IDOT contract 62Y04 bid tabulation

Section (1293-BR)BR. Let by Illinois DOT on June 13, 2025, Cook, District 01. 5 bids received; low bid $694,687 by Areatha Construction Co., Inc..

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
46
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Areatha Construction Co., Inc.$694,687Low
2Lorig Construction Company$777,044+12%
3MYS, Incorporated$927,433+34%
4Rausch Infrastructure, LLC$949,806+37%
5Granite Construction Company$950,158+37%
IDOT contract 62Y04: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Areatha Construction Co., Inc.2. Lorig Construction Company3. MYS, Incorporated4. Rausch Infrastructure, LLC5. Granite Construction Company
1Valve box adj SPL (X6026624)EACH1$1,000.00$5,000.00$322.72$1,250.00$1,000.00
2FR & lids adjust SPL (X6030310)EACH1$1,400.00$2,700.00$520.31$1,750.00$1,400.00
3CH LK fence rem & RE (X6640304)LF105$75.00$77.00$82.92$93.00$74.96
4Traf cont & prot SPL (X7010216)LS1$17,000$145,000$19,912$17,000$12,999
5TR C-prot expressways (X7011015)LS1$1.00$1.00$2,735.14$6,000.00$0.01
6Temp info signing (X7200061)SF26$35.00$50.00$49.78$20.00$15.00
7Rem & RE EX railing (Z0007122)LF287$50.15$52.00$55.43$62.00$50.11
8Trench backfill (20800150)CY1$700.00$250.00$489.78$875.00$700.00
9Topsoil F & P 4 (21101615)SY20$75.00$55.00$100.00$93.00$10.00
10Seeding CL 1A (25000110)ACRE0.00$225,000$300,000$100,000$225,000$300,000
11Erosion contr blanket (25100630)SY20$50.00$12.00$50.00$62.00$25.00
12Perimeter eros bar (28000400)LF50$25.00$21.00$20.00$31.00$25.00
13Inlet filters (28000510)EACH1$360.00$300.00$205.00$450.00$500.00
14Sub gran mat B (31101000)TON35$74.25$145.00$76.20$139.00$125.00
15PCC bse cse 10 (35300500)SY78$266.70$165.00$106.95$187.00$98.00
16Bit matls tack CT (40600290)LB35$0.10$10.00$11.06$0.13$0.10
17HMA SC IL-9.5 D N70 (40604062)TON7$2,850.00$1,000.00$995.84$3,500.00$2,850.00
18PC conc sidewalk 5 (42400200)SF2,251$14.05$14.00$12.50$25.00$12.50
19Pavement rem (44000100)SY144$58.80$45.00$65.05$92.00$50.00
20Comb curb gutter rem (44000500)LF349$15.55$17.00$10.43$37.00$20.00
21Sidewalk rem (44000600)SF1,818$3.30$2.00$2.30$10.00$10.00
22Saw cuts (44213200)LF349$4.00$8.00$5.00$3.00$2.50
23Conc struct (50300225)CY31.60$3,243.70$1,800.00$1,822.59$3,000.00$1,800.00
24F & E struct steel (50500405)LB41,800$6.40$6.50$13.36$10.00$13.00
25Reinf bars, epoxy CTD (50800205)LB5,500$2.55$2.30$4.70$4.50$3.60
26Anchor bolts 3/4 (52100510)EACH160$134.20$215.00$106.74$88.00$240.00
27Storm sew CL A 2 12 (550A0340)LF3$1,000.00$500.00$1,381.99$1,250.00$1,000.00
28CB TC T1F OL (60206905)EACH1$1,800.00$3,600.00$7,400.80$2,250.00$1,800.00
29CB reconst (60252800)EACH1$3,200.00$2,900.00$2,629.73$4,000.00$3,200.00
30CB cleaned (60255410)EACH1$750.00$3,500.00$2,212.47$6,000.00$450.00
31FR & lids T1 CL (60406100)EACH1$650.00$500.00$750.00$812.00$650.00
32Comb CC&G TB6.12 (60603800)LF349$92.10$83.00$51.35$68.00$53.50
33Engr field office A (67000400)CAL MO6$2,500.00$3,000.00$2,382.76$6,000.00$3,500.00
34Mobilization (67100100)LS1$41,700$41,000$51,123$57,000$51,500
35Changeable message SN (70107025)CAL DAY180$30.00$30.00$33.18$44.00$35.00
36SHRT TRM pavt MK rem (70300150)SF496$1.25$2.50$1.66$0.50$5.10
37Temp PVT MK L4 T4 tape (70307120)LF1,093$1.40$1.50$1.66$1.40$1.30
38Temp PVT MK L8 T4 tape (70307140)LF157$5.00$3.00$3.32$2.80$2.60
39Temp PVT MK L12 T4 tape (70307160)LF31$10.00$5.00$5.53$4.30$3.90
40Temp conc barrier (70400100)LF438$42.50$40.00$49.78$49.00$50.00
41Imp attn temp FRD TL2 (70600235)EACH1$4,836.00$5,000.00$5,349.75$6,000.00$4,836.00
42THPL PVT MK line 4 (78000200)LF1,071$3.15$4.50$4.98$5.10$3.60
43THPL PVT MK line 8 (78000500)LF207$6.00$9.00$9.96$10.40$7.25
44THPL PVT MK line 12 (78000600)LF12$12.00$15.00$16.60$28.70$20.00
45PVT MKG rem WTR blast (78300202)SF502$5.00$4.50$4.98$8.70$5.10
46Rebuild EX handhole (89502376)EACH1$7,000.00$4,100.00$1,500.00$8,000.00$10,000
IDOT contract 62Y04: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy