IDOT contract 62Y13 bid tabulation

Section (1293-BR)BDR,BJR. Let by Illinois DOT on September 19, 2025, Cook, District 01. 6 bids received; low bid $966,309 by Martam Construction Incorporated.

Owner
Illinois DOT
Letting
19 SEP 2025
Pay items
94
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Martam Construction Incorporated$966,309Low
2Areatha Construction Co., Inc.$975,645+1.0%
3Lorig Construction Company$978,092+1.0%
4MYS, Incorporated$984,061+2.0%
5Alliance Contractors, Inc.$1,164,811+21%
6Rausch Infrastructure, LLC$1,215,514+26%
IDOT contract 62Y13: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Martam Construction Incorporated2. Areatha Construction Co., Inc.3. Lorig Construction Company4. MYS, Incorporated5. Alliance Contractors, Inc.6. Rausch Infrastructure, LLC
1Acrylic coating (X0325748)SY12.30$90.00$75.00$160.00$160.84$23.00$88.00
2Fiber wrap (X0325749)SF76$200.00$190.00$200.00$205.22$225.00$223.00
3Clean reseal RLF JNT (X0326766)LF109$56.00$123.12$70.00$83.19$46.20$122.00
4Stream gauge (X0327638)EACH1$1,500.00$2,959.59$3,000.00$2,734.67$1,500.00$3,200.00
5Selective clearing (X2010516)UNIT1$4,000.00$1,200.00$1,800.00$1,774.83$1,600.00$1,880.00
6GR stab geosynthetic (X2100106)SY17$85.00$85.16$33.00$65.08$75.00$2,300.00
7PC conc sidewalk 5 SP (X4240430)SF350$32.00$17.92$24.00$25.44$39.95$52.00
8PCC surf rem 2 (X4406816)SY256$20.00$0.50$22.00$55.46$50.00$0.60
9BR deck grooving long (X5030250)SY1,268$8.00$7.40$9.00$9.43$10.15$9.00
10Floor drains cleaned (X5030539)EACH28$220.00$193.15$200.00$0.01$200.00$235.00
11Repair bridge rail (X5091732)LF10$525.00$476.10$485.00$528.13$476.10$559.00
12SS cleaned 12 (X5537800)LF60$20.00$1.00$1.00$44.37$1.00$1.20
13FR & lids adjust SPL (X6030310)EACH2$1,200.00$1,200.00$2,200.00$378.21$2,500.00$1,050.00
14Rem/repl SPBGR SPL (X6331009)LF34$90.00$76.71$80.00$84.76$76.71$90.00
15Fill EX rumble strip (X6420002)LF200$60.00$55.00$15.00$61.01$55.00$64.00
16Centerln rum strip 16 (X6420114)LF200$15.00$20.59$14.00$61.01$55.00$13.00
17Engrs FLD ofc TY A D1 (X6700407)CAL MO12$3,200.00$1,500.00$3,500.00$3,165.26$250.00$5,500.00
18Traf cont & prot SPL (X7010216)LS1$122,000$29,500$115,000$29,300$91,650$47,000
19Speed display trailer (X7010410)CAL MO3$400.00$500.00$500.00$499.17$900.00$528.00
20Temp info signing (X7200061)SF64$20.00$20.00$13.00$13.31$25.00$14.00
21RRPM reflector removl (X7830050)EACH138$8.00$10.00$25.00$8.32$7.50$11.00
22RRPM reflector replac (X7830052)EACH138$13.00$15.00$15.00$13.31$16.00$17.00
23Temp TR signal timing (X8900104)EACH2$1,500.00$1,500.00$1,000.00$1,081.54$1,795.00$2,109.00
24Appr slab repair (FD) (Z0001700)SY6$2,200.00$2,046.95$1,100.00$2,898.56$3,295.00$2,700.00
