IDOT contract 61M25 bid tabulation
Project Number: H406-985 / /, section 16-11107-01-BR. Let by Illinois DOT on February 27, 2026, Will, District 01. 7 bids received; low bid $1,561,361 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 79
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $1,561,361 | Low |
| 2 | Austin Tyler Construction, Inc. | $1,757,816 | +13% |
| 3 | MYS, Incorporated | $1,866,929 | +20% |
| 4 | Herlihy Mid-Continent Company | $1,944,577 | +25% |
| 5 | Lorig Construction Company | $2,025,700 | +30% |
| 6 | Areatha Construction Co., Inc. | $2,133,324 | +37% |
| 7 | Rausch Infrastructure, LLC | $2,235,707 | +43% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Austin Tyler Construction, Inc. | 3. MYS, Incorporated | 4. Herlihy Mid-Continent Company | 5. Lorig Construction Company | 6. Areatha Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Explor exc utility (XX008195) | LF | 50 | $0.01 | $36.00 | $110.37 | $98.00 | $80.00 | $31.95 |
| 2 | Press BRK STL tub gir (XX009569) | SF | 3,427 | $139.50 | $144.00 | $144.25 | $185.00 | $145.00 | $137.25 |
| 3 | Washout basin (X0326806) | LS | 1 | $4,000.00 | $500.00 | $2,150.16 | $1,400.00 | $100.00 | $1,450.25 |
| 4 | Channel excav SPL (X2030300) | CY | 390 | $50.00 | $58.00 | $96.16 | $75.00 | $75.00 | $133.00 |
| 5 | Temp access- priv ent (X4021000) | EACH | 1 | $1,000.00 | $750.00 | $1,163.61 | $800.00 | $1,100.00 | $2,064.50 |
| 6 | HMA surf rem var DP (X4401198) | SY | 375 | $20.00 | $9.50 | $33.11 | $18.37 | $20.00 | $42.00 |
| 7 | Traf bar term TY 1 (X6310164) | EACH | 1 | $2,802.80 | $2,548.00 | $2,812.30 | $2,548.00 | $1,700.00 | $2,548.00 |
| 8 | Traf cont & prot SPL (X7010216) | LS | 1 | $35,000 | $23,500 | $25,889 | $17,000 | $142,000 | $19,000 |
| 9 | Temp info signing (X7200061) | SF | 107 | $30.00 | $15.00 | $19.86 | $18.00 | $20.00 | $17.00 |
| 10 | Remov sign complete (X7240205) | EACH | 2 | $357.50 | $150.00 | $386.30 | $350.00 | $750.00 | $1,800.00 |
| 11 | Temp TR signal timing (X8900104) | EACH | 2 | $660.00 | $900.00 | $662.23 | $900.00 | $600.00 | $600.00 |
| 12 | Asb bearing pad remov (Z0001900) | EACH | 40 | $75.00 | $185.00 | $220.75 | $23.00 | $375.00 | $250.00 |
| 13 | Construction layout (Z0013798) | LS | 1 | $15,000 | $16,000 | $13,797 | $17,100 | $25,000 | $35,000 |
| 14 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 15 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 16 | Temporary fence (20101000) | LF | 80 | $8.80 | $8.00 | $4.14 | $4.00 | $5.00 | $12.00 |
| 17 | Tree root pruning (20101200) | EACH | 2 | $600.00 | $50.00 | $607.05 | $300.00 | $1,000.00 | $450.00 |
| 18 | Earth excavation (20200100) | CY | 176 | $37.50 | $93.00 | $108.64 | $26.50 | $95.00 | $82.35 |
| 19 | Rem & disp uns matl (20201200) | CY | 180 | $50.00 | $41.00 | $92.25 | $45.00 | $75.00 | $107.25 |
| 20 | Geotech fab F/GR stab (21001000) | SY | 225 | $5.00 | $4.00 | $10.86 | $2.00 | $4.00 | $7.35 |
| 21 | Topsoil F & P 6 (21101625) | SY | 1,450 | $6.60 | $6.00 | $13.55 | $6.00 | $13.00 | $15.50 |
| 22 | Seeding CL 1A (25000110) | ACRE | 0.25 | $2,662.00 | $2,420.00 | $2,483.39 | $2,420.00 | $2,500.00 | $5,800.00 |
| 23 | Seeding CL 4B (25000314) | ACRE | 0.25 | $3,993.00 | $3,630.00 | $7,726.10 | $3,630.00 | $7,000.00 | $6,800.00 |
| 24 | Seeding CL 5B (25000324) | ACRE | 0.25 | $3,993.00 | $3,630.00 | $7,726.10 | $3,630.00 | $7,000.00 | $4,700.00 |
| 25 | Nitrogen fert nutr (25000400) | LB | 25 | $3.30 | $3.00 | $5.52 | $3.00 | $5.00 | $2.50 |
| 26 | Potassium fert nutr (25000600) | LB | 25 | $3.30 | $3.00 | $5.52 | $3.00 | $5.00 | $2.50 |
| 27 | Wildlife friendly ecb (25100645) | SY | 1,450 | $5.50 | $5.00 | $2.10 | $5.00 | $2.00 | $2.00 |
| 28 | Temp ditch checks (28000305) | LF | 150 | $16.50 | $15.00 | $13.24 | $15.00 | $12.00 | $15.00 |
| 29 | Perimeter eros bar (28000400) | LF | 950 | $3.30 | $2.50 | $4.41 | $3.00 | $4.00 | $4.00 |
| 30 | Stone riprap CL A4 (28100107) | SY | 570 | $80.00 | $97.00 | $129.54 | $113.00 | $120.00 | $116.65 |
| 31 | Filter fabric (28200200) | SY | 570 | $5.00 | $4.00 | $3.31 | $3.00 | $3.00 | $8.05 |
| 32 | Agg subgrade improve (30300001) | CY | 10 | $100.00 | $66.00 | $117.93 | $82.00 | $120.00 | $101.65 |
| 33 | Agg subgrade impr 12 (30300112) | SY | 85 | $40.00 | $34.00 | $72.36 | $56.00 | $50.00 | $70.75 |
| 34 | Agg base cse B 4 (35101600) | SY | 210 | $7.50 | $10.50 | $22.57 | $15.00 | $15.00 | $36.30 |
| 35 | Agg base cse B 8 (35102000) | SY | 105 | $18.00 | $19.50 | $63.32 | $26.50 | $32.00 | $48.40 |
| 36 | Bit matls tack CT (40600290) | LB | 200 | $10.00 | $0.01 | $0.01 | $0.01 | $0.10 | $0.10 |
| 37 | HMA surf rem butt JT (40600982) | SY | 25 | $22.50 | $0.01 | $30.90 | $84.71 | $90.00 | $50.00 |
| 38 | HMA BC IL-19.0 N50 (40603080) | TON | 18 | $200.00 | $180.00 | $303.52 | $435.64 | $455.00 | $382.00 |
| 39 | HMA SC IL-9.5 D N50 (40604060) | TON | 49 | $200.00 | $114.00 | $320.08 | $270.37 | $280.00 | $385.00 |
| 40 | PVT con PCC BR app SL (42000080) | SY | 155 | $240.00 | $219.00 | $226.09 | $250.00 | $230.00 | $225.60 |
| 41 | PCC driveway pavt 6 (42300200) | SY | 55 | $80.00 | $116.00 | $144.67 | $99.00 | $111.00 | $187.10 |
| 42 | Pavement rem (44000100) | SY | 365 | $15.00 | $17.00 | $45.04 | $15.00 | $33.00 | $31.55 |
| 43 | Drive pavement rem (44000200) | SY | 56 | $10.00 | $29.00 | $32.94 | $25.00 | $31.00 | $24.80 |
| 44 | CL D patch T1 8 (44201737) | SY | 20 | $110.00 | $139.00 | $320.08 | $229.69 | $125.00 | $355.00 |
| 45 | CL D patch T2 8 (44201741) | SY | 20 | $110.00 | $139.00 | $320.08 | $213.45 | $125.00 | $355.00 |
| 46 | CL D patch T3 8 (44201745) | SY | 20 | $110.00 | $139.00 | $320.08 | $194.00 | $125.00 | $355.00 |
| 47 | Aggregate SHLDS B 6 (48101500) | SY | 35 | $15.00 | $28.00 | $55.19 | $45.00 | $40.00 | $36.70 |
| 48 | HMA shoulders 4 (48203013) | SY | 95 | $29.00 | $60.00 | $104.85 | $94.39 | $100.00 | $112.75 |
| 49 | Rem exist sup-STR (50101500) | EACH | 1 | $35,000 | $55,000 | $86,983 | $180,250 | $225,000 | $239,329 |
| 50 | Conc rem (50102400) | CY | 3.30 | $3,000.00 | $2,400.00 | $1,473.06 | $1,250.00 | $4,000.00 | $1,490.80 |
| 51 | Structure excavation (50200100) | CY | 74 | $45.00 | $73.00 | $115.91 | $50.00 | $90.00 | $105.55 |
| 52 | Cofferdam typ 2 loc 1 (50201121) | EACH | 2 | $25,000 | $32,000 | $18,271 | $25,500 | $1,000.00 | $40,000 |
| 53 | Conc struct (50300225) | CY | 34.50 | $3,000.00 | $4,550.00 | $2,934.10 | $3,000.00 | $5,000.00 | $5,086.15 |
| 54 | Conc sup-STR (50300255) | CY | 138.80 | $1,080.00 | $2,135.00 | $2,144.64 | $1,680.00 | $1,350.00 | $2,022.45 |
| 55 | BR deck grooving (50300260) | SY | 527 | $15.00 | $12.00 | $9.97 | $16.77 | $12.00 | $11.45 |
| 56 | Protective coat (50300300) | SY | 868 | $1.00 | $3.00 | $2.73 | $3.00 | $2.00 | $2.25 |
| 57 | Conc supstr app slab (50301350) | CY | 93.20 | $550.00 | $829.00 | $740.12 | $950.00 | $600.00 | $607.25 |
| 58 | Reinf bars, epoxy CTD (50800205) | LB | 76,840 | $2.25 | $2.00 | $1.99 | $1.33 | $1.50 | $1.55 |
| 59 | Name plates (51500100) | EACH | 1 | $1,500.00 | $750.00 | $936.46 | $800.00 | $1,100.00 | $1,479.85 |
| 60 | STR rep con DP = < 5 (53212754) | SF | 20 | $250.00 | $435.00 | $441.49 | $145.00 | $550.00 | $416.70 |
| 61 | STR rep con DP over 5 (53212755) | SF | 70 | $250.00 | $435.00 | $248.34 | $105.00 | $575.00 | $317.60 |
| 62 | Granular backfill STR (58600101) | CY | 64 | $60.00 | $91.00 | $104.01 | $92.00 | $150.00 | $88.80 |
| 63 | Epoxy crack injection (59000200) | LF | 98 | $75.00 | $60.00 | $110.37 | $60.00 | $70.00 | $65.00 |
| 64 | Geocomposite wall DR (59100100) | SY | 42 | $35.00 | $42.00 | $66.23 | $25.00 | $45.00 | $68.60 |
| 65 | Conc HDWL for P drain (60100060) | EACH | 4 | $400.00 | $550.00 | $578.23 | $430.00 | $800.00 | $1,100.00 |
| 66 | P undr for struct 4 (60146304) | LF | 164 | $27.50 | $21.00 | $82.78 | $25.00 | $42.00 | $35.00 |
| 67 | SPBGR TY B 6FT posts (63000007) | LF | 82 | $51.51 | $47.00 | $51.69 | $46.83 | $50.00 | $46.85 |
| 68 | Traf bar term T5 (63100070) | EACH | 2 | $1,376.10 | $1,251.00 | $1,380.76 | $1,251.00 | $1,300.00 | $1,251.00 |
| 69 | Traf bar term T6 (63100085) | EACH | 2 | $4,362.60 | $3,966.00 | $4,377.39 | $3,966.00 | $4,100.00 | $3,966.00 |
| 70 | TR bar TRM T1 SPL tan (63100167) | EACH | 3 | $3,928.10 | $3,571.00 | $3,941.41 | $3,571.00 | $3,700.00 | $3,571.00 |
| 71 | Guardrail remov (63200310) | LF | 240 | $9.02 | $8.00 | $9.05 | $8.20 | $8.50 | $8.20 |
| 72 | Engr field office B (67000500) | CAL MO | 6 | $5,000.00 | $2,000.00 | $4,414.91 | $5,300.00 | $4,000.00 | $2,500.00 |
| 73 | Mobilization (67100100) | LS | 1 | $88,500 | $39,400 | $63,350 | $120,000 | $100,000 | $130,000 |
| 74 | Changeable message SN (70107025) | CAL DAY | 370 | $50.00 | $30.00 | $22.07 | $20.00 | $30.00 | $30.00 |
| 75 | Terminal marker - DA (72501000) | EACH | 4 | $38.50 | $35.00 | $38.63 | $35.00 | $35.00 | $35.00 |
| 76 | THPL PVT MK line 4 (78000200) | LF | 1,870 | $2.75 | $2.50 | $3.15 | $2.85 | $3.50 | $3.25 |
| 77 | Epoxy PVT MK line 4 (78005110) | LF | 825 | $6.38 | $5.80 | $4.25 | $3.82 | $7.00 | $7.00 |
| 78 | Grdrail ref type A (78200005) | EACH | 8 | $13.20 | $12.00 | $13.24 | $12.00 | $12.00 | $12.00 |
| 79 | PVT MKG rem WTR blast (78300202) | SF | 100 | $33.00 | $45.00 | $22.07 | $20.00 | $25.00 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.