OHLA Central, Inc.: IDOT bid record
OHLA Central, Inc. submitted 15 bids on Illinois DOT contracts in the data, from 25 APR 2025 to 31 JUL 2026, and was the low bidder on 4 of them (27%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $211,295,221
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2025 | 5 | 2 | 40% |
| 2026 | 10 | 2 | 20% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 13 | 3 | 23% |
| District 02 | 1 | 1 | 100% |
| District 03 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 15 | 15 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 14 | 14 (100%) | $0.80 | $0.80 |
| Non SPL waste disposl | 66900200 | CY | 15 | 12 (80%) | $41.52 | $92.99 |
| Seeding CL 2A | 25000210 | ACRE | 14 | 11 (79%) | $3,025.00 | $3,331.55 |
| Reg sub mon | 66901006 | CAL DAY | 14 | 10 (71%) | $680.00 | $820.00 |
| Soil disposal analy | 66900530 | EACH | 15 | 9 (60%) | $1,450.00 | $1,470.00 |
| Bit matls tack CT | 40600290 | LB | 14 | 9 (64%) | $0.01 | $0.01 |
| Trench backfill | 20800150 | CY | 14 | 9 (64%) | $37.14 | $55.00 |
| Erosion contr blanket | 25100630 | SY | 10 | 9 (90%) | $1.25 | $1.85 |
| Earth excavation | 20200100 | CY | 15 | 8 (53%) | $45.00 | $48.00 |
| Agg subgrade improve | 30300001 | CY | 13 | 8 (62%) | $50.92 | $55.00 |
| Inlet filters | 28000510 | EACH | 14 | 7 (50%) | $197.50 | $180.20 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lorig Construction Company | 9 | 4 of 9 |
| F. H. Paschen, S.N. Nielsen & Associates LLC | 7 | 4 of 7 |
| Dunnet Bay Construction Company | 6 | 3 of 6 |
| Plote Construction, Inc. | 3 | 1 of 3 |
| Martam Construction Incorporated | 3 | 1 of 3 |
| D. Construction, Inc. | 3 | 3 of 3 |
| Austin Tyler Construction, Inc. | 3 | 2 of 3 |
| Granite Construction Company | 3 | 1 of 3 |
| Rausch Infrastructure, LLC | 3 | 2 of 3 |
| Herlihy Mid-Continent Company | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 61M13 | District 01 | Project Number: Qnyf-462 / /, section 12-00192-04-BR | 2 of 6 | $37,919,789 | +4.0% |
| 12 JUN 2026 | 62L30 | District 01 | Section 2020-142-C&DR | 4 of 6 | $16,574,638 | +19% |
| 12 JUN 2026 | 62R61 | District 01 | Section FAI | 1 of 3 | $43,537,120 | Low, 23% under the second |
| 12 JUN 2026 | 62W99 | District 01 | Section (0404-316-HB) | 5 of 5 | $28,363,291 | +11% |
| 24 APR 2026 | 87899 | District 03 | Project Number: 32Zu-960 / /, section 22-00168-00-RP | 3 of 3 | $46,463,364 | +42% |
| 16 JAN 2026 | 60R94 | District 01 | Section U-1-N | 1 of 6 | $8,643,219 | Low, 6.0% under the second |
| 16 JAN 2026 | 62K62 | District 01 | Section 2019-189-BR | 2 of 5 | $20,836,856 | +7.0% |
| 16 JAN 2026 | 62K64 | District 01 | Section 2019-191-B-R | 4 of 5 | $17,191,164 | +24% |
| 16 JAN 2026 | 62K65 | District 01 | Section 2019-192-B-R | 6 of 7 | $15,786,646 | +18% |
| 16 JAN 2026 | 62U12 | District 01 | Section FAI | 6 of 6 | $13,828,510 | +25% |
| 07 NOV 2025 | 61L82 | District 01 | Broadview, section 22-00086-00-BR | 3 of 5 | $3,000,000 | +16% |
| 19 SEP 2025 | 62R22 | District 01 | Section FAI | 3 of 3 | $108,905,830 | +16% |
| 01 AUG 2025 | 64C24 | District 02 | Section (201-3)R&(4-1,5)R | 1 of 5 | $125,917,852 | Low, 4.0% under the second |
| 13 JUN 2025 | 62T95 | District 01 | Section FAI | 2 of 8 | $8,951,953 | +4.0% |
| 25 APR 2025 | 61G79 | District 01 | Naperville, section 06-00133-00-BR | 1 of 4 | $33,197,030 | Low, 6.0% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.