.00 |
| 16 | Bit matls tack CT (40600290) | LB | 35 | $0.10 | $10.00 | $11.06 | $0.13 | $0.10 |
| 17 | HMA SC IL-9.5 D N70 (40604062) | TON | 7 | $2,850.00 | $1,000.00 | $995.84 | $3,500.00 | $2,850.00 |
| 18 | PC conc sidewalk 5 (42400200) | SF | 2,251 | $14.05 | $14.00 | $12.50 | $25.00 | $12.50 |
| 19 | Pavement rem (44000100) | SY | 144 | $58.80 | $45.00 | $65.05 | $92.00 | $50.00 |
| 20 | Comb curb gutter rem (44000500) | LF | 349 | $15.55 | $17.00 | $10.43 | $37.00 | $20.00 |
| 21 | Sidewalk rem (44000600) | SF | 1,818 | $3.30 | $2.00 | $2.30 | $10.00 | $10.00 |
| 22 | Saw cuts (44213200) | LF | 349 | $4.00 | $8.00 | $5.00 | $3.00 | $2.50 |
| 23 | Conc struct (50300225) | CY | 31.60 | $3,243.70 | $1,800.00 | $1,822.59 | $3,000.00 | $1,800.00 |
| 24 | F & E struct steel (50500405) | LB | 41,800 | $6.40 | $6.50 | $13.36 | $10.00 | $13.00 |
| 25 | Reinf bars, epoxy CTD (50800205) | LB | 5,500 | $2.55 | $2.30 | $4.70 | $4.50 | $3.60 |
| 26 | Anchor bolts 3/4 (52100510) | EACH | 160 | $134.20 | $215.00 | $106.74 | $88.00 | $240.00 |
| 27 | Storm sew CL A 2 12 (550A0340) | LF | 3 | $1,000.00 | $500.00 | $1,381.99 | $1,250.00 | $1,000.00 |
| 28 | CB TC T1F OL (60206905) | EACH | 1 | $1,800.00 | $3,600.00 | $7,400.80 | $2,250.00 | $1,800.00 |
| 29 | CB reconst (60252800) | EACH | 1 | $3,200.00 | $2,900.00 | $2,629.73 | $4,000.00 | $3,200.00 |
| 30 | CB cleaned (60255410) | EACH | 1 | $750.00 | $3,500.00 | $2,212.47 | $6,000.00 | $450.00 |
| 31 | FR & lids T1 CL (60406100) | EACH | 1 | $650.00 | $500.00 | $750.00 | $812.00 | $650.00 |
| 32 | Comb CC&G TB6.12 (60603800) | LF | 349 | $92.10 | $83.00 | $51.35 | $68.00 | $53.50 |
| 33 | Engr field office A (67000400) | CAL MO | 6 | $2,500.00 | $3,000.00 | $2,382.76 | $6,000.00 | $3,500.00 |
| 34 | Mobilization (67100100) | LS | 1 | $41,700 | $41,000 | $51,123 | $57,000 | $51,500 |
| 35 | Changeable message SN (70107025) | CAL DAY | 180 | $30.00 | $30.00 | $33.18 | $44.00 | $35.00 |
| 36 | SHRT TRM pavt MK rem (70300150) | SF | 496 | $1.25 | $2.50 | $1.66 | $0.50 | $5.10 |
| 37 | Temp PVT MK L4 T4 tape (70307120) | LF | 1,093 | $1.40 | $1.50 | $1.66 | $1.40 | $1.30 |
| 38 | Temp PVT MK L8 T4 tape (70307140) | LF | 157 | $5.00 | $3.00 | $3.32 | $2.80 | $2.60 |
| 39 | Temp PVT MK L12 T4 tape (70307160) | LF | 31 | $10.00 | $5.00 | $5.53 | $4.30 | $3.90 |
| 40 | Temp conc barrier (70400100) | LF | 438 | $42.50 | $40.00 | $49.78 | $49.00 | $50.00 |
| 41 | Imp attn temp FRD TL2 (70600235) | EACH | 1 | $4,836.00 | $5,000.00 | $5,349.75 | $6,000.00 | $4,836.00 |
| 42 | THPL PVT MK line 4 (78000200) | LF | 1,071 | $3.15 | $4.50 | $4.98 | $5.10 | $3.60 |
| 43 | THPL PVT MK line 8 (78000500) | LF | 207 | $6.00 | $9.00 | $9.96 | $10.40 | $7.25 |
| 44 | THPL PVT MK line 12 (78000600) | LF | 12 | $12.00 | $15.00 | $16.60 | $28.70 | $20.00 |
| 45 | PVT MKG rem WTR blast (78300202) | SF | 502 | $5.00 | $4.50 | $4.98 | $8.70 | $5.10 |
| 46 | Rebuild EX handhole (89502376) | EACH | 1 | $7,000.00 | $4,100.00 | $1,500.00 | $8,000.00 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.