IDOT contract 61L82 bid tabulation
Broadview, section 22-00086-00-BR. Let by Illinois DOT on November 7, 2025, Cook, District 01. 5 bids received; low bid $2,582,436 by Dunnet Bay Construction Company.
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 95
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dunnet Bay Construction Company | $2,582,436 | Low |
| 2 | Herlihy Mid-Continent Company | $2,898,784 | +12% |
| 3 | OHLA Central, Inc. | $3,000,000 | +16% |
| 4 | Lorig Construction Company | $3,107,959 | +20% |
| 5 | Rausch Infrastructure, LLC | $3,357,778 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dunnet Bay Construction Company | 2. Herlihy Mid-Continent Company | 3. OHLA Central, Inc. | 4. Lorig Construction Company | 5. Rausch Infrastructure, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Pro SS conn to EX SS (X0322916) | EACH | 2 | $4,315.00 | $2,869.00 | $5,327.72 | $8,200.00 | $3,471.40 |
| 2 | Washout basin (X0326806) | LS | 1 | $1.00 | $1,500.00 | $2,000.00 | $200.00 | $2,855.60 |
| 3 | Rem & RE vid cam & EQ (X0326836) | EACH | 1 | $4,271.24 | $3,779.00 | $3,779.00 | $4,300.00 | $4,572.50 |
| 4 | Remove exist riprap (X2810844) | SY | 89 | $50.00 | $85.00 | $8.39 | $80.00 | $102.90 |
| 5 | Rem conc end sec (X5010523) | EACH | 2 | $2,150.00 | $1,684.00 | $2,696.13 | $3,700.00 | $2,037.60 |
| 6 | Cofferdam typ 1 IS WW (X5021512) | EACH | 2 | $40,000 | $134,500 | $19,717 | $1,000.00 | $142,054 |
| 7 | CH LK fence 4 att STR (X6640525) | LF | 6 | $337.95 | $299.15 | $299.15 | $325.00 | $361.90 |
| 8 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 6 | $3,500.00 | $6,800.00 | $6,075.00 | $4,000.00 | $4,250.00 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $25,000 | $13,250 | $145,909 | $150,000 | $12,342 |
| 10 | Temp info signing (X7200061) | SF | 43 | $30.00 | $30.00 | $30.00 | $38.00 | $19.30 |
| 11 | Maintain lighting sys (X8400102) | EACH | 1 | $4,271.24 | $10,000 | $10,000 | $4,300.00 | $5,168.20 |
| 12 | Stab constr entrance (Z0013797) | SY | 300 | $0.01 | $45.00 | $0.01 | $3.00 | $43.80 |
| 13 | Construction layout (Z0013798) | LS | 1 | $40,000 | $39,750 | $95,000 | $100,000 | $37,026 |
| 14 | Lum sfty CBL assembly (Z0033020) | EACH | 2 | $200.72 | $410.00 | $410.00 | $225.00 | $242.80 |
| 15 | Paint curb (Z0036200) | LF | 192 | $8.50 | $8.50 | $8.50 | $9.00 | $12.60 |
| 16 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 17 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 18 | Earth excavation (20200100) | CY | 295 | $1.00 | $99.25 | $45.00 | $75.00 | $100.00 |
| 19 | Rem & disp uns matl (20201200) | CY | 40 | $100.00 | $120.00 | $100.00 | $90.00 | $200.00 |
| 20 | Channel excavation (20300100) | CY | 315 | $0.01 | $75.00 | $46.00 | $80.00 | $100.00 |
| 21 | Trench backfill (20800150) | CY | 24 | $124.00 | $133.80 | $36.58 | $85.00 | $90.00 |
| 22 | Geotech fab F/GR stab (21001000) | SY | 82 | $6.00 | $10.00 | $9.84 | $4.00 | $11.90 |
| 23 | Topsoil F & P 6 (21101625) | SY | 135 | $25.00 | $25.00 | $24.50 | $32.00 | $30.20 |
| 24 | Seeding CL 2A (25000210) | ACRE | 0.25 | $4,400.00 | $4,400.00 | $3,550.00 | $5,000.00 | $5,324.00 |
| 25 | Seeding CL 4 (25000310) | ACRE | 0.25 | $4,800.00 | $4,800.00 | $3,900.00 | $5,200.00 | $5,808.00 |
| 26 | Seeding CL 5B (25000324) | ACRE | 0.25 | $4,800.00 | $4,800.00 | $9,500.00 | $5,200.00 | $5,808.00 |
| 27 | Wildlife friendly ecb (25100645) | SY | 135 | $7.00 | $7.00 | $4.85 | $7.00 | $8.40 |
| 28 | Temp eros contr seed (28000250) | LB | 3 | $70.00 | $70.00 | $92.00 | $70.00 | $84.70 |
| 29 | Perimeter eros bar (28000400) | LF | 108 | $6.00 | $6.00 | $25.00 | $9.00 | $7.20 |
| 30 | Inlet filters (28000510) | EACH | 3 | $360.00 | $360.00 | $385.00 | $375.00 | $435.60 |
| 31 | Temp eros contr blank (28001100) | SY | 135 | $7.00 | $7.00 | $1.00 | $7.00 | $8.40 |
| 32 | Stone riprap CL A4 (28100107) | SY | 557 | $125.00 | $125.00 | $95.00 | $175.00 | $117.40 |
| 33 | Filter fabric (28200200) | SY | 557 | $6.00 | $2.20 | $15.00 | $3.00 | $17.10 |
| 34 | Agg subgrade improve (30300001) | CY | 81 | $108.00 | $110.00 | $35.83 | $115.00 | $96.60 |
| 35 | Agg subgrade impr 12 (30300112) | SY | 283 | $50.00 | $64.00 | $40.00 | $50.00 | $59.50 |
| 36 | Sub gran mat B 2 (31101180) | SY | 154 | $26.00 | $10.00 | $5.14 | $17.00 | $12.70 |
| 37 | Sub gran mat B 4 (31101200) | SY | 110 | $38.00 | $50.00 | $15.40 | $19.00 | $19.50 |
| 38 | HMA base cse 2 1/4 (35501287) | SY | 246 | $30.71 | $30.71 | $30.71 | $36.90 | $37.10 |
| 39 | Bit matls tack CT (40600290) | LB | 16 | $0.10 | $0.01 | $0.10 | $0.10 | $0.10 |
| 40 | HMA BC IL-19.0 N50 (40603080) | TON | 69 | $198.71 | $198.71 | $198.71 | $210.00 | $240.40 |
| 41 | HMA SC IL-9.5 D N70 (40604062) | TON | 21 | $231.79 | $231.79 | $231.79 | $245.00 | $280.40 |
| 42 | PVT con HMA BR app SL (42000070) | SY | 148 | $129.05 | $129.05 | $129.05 | $135.00 | $156.10 |
| 43 | PCC driveway pavt 8 (42300400) | SY | 33 | $150.00 | $164.00 | $185.85 | $110.00 | $224.80 |
| 44 | PC conc sidewalk 5 (42400200) | SF | 1,022 | $12.00 | $9.50 | $14.34 | $16.00 | $17.30 |
| 45 | Pavement rem (44000100) | SY | 654 | $10.00 | $26.00 | $50.00 | $16.00 | $22.50 |
| 46 | Drive pavement rem (44000200) | SY | 190 | $37.00 | $24.00 | $50.00 | $13.00 | $17.70 |
| 47 | Comb curb gutter rem (44000500) | LF | 345 | $8.00 | $15.00 | $25.00 | $11.00 | $14.90 |
| 48 | Sidewalk rem (44000600) | SF | 1,314 | $2.50 | $3.00 | $5.00 | $3.50 | $4.00 |
| 49 | Rem exist struct (50100100) | EACH | 1 | $651,725 | $220,000 | $600,000 | $700,000 | $417,394 |
| 50 | Structure excavation (50200100) | CY | 185 | $1.00 | $90.00 | $50.15 | $50.00 | $125.00 |
| 51 | Cofferdam excavation (50200300) | CY | 142 | $0.01 | $170.00 | $52.00 | $50.00 | $160.00 |
| 52 | Conc struct (50300225) | CY | 182.70 | $1,250.00 | $1,850.00 | $2,000.00 | $1,500.00 | $2,000.00 |
| 53 | Conc sup-STR (50300255) | CY | 301.30 | $1,250.00 | $1,950.00 | $1,400.00 | $1,800.00 | $1,825.00 |
| 54 | BR deck grooving (50300260) | SY | 572 | $9.60 | $9.70 | $9.31 | $11.00 | $11.20 |
| 55 | Protective coat (50300300) | SY | 851 | $3.00 | $2.70 | $1.36 | $2.00 | $4.40 |
| 56 | Conc supstr app slab (50301350) | CY | 145.10 | $500.00 | $990.00 | $350.00 | $650.00 | $450.00 |
| 57 | Reinf bars, epoxy CTD (50800205) | LB | 169,810 | $1.52 | $1.40 | $2.20 | $1.50 | $1.75 |
| 58 | Alum railing TY L (50900105) | LF | 182 | $215.60 | $198.97 | $198.97 | $205.00 | $240.70 |
| 59 | Fur STL pile HP12X63 (51201610) | LF | 1,288 | $100.00 | $50.00 | $76.00 | $99.00 | $181.60 |
| 60 | Driving piles (51202305) | LF | 1,250 | $0.01 | $10.00 | $0.01 | $1.00 | $1.00 |
| 61 | Test pile ST HP12X63 (51203610) | EACH | 4 | $20,000 | $15,600 | $2,593.95 | $10,000 | $20,000 |
| 62 | Pile shoes (51204650) | EACH | 30 | $135.00 | $107.50 | $1,500.00 | $115.00 | $125.00 |
| 63 | Name plates (51500100) | EACH | 1 | $650.00 | $1,000.00 | $1,456.36 | $800.00 | $847.00 |
| 64 | Temp soil reten systm (52200020) | SF | 460 | $0.01 | $97.00 | $55.00 | $1.00 | $99.60 |
| 65 | Cip RC end sec 30 (54215430) | EACH | 1 | $9,365.00 | $23,669 | $10,128 | $8,500.00 | $19,015 |
| 66 | Conc ES 542001 48 1:2 (54261248) | EACH | 1 | $7,500.00 | $7,635.90 | $13,323 | $11,000 | $9,239.40 |
| 67 | Storm sew CL A 3 30 (550A0730) | LF | 14 | $605.00 | $335.05 | $163.69 | $200.00 | $405.40 |
| 68 | Storm sew CL A 3 48 (550A0780) | LF | 13 | $815.00 | $851.00 | $245.97 | $400.00 | $1,029.70 |
| 69 | Storm sewer rem 30 (55101400) | LF | 16 | $235.00 | $338.30 | $121.88 | $135.00 | $409.30 |
| 70 | Storm sewer rem 48 (55101900) | LF | 23 | $185.00 | $294.80 | $133.05 | $150.00 | $356.70 |
| 71 | Granular backfill STR (58600101) | CY | 90 | $70.50 | $87.81 | $64.57 | $125.00 | $134.40 |
| 72 | Geocomposite wall DR (59100100) | SY | 54 | $27.50 | $29.50 | $19.46 | $42.00 | $37.40 |
| 73 | Conc HDWL for P drain (60100060) | EACH | 2 | $605.00 | $600.00 | $1,752.60 | $700.00 | $865.90 |
| 74 | P undr for struct 4 (60146304) | LF | 138 | $37.00 | $15.00 | $24.31 | $61.00 | $22.60 |
| 75 | P undr for struct SPL 4 (60146305) | LF | 20 | $84.50 | $25.00 | $59.01 | $68.00 | $22.60 |
| 76 | Comb CC&G TB6.12 (60603800) | LF | 209 | $60.00 | $50.00 | $73.33 | $88.00 | $88.70 |
| 77 | Non SPL waste disposl (66900200) | CY | 955 | $42.00 | $72.00 | $30.00 | $90.00 | $118.70 |
| 78 | Soil disposal analy (66900530) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $2,000.00 | $2,395.80 |
| 79 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $3,400.00 | $3,400.00 | $2,500.00 | $3,025.00 |
| 80 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $500.00 | $2,500.00 | $3,025.00 |
| 81 | Reg sub mon (66901006) | CAL DAY | 10 | $700.00 | $1,400.00 | $700.00 | $1,900.00 | $1,203.90 |
| 82 | Mobilization (67100100) | LS | 1 | $154,946 | $184,000 | $180,000 | $160,000 | $195,000 |
| 83 | Remov sign panel T1 (72400310) | SF | 10 | $100.00 | $100.00 | $100.00 | $100.00 | $18.10 |
| 84 | Undrgrd C PVC 1 1/4 (81028330) | LF | 43 | $36.35 | $52.00 | $52.00 | $36.40 | $43.90 |
| 85 | Con at ST 1.25 GS PVC (81100420) | LF | 83 | $82.71 | $114.00 | $114.00 | $85.00 | $100.00 |
| 86 | Jun BX SS as 12X12X6 (81300550) | EACH | 2 | $1,273.67 | $3,250.00 | $3,250.00 | $1,400.00 | $1,541.10 |
| 87 | UD 3#6#8G xlpuse 1.25 (81603051) | LF | 216 | $26.21 | $28.50 | $28.50 | $27.00 | $31.70 |
| 88 | EC C XLP use 1C 8 (81702120) | LF | 150 | $5.58 | $2.85 | $2.85 | $6.00 | $6.70 |
| 89 | EC C XLP use 1C 6 (81702130) | LF | 450 | $5.76 | $3.25 | $3.25 | $5.80 | $6.90 |
| 90 | Lum LED rdwy C (82110003) | EACH | 2 | $722.70 | $1,030.00 | $1,030.00 | $750.00 | $874.40 |
| 91 | LT P A 30MH 12MA (83006500) | EACH | 2 | $4,496.37 | $5,175.00 | $5,175.00 | $4,600.00 | $5,440.60 |
| 92 | Light pole FDN 24D (83600200) | LF | 18 | $341.72 | $492.00 | $492.00 | $350.00 | $413.40 |
| 93 | Rem LT unit salv (84200500) | EACH | 2 | $683.67 | $820.00 | $820.00 | $825.00 | $827.20 |
| 94 | Rem pole FDN (84200804) | EACH | 2 | $974.06 | $984.00 | $984.00 | $1,000.00 | $1,178.60 |
| 95 | Rem elcbl FR con (89502300) | LF | 1,560 | $2.28 | $1.00 | $1.00 | $2.30 | $2.70 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.