IDOT contract 62T48 bid tabulation
Section FAU. Let by Illinois DOT on March 7, 2025, Cook, District 01. 4 bids received; low bid $589,859 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 73
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $589,859 | Low |
| 2 | Areatha Construction Co., Inc. | $689,995 | +17% |
| 3 | MYS, Incorporated | $711,121 | +21% |
| 4 | Rausch Infrastructure, LLC | $888,561 | +51% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Areatha Construction Co., Inc. | 3. MYS, Incorporated | 4. Rausch Infrastructure, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $6,000.00 | $3,500.00 | $11.21 | $14,000 |
| 2 | Eros cont blanket SPL (X2511630) | SY | 28 | $13.20 | $12.00 | $13.45 | $14.00 |
| 3 | CC&G RMVL repl > 10FT (X4400503) | LF | 200 | $46.20 | $112.20 | $90.80 | $95.00 |
| 4 | Repair bridge rail (X5091732) | LF | 34 | $93.50 | $238.55 | $267.40 | $277.00 |
| 5 | SS cleaned 12 (X5537800) | LF | 150 | $10.00 | $2.50 | $2.80 | $3.00 |
| 6 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $5,000.00 | $2,500.00 | $2,802.56 | $6,000.00 |
| 7 | Traf cont & prot SPL (X7010216) | LS | 1 | $22,600 | $19,800 | $24,102 | $39,000 |
| 8 | RRPM reflector removl (X7830050) | EACH | 95 | $15.00 | $10.00 | $28.03 | $11.00 |
| 9 | RRPM reflector replac (X7830052) | EACH | 95 | $27.50 | $16.00 | $28.03 | $23.00 |
| 10 | Det loop repl (X8860105) | LF | 66 | $60.00 | $52.00 | $57.81 | $60.00 |
| 11 | Appr slab repair (FD) (Z0001700) | SY | 1 | $4,000.00 | $2,913.90 | $3,923.58 | $12,000 |
| 12 | Appr slab repair (PD) (Z0001800) | SY | 20 | $800.00 | $1,194.10 | $1,569.43 | $1,650.00 |
| 13 | HMA surface RM (deck) (Z0004556) | SY | 534 | $10.00 | $12.80 | $21.30 | $14.00 |
| 14 | BR DK LTX C oly 2 1/2 (Z0006014) | SY | 245 | $310.00 | $376.30 | $284.74 | $463.00 |
| 15 | BR deck scar 1 (Z0012132) | SY | 245 | $95.00 | $286.30 | $265.76 | $249.00 |
| 16 | BR deck scar 3 (Z0012148) | SY | 35 | $150.00 | $399.50 | $175.56 | $618.00 |
| 17 | STR rep con DP = < 5 (Z0012754) | SF | 328 | $160.00 | $160.95 | $184.97 | $203.00 |
| 18 | Deck slab rep (FD-T2) (Z0016002) | SY | 4 | $1,800.00 | $2,542.40 | $2,017.84 | $5,900.00 |
| 19 | Drainage STR cleaned (Z0018500) | EACH | 6 | $500.00 | $540.00 | $605.35 | $629.00 |
| 20 | Temp info signing (Z0030850) | SF | 62 | $25.00 | $16.00 | $13.45 | $11.00 |
| 21 | Temp TR signal timing (Z0073510) | EACH | 2 | $990.00 | $1,800.00 | $560.51 | $1,048.00 |
| 22 | Earth excavation (20200100) | CY | 25 | $50.00 | $98.60 | $117.26 | $168.00 |
| 23 | Topsoil F & P 4 (21101615) | SY | 19 | $71.50 | $65.00 | $72.87 | $75.00 |
| 24 | Grading & shap ditch (21400100) | LF | 20 | $50.00 | $38.00 | $46.53 | $279.00 |
| 25 | Nitrogen fert nutr (25000400) | LB | 1 | $16.50 | $15.00 | $16.82 | $17.00 |
| 26 | Potassium fert nutr (25000600) | LB | 1 | $16.50 | $15.00 | $16.82 | $17.00 |
| 27 | Sodding salt tolerant (25200110) | SY | 19 | $209.00 | $190.00 | $212.99 | $221.00 |
| 28 | Supple watering (25200200) | UNIT | 1 | $44.00 | $40.00 | $44.84 | $46.00 |
| 29 | Temp eros contr seed (28000250) | LB | 6 | $55.00 | $50.00 | $56.05 | $58.00 |
| 30 | Stone riprap CL A2 (28100103) | SY | 12 | $120.00 | $223.90 | $270.95 | $368.00 |
| 31 | Filter fabric (28200200) | SY | 16 | $5.00 | $26.45 | $33.50 | $125.00 |
| 32 | Agg base cse B (35101400) | TON | 2 | $135.00 | $212.45 | $484.54 | $557.00 |
| 33 | Bit matls tack CT (40600290) | LB | 240 | $0.01 | $0.01 | $0.01 | $0.12 |
| 34 | HMA surf rem butt JT (40600982) | SY | 70 | $0.01 | $0.10 | $26.90 | $29.00 |
| 35 | HMA SC IL-9.5 D N70 (40604062) | TON | 86 | $160.00 | $320.00 | $358.73 | $390.00 |
| 36 | PC conc sidewalk 5 (42400200) | SF | 700 | $13.75 | $16.85 | $10.24 | $14.50 |
| 37 | Sidewalk rem (44000600) | SF | 700 | $3.00 | $5.30 | $3.48 | $15.00 |
| 38 | Median removal (44003100) | SF | 1,135 | $6.00 | $6.70 | $3.48 | $17.00 |
| 39 | Conc rem (50102400) | CY | 16.90 | $2,500.00 | $2,628.20 | $2,802.56 | $1,675.00 |
| 40 | Conc sup-STR (50300255) | CY | 14 | $2,500.00 | $2,229.10 | $3,811.48 | $3,825.00 |
| 41 | BR deck grooving (50300260) | SY | 257 | $27.00 | $29.65 | $22.42 | $23.00 |
| 42 | Protective coat (50300300) | SY | 536 | $1.00 | $2.75 | $5.06 | $9.00 |
| 43 | Reinf bars, epoxy CTD (50800205) | LB | 2,110 | $3.50 | $4.35 | $5.83 | $3.30 |
| 44 | PRC flar end sec 15 (54213660) | EACH | 1 | $1,500.00 | $3,503.70 | $1,354.67 | $932.00 |
| 45 | Storm sew CL A 1 15 (550A0070) | LF | 16 | $200.00 | $392.85 | $174.40 | $175.00 |
| 46 | FR & grates adjust (60300105) | EACH | 4 | $800.00 | $1,000.00 | $632.23 | $990.00 |
| 47 | Conc med TSM6.18 (60623105) | SF | 1,135 | $22.28 | $24.65 | $29.18 | $25.00 |
| 48 | Non SPL waste disposl (66900200) | CY | 20 | $100.00 | $138.30 | $109.45 | $123.00 |
| 49 | Soil disposal analy (66900530) | EACH | 3 | $1,815.00 | $1,425.00 | $1,793.64 | $1,864.00 |
| 50 | Reg sub P-const plan (66901001) | LS | 1 | $2,475.00 | $3,400.00 | $2,578.36 | $2,680.00 |
| 51 | Reg sub F con report (66901003) | LS | 1 | $2,475.00 | $500.00 | $2,354.15 | $2,446.00 |
| 52 | Reg sub mon (66901006) | CAL DAY | 3 | $990.00 | $700.00 | $1,109.81 | $1,153.00 |
| 53 | Mobilization (67100100) | LS | 1 | $33,350 | $41,500 | $39,554 | $53,000 |
| 54 | TR cont surveillance (70103815) | CAL DAY | 10 | $0.01 | $250.00 | $336.31 | $291.00 |
| 55 | Changeable message SN (70107025) | CAL DAY | 150 | $50.00 | $25.00 | $33.63 | $32.00 |
| 56 | SHRT TRM pavt MK rem (70300150) | SF | 243 | $2.00 | $2.00 | $1.12 | $1.10 |
| 57 | Temp PVT MK L4 T4 tape (70307120) | LF | 2,723 | $2.00 | $1.30 | $1.12 | $1.10 |
| 58 | Temp conc barrier (70400100) | LF | 375 | $35.00 | $65.60 | $72.87 | $75.00 |
| 59 | Rel temp conc barrier (70400200) | LF | 375 | $15.00 | $21.70 | $28.03 | $29.00 |
| 60 | Imp attn temp NRD TL3 (70600250) | EACH | 2 | $6,000.00 | $3,200.00 | $2,690.46 | $2,621.00 |
| 61 | Imp attn rel NRD TL3 (70600350) | EACH | 2 | $2,500.00 | $1,500.00 | $560.51 | $524.00 |
| 62 | THPL PVT MK LTR & sym (78000100) | SF | 73 | $11.72 | $10.00 | $10.09 | $13.90 |
| 63 | THPL PVT MK line 4 (78000200) | LF | 501 | $4.24 | $3.00 | $3.64 | $2.30 |
| 64 | THPL PVT MK line 6 (78000400) | LF | 371 | $4.62 | $4.75 | $4.24 | $3.50 |
| 65 | THPL PVT MK line 24 (78000650) | LF | 98 | $19.25 | $9.50 | $10.09 | $13.90 |
| 66 | Pref PL PM TB STD L4 (78003111) | LF | 18 | $49.50 | $43.00 | $50.45 | $192.20 |
| 67 | Pref PL PM TB STD L6 (78003131) | LF | 5 | $66.94 | $46.00 | $68.21 | $233.00 |
| 68 | GRV RCSD PVT MRKG 5 (78011025) | LF | 18 | $27.50 | $35.00 | $28.03 | $104.80 |
| 69 | GRV RCSD PVT MRKG 7 (78011035) | LF | 5 | $37.40 | $45.00 | $38.11 | $145.60 |
| 70 | Raised refl pavt MKR (78100100) | EACH | 10 | $539.00 | $350.00 | $336.31 | $436.80 |
| 71 | Barr wall ref type C (78200011) | EACH | 30 | $30.00 | $9.00 | $8.97 | $7.00 |
| 72 | Raised ref PVT MK rem (78300200) | EACH | 10 | $10.00 | $20.00 | $547.06 | $11.60 |
| 73 | PVT MKG rem WTR blast (78300202) | SF | 40 | $70.00 | $70.00 | $112.10 | $116.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.