IDOT contract 60R94 bid tabulation

Section U-1-N. Let by Illinois DOT on January 16, 2026, Cook, District 01. 6 bids received; low bid $8,643,219 by OHLA Central, Inc..

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
151
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1OHLA Central, Inc.$8,643,219Low
2K-Five Construction Corporation$9,154,857+6.0%
3Plote Construction, Inc.$9,746,876+13%
4Austin Tyler Construction, Inc.$9,884,125+14%
5Lorig Construction Company$10,801,328+25%
6Martam Construction Incorporated$17,014,117+97%
IDOT contract 60R94: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. OHLA Central, Inc.2. K-Five Construction Corporation3. Plote Construction, Inc.4. Austin Tyler Construction, Inc.5. Lorig Construction Company6. Martam Construction Incorporated
1V-parthen quin EM 1Q (E20210Q1)EACH160$35.00$36.25$35.00$35.00$35.00$40.25
2Weed cont broadlf TRF (K0029618)GAL2.50$900.00$932.21$900.00$900.00$900.00$1,035.00
3Weed cont N sel/N res (K0029632)GAL2.50$900.00$932.21$900.00$900.00$900.00$1,035.00
4EM veh P S LSC 20 3C (X0324085)LF278$1.80$1.88$1.80$2.81$2.20$2.07
5Weed cont basal TRTMT (X0325222)GAL30$840.00$870.06$900.00$900.00$900.00$1,035.00
6Serv instl GR MT MTR (X1400150)EACH1$5,243.00$5,443.89$5,243.00$4,300.00$5,625.00$6,029.45
7Stump removal acres (X2010402)ACRE10$1,500.00$1,553.69$1,500.00$1,500.00$1,500.00$1,725.00
8Mowing SPL (X2503110)ACRE5$450.00$466.11$500.00$500.00$500.00$575.00
9Stone riprap CL A4 SP (X2810108)SY70$37.60$165.73$114.00$72.00$195.00$114.05
10Agg column GRND imprv (X5020100)LS1$650,000$1,301,719$685,000$450,000$600,000$1,573,453
11Cofferdam typ 1 IS WW (X5021512)EACH1$105.00$25,000$10,000$35,000$1,000.00$86,507
12Box culvert removal (X5400005)LF226$250.00$230.91$230.00$94.00$675.00$249.41
13FR & lids adjust SPL (X6030310)EACH1$1,128.21$1,139.37$1,100.00$1,700.00$1,300.00$858.33
14Engrs FLD ofc TY A D1 (X6700407)CAL MO14$4,500.00$3,000.00$4,500.00$3,400.00$3,900.00$5,663.16
15Traf cont & prot SPL (X7010216)LS1$600,000$30,000$45,000$30,000$1,350,000$462,782
16Temp info signing (X7200061)SF22$45.00$12.43$12.00$20.00$15.00$51.75
17Fac T super P cab SP (X8570233)EACH1$24,860$25,765$24,860$27,000$25,000$28,589
18Uninter PS cab SPL (X8620250)EACH1$5,537.00$5,741.64$5,537.00$8,325.00$5,800.00$6,367.55
19Video veh det sys (X8891001)EACH1$12,847$13,310$12,847$15,000$13,000$14,774
20Temp TR signal timing (X8900104)EACH8$375.00$391.96$375.00$385.00$500.00$431.25
21Construction layout (Z0013798)LS1$150,000$65,041$221,000$120,000$425,000$56,350
22Rock fill (Z0054400)CY461$75.00$59.24$70.00$85.00$110.00$139.26
23Trainees (Z0076600)HR1,000$0.80$0.80$0.80$0.80$0.80$0.80
24Trainees TPG (Z0076604)HR1,000$15.00$15.00$15.00$15.00$15.00$15.00
25Tree remov 6-15 (20100110)UNIT100$75.00$22.27$40.00$40.00$40.00$46.00
26Tree remov over 15 (20100210)UNIT100$75.00$23.82$50.00$50.00$50.00$57.50
27Temporary fence (20101000)LF460$3.50$3.63$6.00$6.00$6.00$6.90
28Tree trunk protection (20101100)EACH10$125.00$103.58$125.00$125.00$125.00$143.75
29Tree root pruning (20101200)EACH10$250.00$108.76$125.00$125.00$125.00$143.75
30Tree prun 1-10 (20101300)EACH10$150.00$46.61$125.00$125.00$125.00$143.75
31Tree prun over 10 (20101350)EACH10$175.00$93.22$175.00$175.00$175.00$201.25
32Nitrogen fert nutr (20101400)LB360$3.00$3.00$3.00$3.00$3.00$3.45
33Potassium fert nutr (20101600)LB360$3.00$3.00$3.00$3.00$3.00$3.45
34Supple watering (20101700)UNIT10$100.00$100.00$50.00$50.00$50.00$57.50
35Earth excavation (20200100)CY4,059$10.00$19.90$25.00$45.00$16.00$52.78
36Rem & disp uns matl (20201200)CY2,883$50.00$49.86$48.00$54.00$45.00$61.37
37Furnished excavation (20400800)CY40,204$28.00$18.90$26.00$30.00$20.00$40.23
38Porous gran embank (20700220)CY2,833$55.00$49.79$65.00$50.00$62.00$60.57
39Trench backfill (20800150)CY4,551$25.00$50.95$50.95$85.00$50.00$107.38
40Geotech fab F/GR stab (21001000)SY100$8.65$10.00$10.00$5.00$15.00$31.29
41Topsoil exc & plac (21101505)CY1,345$60.00$35.40$35.00$38.00$25.00$40.19
42Topsoil F & P 4 (21101615)SY12,918$1.00$6.21$5.40$5.40$5.50$6.21
43Seeding CL 1B (25000115)ACRE2$3,800.00$3,936.00$2,200.00$2,200.00$2,200.00$2,530.00
44Seeding CL 2A (25000210)ACRE2$3,500.00$3,625.27$2,300.00$2,300.00$2,300.00$2,645.00
45Seeding CL 4A (25000312)ACRE1$3,500.00$3,625.27$2,500.00$2,500.00$2,500.00$2,875.00
46Mulch method 3 (25100125)ACRE3$3,300.00$3,418.11$2,800.00$2,800.00$2,800.00$3,220.00
47Wildlife friendly ecb (25100645)SY9,680$1.40$1.45$1.30$1.30$1.30$1.50
48Temp eros contr seed (28000250)LB450$4.00$4.14$1.00$1.00$1.00$1.15
49Temp ditch checks (28000305)LF840$10.00$10.36$9.00$9.00$9.00$10.35
50Perimeter eros bar (28000400)LF6,700$10.00$3.11$2.75$2.75$3.00$3.16
51Inlet filters (28000510)EACH24$200.00$172.46$150.00$150.00$150.00$172.50
52Stone riprap CL A3 (28100105)SY56$39.90$154.02$73.00$50.00$116.00$93.67
53Stone riprap CL A4 (28100107)SY140$58.68$165.73$80.00$53.00$165.00$127.32
54Filter fabric (28200200)SY70$6.88$10.00$17.00$4.00$5.00$3.96
55Agg subgrade improve (30300001)CY2,663$60.00$47.49$49.00$52.00$55.00$81.31
56Agg subgrade impr 12 (30300112)SY15,446$25.00$18.42$15.00$14.75$16.00$27.14
57Bit matls PR CT (40600275)LB34,753$0.01$0.01$0.01$0.01$0.01$0.01
58Bit matls tack CT (40600290)LB5,362$0.01$0.01$0.01$0.01$0.01$0.01
59Long joint sealant (40600370)LF6,487$6.12$3.62$3.60$3.40$5.75$6.81
60Mix CR JTS flangewys (40600400)TON7$816.33$500.00$100.00$350.00$300.00$369.28
61HMA surf rem butt JT (40600982)SY160$32.65$40.30$65.00$0.01$40.00$49.24
62HMA BC IL-19.0 N70 (40603085)TON179$147.96$90.00$165.00$198.00$90.00$110.78
63HMA SC IL-9.5 D N70 (40604062)TON147$107.14$125.24$120.00$95.00$140.00$164.99
64HMA pavt FD 8 (40701841)SY2,008$44.90$44.66$56.00$39.00$55.00$59.11
65HMA pavt FD 10 (40701881)SY8,592$57.65$48.57$70.00$53.00$57.00$64.25
66Pavement rem (44000100)SY11,088$35.00$4.90$25.00$7.00$18.00$33.52
67HMA shoulders 10 (48203037)SY2,150$56.12$44.48$68.00$50.00$54.00$58.86
68Pipe culvert remov (50105220)LF302$30.00$30.00$15.00$50.00$30.00$35.39
69Rem/disp uns matl-STR (50200450)CY590$75.00$47.00$55.00$54.00$75.00$185.72
70Conc sup-STR (50300255)CY905.20$650.00$1,150.00$1,050.00$770.00$800.00$2,868.72
71Protective coat (50300300)SY2,077$1.36$1.00$0.01$1.70$1.55$3.18
72Reinforcement bars (50800105)LB45,830$1.39$1.75$2.25$1.90$1.70$1.83
73Reinf bars, epoxy CTD (50800205)LB129,860$2.00$1.90$2.50$3.60$1.85$1.93
74Name plates (51500100)EACH2$963.37$983.93$1,000.00$700.00$1,200.00$1,329.05
75Mech ST earth ret WL (52200500)SF19,230$29.00$70.00$90.00$110.00$92.00$169.55
76Conc box cul (54003000)CY216$1,400.00$1,708.93$1,185.00$2,600.00$1,950.00$4,031.12
77PRC flar end sec 12 (54213657)EACH3$1,153.85$1,165.26$1,125.00$1,700.00$1,125.00$1,399.68
78PRC flar end sec 15 (54213660)EACH2$1,210.26$1,222.23$1,180.00$1,800.00$1,200.00$1,450.04
79PRC flar end sec 27 (54213672)EACH1$1,743.59$1,760.84$1,700.00$3,000.00$1,800.00$1,921.95
80Cip RC end sec 15 (54215415)EACH1$1,897.44$1,916.21$1,850.00$11,500$1,900.00$9,276.87
81Cip RC end sec 30 (54215430)EACH1$3,523.08$3,557.94$3,435.00$12,500$3,600.00$16,221
82FL inlt BX med 542546 (54244405)EACH6$6,400.00$6,463.33$6,240.00$7,800.00$6,300.00$8,053.32
83Storm sew CL A 2 12 (550A0340)LF2,885$49.79$50.29$48.55$61.00$50.00$94.73
84Storm sew CL A 2 15 (550A0360)LF745$55.95$56.50$54.55$70.00$56.00$99.02
85Storm sew CL A 2 18 (550A0380)LF24$81.85$82.66$79.80$84.00$81.00$138.03
86Storm sew CL A 3 27 (550A0720)LF186$142.56$143.97$139.00$119.00$142.00$280.04
87Storm sew CL A 3 30 (550A0730)LF123$146.51$147.96$142.85$123.00$145.00$284.22
88Storm sewer rem 12 (55100500)LF150$25.18$25.43$24.55$36.00$26.00$13.07
89Storm sewer rem 15 (55100700)LF69$25.18$25.43$24.55$36.00$26.00$14.10
90Conc HDWL for P drain (60100060)EACH8$617.69$630.04$602.25$500.00$625.00$469.90
91Pipe underdr T 2 4 (60108204)LF5,623$23.64$23.87$23.05$17.25$23.50$18.62
92CB TA 4 dia T8G (60200805)EACH12$3,030.62$3,060.61$2,954.85$2,900.00$3,000.00$5,273.25
93CB TA 4 dia T24F&G (60201340)EACH21$3,467.69$3,502.01$3,381.00$3,000.00$3,400.00$5,492.19
94Man TA 5 dia T1F OL (60221000)EACH1$5,938.46$5,997.23$5,790.00$4,700.00$5,900.00$6,930.23
95Man TA 5 dia T1F CL (60221100)EACH9$4,789.74$4,837.14$4,670.00$4,700.00$4,800.00$6,930.23
96Man TA 6 dia T1F CL (60223800)EACH1$12,000$12,119$11,700$10,000$12,000$13,423
97Man TA 6 dia T8G (60224005)EACH1$12,000$12,119$11,700$10,000$12,000$13,276
98Remov catch bas (60500050)EACH2$1,076.93$1,087.58$1,050.00$850.00$1,100.00$964.87
99Class SI conc outlet (60600095)CY2$1,100.00$1,035.79$1,700.00$1,100.00$1,500.00$1,290.52
100Comb CC&G TY B-6.24 (60605000)LF1,875$39.25$39.88$36.00$29.00$62.00$65.90
101SPBGR TY B 6FT posts (63000007)LF330$53.26$55.16$53.26$60.00$55.00$61.25
102Traf bar term T6 (63100085)EACH2$3,984.18$4,141.38$3,984.18$4,000.00$4,000.00$4,581.81
103TR bar TRM T1 SPL tan (63100167)EACH2$3,867.38$3,987.44$3,867.38$3,900.00$4,000.00$4,447.49
104Non SPL waste disposl (66900200)CY200$58.33$85.00$90.00$92.00$150.00$87.99
105Soil disposal analy (66900530)EACH2$1,450.00$1,359.99$1,450.00$1,000.00$1,500.00$1,667.50
106Reg sub P-const plan (66901001)LS1$3,100.00$3,243.06$3,100.00$4,000.00$3,100.00$3,565.00
107Reg sub F con report (66901003)LS1$1,200.00$1,255.38$1,200.00$500.00$1,200.00$1,380.00
108Reg sub mon (66901006)CAL DAY10$1,000.00$711.38$950.00$815.00$2,500.00$782.00
109Mobilization (67100100)LS1$518,593$550,000$580,000$550,000$600,000$1,020,847
110Changeable message SN (70107025)CAL DAY100$75.00$27.96$27.00$30.00$27.00$46.00
111Short term pavt mking (70300100)LF1,952$2.50$0.01$1.00$1.50$1.50$2.30
112SHRT TRM pavt MK rem (70300150)SF651$2.50$0.01$1.00$2.50$1.50$2.46
113Sign panel T1 (72000100)SF12$50.00$26.98$26.00$120.00$26.00$170.66
114Sign panel T2 (72000200)SF14$85.00$31.18$30.00$135.00$30.00$217.47
115Metal post TY B (72900200)LF48$30.00$17.53$17.00$20.00$17.00$34.50
116THPL PVT MK LTR & sym (78000100)SF291$6.00$6.50$9.00$5.00$6.00$6.90
117THPL PVT MK line 4 (78000200)LF3,904$1.00$1.00$1.10$1.45$0.75$1.15
118THPL PVT MK line 6 (78000400)LF1,343$1.50$1.50$1.65$1.80$1.20$1.73
119THPL PVT MK line 12 (78000600)LF150$3.00$3.00$4.50$3.80$2.50$3.45
120THPL PVT MK line 24 (78000650)LF108$6.00$6.50$9.00$5.00$5.50$6.90
121Raised refl pavt MKR (78100100)EACH83$68.27$65.00$68.95$72.00$65.00$78.51
122Undrgrd C galvs 2 (81028200)LF1,100$31.70$32.88$31.70$27.00$33.00$36.46
123Undrgrd C galvs 3 (81028220)LF30$98.00$102.07$98.00$54.00$115.00$112.70
124Undrgrd C galvs 4 (81028240)LF411$86.00$89.48$86.00$58.00$98.00$98.90
125Handhole (81400100)EACH1$4,975.00$5,152.86$4,975.00$4,100.00$5,000.00$5,721.25
126HD handhole (81400200)EACH4$4,705.00$4,868.22$4,705.00$4,800.00$4,750.00$5,410.75
127DBL handhole (81400300)EACH1$8,678.00$8,988.11$8,678.00$7,400.00$8,800.00$9,979.70
128Elcbl C signal 14 3C (87301225)LF278$2.10$2.17$2.10$3.14$2.00$2.42
129Elcbl C signal 14 5C (87301245)LF1,044$2.80$2.91$2.80$3.54$3.00$3.22
130Elcbl C signal 14 7C (87301255)LF913$3.00$3.11$3.00$3.95$3.20$3.45
131Elcbl C lead 14 1PR (87301305)LF866$2.10$2.17$2.10$3.13$2.00$2.42
132Elcbl C serv 6 2C (87301805)LF574$4.65$4.83$4.65$6.12$4.90$5.35
133Elcbl C egrdc 6 1C (87301900)LF896$2.45$2.55$2.45$4.70$2.80$2.82
134TS post galvs 16 (87502500)EACH1$2,677.00$2,779.39$2,677.00$2,900.00$2,900.00$3,078.55
135S maa & P 34 (87700210)EACH1$16,200$16,780$16,200$16,250$16,400$18,630
136S maa & P 54 (87700310)EACH1$23,550$24,419$23,550$22,100$23,600$27,083
137S maa & P 56 (87700330)EACH1$27,162$28,148$27,162$26,000$27,250$31,236
138Conc FDN TY A (87800100)LF8$495.00$514.27$495.00$350.00$500.00$569.25
139Conc FDN TY C (87800150)LF4$2,025.00$2,099.55$2,025.00$1,365.00$2,050.00$2,328.75
140Conc FDN TY E 30D (87800400)LF13.50$364.00$377.03$364.00$450.00$375.00$418.60
141Conc FDN TY E 36D (87800415)LF15$567.00$587.29$567.00$495.00$575.00$652.05
142Conc FDN TY E 42D (87800420)LF21$934.00$967.43$934.00$915.00$950.00$1,074.10
143SH LED 1F 3S mam (88030020)EACH4$1,189.00$1,232.59$1,189.00$1,400.00$1,200.00$1,367.35
144SH LED 1F 3S BM (88030050)EACH4$1,004.00$1,040.97$1,004.00$1,200.00$1,025.00$1,154.60
145SH LED 1F 5S BM (88030100)EACH2$1,466.00$1,519.50$1,466.00$1,600.00$1,500.00$1,685.90
146SH LED 1F 5S mam (88030110)EACH2$1,667.00$1,726.66$1,667.00$1,800.00$1,700.00$1,917.05
147TS backplate L F plas (88200410)EACH6$256.00$265.16$256.00$290.00$275.00$294.40
148Inductive loop detect (88500100)EACH4$245.00$253.77$245.00$161.00$250.00$281.75
149Det loop T1 (88600100)LF202$44.25$45.96$44.25$39.25$50.00$50.89
150Light detector (88700200)EACH2$1,640.00$1,698.75$1,640.00$1,700.00$1,700.00$1,886.00
151Light detector amp (88700300)EACH1$2,550.00$2,641.43$2,550.00$5,400.00$2,600.00$2,932.50
IDOT contract 60R94: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy