IDOT contract 62T95 bid tabulation
Section FAI. Let by Illinois DOT on June 13, 2025, Cook, District 01. 8 bids received; low bid $8,580,778 by Lindahl Brothers, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 38
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lindahl Brothers, Inc. | $8,580,778 | Low |
| 2 | OHLA Central, Inc. | $8,951,953 | +4.0% |
| 3 | Plote Construction, Inc. | $9,182,583 | +7.0% |
| 4 | Martam Construction Incorporated | $9,487,904 | +11% |
| 5 | Earthwerks Land Improvement & Development Corp | $9,588,249 | +12% |
| 6 | Curran Contracting Company | $9,734,557 | +13% |
| 7 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | $11,085,209 | +29% |
| 8 | Winninger Excavating | $13,635,576 | +59% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lindahl Brothers, Inc. | 2. OHLA Central, Inc. | 3. Plote Construction, Inc. | 4. Martam Construction Incorporated | 5. Earthwerks Land Improvement & Development Corp | 6. Curran Contracting Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Remov EX flar end sec (X5427602) | EACH | 2 | $1,500.00 | $200.00 | $390.00 | $217.24 | $300.00 | $500.00 |
| 2 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 9 | $5,500.00 | $3,000.00 | $4,500.00 | $5,525.88 | $3,000.00 | $4,000.00 |
| 3 | Traf cont & prot SPL (X7010216) | LS | 1 | $75,000 | $59,000 | $58,000 | $178,157 | $12,000 | $155,000 |
| 4 | TR C-prot expressways (X7011015) | LS | 1 | $12,500 | $1,500.00 | $10,000 | $1,560.00 | $25,000 | $1,500.00 |
| 5 | TR cont surveil expwy (X7013820) | CAL DAY | 267 | $100.00 | $1.00 | $100.00 | $1.04 | $137.50 | $1.00 |
| 6 | RRPM reflector removl (X7830050) | EACH | 28 | $10.00 | $5.00 | $10.00 | $5.20 | $10.00 | $5.00 |
| 7 | RRPM reflector replac (X7830052) | EACH | 28 | $25.00 | $50.00 | $25.00 | $50.00 | $25.00 | $50.00 |
| 8 | Stab constr entrance (Z0013797) | SY | 489 | $30.38 | $0.01 | $25.00 | $28.32 | $30.00 | $55.00 |
| 9 | Construction layout (Z0013798) | LS | 1 | $125,000 | $45,000 | $15,000 | $6,843.34 | $12,000 | $12,000 |
| 10 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 11 | Earth excavation (20200100) | CY | 106,500 | $38.00 | $36.80 | $5.15 | $73.44 | $10.00 | $46.00 |
| 12 | Trench backfill (20800150) | CY | 36 | $60.00 | $15.00 | $125.00 | $67.43 | $60.00 | $72.00 |
| 13 | Seeding CL 2A (25000210) | ACRE | 4 | $3,100.00 | $3,100.00 | $3,100.00 | $3,224.00 | $8,000.00 | $3,100.00 |
| 14 | Nitrogen fert nutr (25000400) | LB | 360 | $3.00 | $3.00 | $3.00 | $3.12 | $1.00 | $3.00 |
| 15 | Phosphorus fert nutr (25000500) | LB | 360 | $3.00 | $3.00 | $3.00 | $3.12 | $1.00 | $3.00 |
| 16 | Potassium fert nutr (25000600) | LB | 360 | $3.00 | $3.00 | $3.00 | $3.12 | $1.00 | $3.00 |
| 17 | Erosion contr blanket (25100630) | SY | 19,268 | $0.95 | $0.20 | $0.95 | $0.99 | $2.25 | $0.95 |
| 18 | Temp ditch checks (28000305) | LF | 60 | $12.00 | $12.00 | $12.00 | $12.48 | $80.00 | $12.00 |
| 19 | Perimeter eros bar (28000400) | LF | 2,402 | $3.30 | $9.65 | $3.30 | $3.43 | $3.00 | $3.30 |
| 20 | Inlet & pipe protect (28000500) | EACH | 3 | $350.00 | $350.00 | $350.00 | $364.00 | $175.00 | $350.00 |
| 21 | Inlet filters (28000510) | EACH | 1 | $225.00 | $225.00 | $225.00 | $234.00 | $175.00 | $225.00 |
| 22 | Aggregate SHLDS B 6 (48101500) | SY | 19 | $168.01 | $52.00 | $28.00 | $193.34 | $20.00 | $32.50 |
| 23 | P cul CL D 2 36 temp (5422D036) | LF | 59 | $150.00 | $115.26 | $160.00 | $183.20 | $60.00 | $82.00 |
| 24 | Metal FL end sec 36" (54262736) | EACH | 2 | $1,800.00 | $750.00 | $1,100.00 | $2,238.81 | $450.00 | $1,650.00 |
| 25 | Non SPL waste disposl (66900200) | CY | 106,500 | $33.25 | $40.00 | $73.50 | $6.88 | $74.00 | $36.00 |
| 26 | Soil disposal analy (66900530) | EACH | 4 | $1,650.00 | $1,310.00 | $1,650.00 | $1,716.00 | $10,000 | $1,650.00 |
| 27 | Reg sub P-const plan (66901001) | LS | 1 | $3,350.00 | $4,300.00 | $3,350.00 | $3,484.00 | $18,000 | $3,350.00 |
| 28 | Reg sub F con report (66901003) | LS | 1 | $1,200.00 | $4,700.00 | $1,200.00 | $1,248.00 | $8,000.00 | $1,200.00 |
| 29 | Reg sub mon (66901006) | CAL DAY | 212 | $500.00 | $0.01 | $0.01 | $1.00 | $100.00 | $675.00 |
| 30 | Mobilization (67100100) | LS | 1 | $475,000 | $537,000 | $538,000 | $569,274 | $280,000 | $525,000 |
| 31 | Changeable message SN (70107025) | CAL DAY | 267 | $25.00 | $25.00 | $25.00 | $26.00 | $30.00 | $25.00 |
| 32 | SHRT TRM pavt MK rem (70300150) | SF | 785 | $1.55 | $0.40 | $1.55 | $0.42 | $20.00 | $1.15 |
| 33 | Temp PVT MK L4 T4 tape (70307120) | LF | 873 | $1.55 | $1.25 | $1.55 | $1.30 | $1.50 | $1.25 |
| 34 | Temp PVT MK L8 T4 tape (70307140) | LF | 740 | $1.55 | $2.40 | $3.15 | $2.50 | $2.75 | $2.40 |
| 35 | Polyurea PM T1 LN 4 (78008210) | LF | 874 | $4.05 | $4.24 | $4.05 | $4.41 | $4.25 | $4.24 |
| 36 | Polyurea PM T1 LN 5 (78008220) | LF | 261 | $4.85 | $5.30 | $4.85 | $5.51 | $5.50 | $5.30 |
| 37 | Polyurea PM T1 LN 8 (78008240) | LF | 682 | $7.85 | $8.50 | $7.85 | $8.84 | $8.50 | $8.50 |
| 38 | PVT MKG rem WTR blast (78300202) | SF | 812 | $4.00 | $5.00 | $4.00 | $5.20 | $5.50 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.