25Appr slab repair (PD) (Z0001800)SY3$1,500.00$1,601.38$1,000.00$1,484.95$1,525.00$4,400.00
26BR DK LTX C oly 2 3/4 (Z0006016)SY1,322$126.00$160.75$127.00$150.18$256.00$134.00
27BR deck scar 3/4 (Z0012130)SY1,657$49.00$88.25$55.00$62.53$37.50$68.00
28STR rep con DP = < 5 (Z0012754)SF52$260.00$278.48$425.00$415.97$350.00$265.00
29STR rep con DP over 5 (Z0012755)SF13$280.00$488.33$525.00$443.71$420.00$300.00
30Construction layout (Z0013798)LS1$5,000.00$6,500.00$10,000$1,663.91$10,000$20,000
31Debris removal (Z0015550)CY60$115.00$100.00$50.00$292.89$10.00$600.00
32Deck slab rep (FD-T2) (Z0016002)SY1$4,500.00$5,921.86$3,500.00$4,499.00$3,695.00$16,000
33Drainage STR cleaned (Z0018500)EACH6$800.00$750.00$750.00$554.64$750.00$881.00
34Drill-grout #6 T-bar (Z0018911)EACH78$38.00$20.32$17.00$28.12$25.00$58.00
35Diamond grind BR sec (Z0029090)SY1,268$12.00$14.50$12.00$12.96$13.45$12.00
36Polymer concrete (Z0041895)CF6.60$1,100.00$2,046.03$1,800.00$1,937.00$445.00$2,464.00
37P P conc I-BM repair (Z0043800)SF52$250.00$225.00$215.00$221.86$350.00$265.00
38Tree remov 6-15 (20100110)UNIT50$65.00$50.00$80.00$86.52$78.00$92.00
39Temporary fence (20101000)LF200$10.00$7.50$8.00$8.32$7.50$9.00
40Earth excavation (20200100)CY5$185.00$302.97$105.00$88.61$10.00$400.00
41Perimeter eros bar (28000400)LF68$8.00$7.00$7.00$7.76$7.00$8.00
42Inlet filters (28000510)EACH4$250.00$300.00$300.00$332.78$25.00$352.00
43Stone riprap CL A5 (28100109)SY167$98.00$50.00$275.00$193.27$285.00$166.00
44Filter fabric (28200200)SY167$2.00$9.26$7.00$5.42$1.00$21.00
45Agg base cse B 4 (35101600)SY46$16.00$1.00$31.00$20.67$25.00$46.00
46Bit matls tack CT (40600290)LB277$8.00$7.00$7.00$7.76$7.00$8.00
47Long joint sealant (40600370)LF216$48.00$48.00$48.00$53.24$48.00$56.00
48HMA SC IL-9.5 D N70 (40604062)TON69$525.00$485.00$500.00$538.00$485.00$569.00
49PC conc sidewalk 5 (42400200)SF1,873$13.00$17.89$15.00$13.54$11.50$17.00
50Detectable warnings (42400800)SF48$43.00$48.25$63.00$49.47$40.00$99.00
51HMA surf rem 6 (44000173)SY25$45.00$64.71$75.00$33.28$30.00$35.00
52Comb curb gutter rem (44000500)LF284$12.00$15.53$25.00$45.88$20.00$30.00
53Sidewalk rem (44000600)SF2,168$2.00$1.58$4.50$2.89$5.00$8.00
54CL B patch T2 10 (44200970)SY34$545.00$733.14$225.00$403.03$530.00$776.00
55Dowel bars 1 1/4 (44201298)EACH98$38.00$42.51$28.00$54.79$35.00$58.00
56Protective coat (50300300)SY1,322$1.00$2.86$1.25$4.05$2.90$8.00
57Storm sew CL A 1 12 (550A0050)LF47$138.00$120.00$140.00$210.59$215.00$150.00
58Storm sewer rem 12 (55100500)LF47$30.00$20.00$40.00$26.99$25.00$50.00
59Concrete sealer (58700300)SF4,489$3.00$1.77$3.00$0.78$2.93$3.00
60Contr low-streng matl (59300100)CY1.20$456.00$4,158.36$1,800.00$1,521.68$210.00$667.00
61Man adjust (60255500)EACH4$600.00$950.00$1,700.00$980.34$250.00$1,800.00
62Inlets adjust (60260100)EACH5$600.00$750.00$900.00$776.41$250.00$900.00
63FR & grates T24 (60404950)EACH1$550.00$950.00$500.00$1,130.59$625.00$950.00
64FR & lids T1 CL (60406100)EACH1$400.00$950.00$400.00$864.80$425.00$1,050.00
65Comb CC&G TY B-6.24 (60605000)LF284$62.00$111.82$105.00$104.05$65.00$64.00
66Traf bar term T6 (63100085)EACH1$5,700.00$5,211.00$5,300.00$5,780.41$5,211.00$6,122.00
67Guardrail remov (63200310)LF38$20.00$19.44$20.00$21.56$19.44$22.00
68Non SPL waste disposl (66900200)CY5$85.00$404.15$135.00$137.66$425.00$180.00
69Soil disposal analy (66900530)EACH1$4,800.00$1,800.00$2,000.00$6,877.48$1,550.00$2,350.00
70Reg sub P-const plan (66901001)LS1$8,500.00$3,400.00$2,300.00$3,327.82$3,600.00$2,702.00
71Reg sub F con report (66901003)LS1$1,500.00$500.00$2,100.00$3,327.82$2,400.00$2,467.00
72Reg sub mon (66901006)CAL DAY10$1.00$700.00$700.00$1,098.18$1,150.00$1,410.00
73Mobilization (67100100)LS1$54,000$58,560$54,000$42,651$69,000$73,000
74Changeable message SN (70107025)CAL DAY56$35.00$35.00$35.00$33.28$50.00$35.00
75SHRT TRM pavt MK rem (70300150)SF50$6.00$5.00$2.00$2.22$1.00$2.30
76Temp PVT MK line 6 - paint (70300241)LF1,048$1.00$1.75$0.45$0.44$0.75$0.40
77Temp PVT MK LTR & sym T4 tape (70307100)SF183$6.00$8.00$4.00$4.05$3.75$4.20
78Temp PVT MK L4 T4 tape (70307120)LF9,054$1.40$1.35$0.85$0.94$1.30$1.00
79Temp PVT MK L6 T4 tape (70307130)LF1,316$2.00$1.95$1.50$1.66$1.95$1.70
80Temp conc barrier (70400100)LF562.50$32.00$44.79$28.00$38.27$38.00$41.00
81Rel temp conc barrier (70400200)LF562.50$5.00$12.45$6.00$5.88$13.00$7.00
82Imp attn temp NRN TL2 (70600241)EACH2$3,800.00$2,600.00$2,500.00$2,773.18$3,518.00$2,937.00
83Imp attn rel NRN TL2 (70600341)EACH2$1,700.00$1,100.00$500.00$554.64$1,510.00$587.00
84Pref PL PM TD STD L 7 (78004635)LF289$19.00$11.00$11.00$19.41$17.50$12.90
85Mod ureth PM LTR-sym (78009000)SF110$7.00$8.00$8.00$6.66$5.00$9.40
86Mod ureth PM line 4 (78009004)LF6,590$1.20$0.85$0.90$1.22$1.20$1.00
87Mod ureth PM line 6 (78009006)LF824$1.60$1.45$1.60$1.66$2.40$1.70
88Mod ureth PM line 12 (78009012)LF357$3.30$2.85$3.00$3.33$4.45$3.30
89Mod ureth PM line 24 (78009024)LF88$7.00$8.00$8.00$6.66$9.20$9.40
90GRV RCSD PVT MRKG 8 (78011040)LF289$10.00$11.50$12.00$10.54$6.25$13.50
91Raised refl pavt MKR (78100100)EACH20$260.00$260.00$260.00$277.32$235.00$305.00
92Raised ref PVT MK rem (78300200)EACH32$20.00$15.00$25.00$49.92$75.00$17.00
93PVT MKG rem WTR blast (78300202)SF2,783$1.60$1.85$1.50$1.66$3.00$1.70
94Main EX TR sig instal (85000200)EACH2$15,000$3,000.00$2,000.00$5,546.35$21,600$25,000
IDOT contract 62Y13: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy