IDOT contract 62Y26 bid tabulation
Section (143VB-R-1(90))BR. Let by Illinois DOT on February 27, 2026, Will, District 01. 7 bids received; low bid $1,191,152 by Iroquois Paving Corporation.
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 62
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Iroquois Paving Corporation | $1,191,152 | Low |
| 2 | D. Construction, Inc. | $1,237,000 | +4.0% |
| 3 | Areatha Construction Co., Inc. | $1,320,397 | +11% |
| 4 | Rausch Infrastructure, LLC | $1,349,446 | +13% |
| 5 | Lorig Construction Company | $1,397,592 | +17% |
| 6 | MYS, Incorporated | $1,494,140 | +25% |
| 7 | Martam Construction Incorporated | $1,541,563 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Iroquois Paving Corporation | 2. D. Construction, Inc. | 3. Areatha Construction Co., Inc. | 4. Rausch Infrastructure, LLC | 5. Lorig Construction Company | 6. MYS, Incorporated |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Acrylic coating (X0325748) | SY | 13 | $124.50 | $473.00 | $75.00 | $88.00 | $150.00 | $105.31 |
| 2 | Fiber wrap (X0325749) | SF | 119 | $233.00 | $92.40 | $185.00 | $217.00 | $165.00 | $171.83 |
| 3 | Selective clearing (X2010516) | UNIT | 1 | $8,300.00 | $3,553.00 | $3,230.00 | $9,000.00 | $3,500.00 | $9,422.92 |
| 4 | BR deck grooving long (X5030250) | SY | 1,659 | $9.65 | $5.91 | $5.40 | $6.00 | $6.50 | $7.15 |
| 5 | Clean/paint bearings (X5060700) | EACH | 16 | $1,650.00 | $2,090.00 | $1,563.00 | $1,600.00 | $1,600.00 | $1,732.15 |
| 6 | FR & lids adjust SPL (X6030310) | EACH | 2 | $1,525.00 | $1,000.00 | $1,000.00 | $1,400.00 | $2,800.00 | $562.12 |
| 7 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $0.01 | $5,000.00 | $2,500.00 | $5,500.00 | $3,500.00 | $3,551.49 |
| 8 | Traf cont & prot SPL (X7010216) | LS | 1 | $15,250 | $23,500 | $29,500 | $49,000 | $145,000 | $46,385 |
| 9 | Temp info signing (X7200061) | SF | 169 | $15.55 | $30.00 | $15.00 | $17.00 | $15.00 | $16.63 |
| 10 | RRPM reflector removl (X7830050) | EACH | 449 | $8.50 | $10.00 | $8.00 | $11.00 | $8.00 | $8.87 |
| 11 | RRPM reflector replac (X7830052) | EACH | 449 | $21.00 | $16.50 | $10.00 | $14.00 | $10.00 | $11.09 |
| 12 | Appr slab repair (PD) (Z0001800) | SY | 2 | $1,500.00 | $1,250.00 | $1,884.35 | $5,000.00 | $2,000.00 | $1,773.73 |
| 13 | Construction layout (Z0013798) | LS | 1 | $11,500 | $10,000 | $6,000.00 | $16,000 | $5,000.00 | $1,662.87 |
| 14 | Drainage STR cleaned (Z0018500) | EACH | 2 | $1,000.00 | $500.00 | $626.00 | $1,700.00 | $750.00 | $554.29 |
| 15 | Diamond grind BR sec (Z0029090) | SY | 2,042 | $12.60 | $7.62 | $9.30 | $8.00 | $8.00 | $11.09 |
| 16 | P P conc I-BM repair (Z0043800) | SF | 18 | $285.00 | $564.30 | $300.00 | $352.00 | $450.00 | $221.72 |
| 17 | RR prot liability ins (Z0048665) | LS | 1 | $0.01 | $5,500.00 | $15,198 | $20,000 | $8,000.00 | $6,446.38 |
| 18 | Inlet filters (28000510) | EACH | 2 | $0.01 | $250.00 | $400.00 | $323.00 | $450.00 | $485.16 |
| 19 | Bit matls tack CT (40600290) | LB | 382 | $0.01 | $0.01 | $0.10 | $0.10 | $0.10 | $0.11 |
| 20 | Long joint sealant (40600370) | LF | 591 | $15.00 | $17.58 | $12.00 | $14.00 | $12.00 | $13.30 |
| 21 | HMA surf rem butt JT (40600982) | SY | 432 | $25.00 | $35.00 | $15.00 | $17.00 | $25.00 | $16.63 |
| 22 | HMA SC IL-9.5 D N70 (40604062) | TON | 84 | $300.00 | $200.00 | $325.00 | $381.00 | $400.00 | $360.29 |
| 23 | Welded wire reinf (42000060) | SY | 81 | $12.00 | $50.00 | $36.60 | $29.00 | $30.00 | $33.74 |
| 24 | Paved ditch removal (44004000) | LF | 80 | $18.00 | $35.00 | $81.45 | $114.00 | $69.00 | $133.85 |
| 25 | CL B patch T4 17 (44201053) | SY | 81 | $275.00 | $400.00 | $584.85 | $491.00 | $700.00 | $486.73 |
| 26 | Dowel bars 1 1/2 (44201299) | EACH | 154 | $60.00 | $22.50 | $32.25 | $35.00 | $60.00 | $56.33 |
| 27 | Saw cuts (44213200) | LF | 367 | $4.40 | $4.50 | $7.00 | $6.00 | $7.50 | $1.88 |
| 28 | Conc rem (50102400) | CY | 23.80 | $2,568.68 | $2,750.00 | $2,135.90 | $2,200.00 | $3,000.00 | $2,438.87 |
| 29 | Protective shield (50157300) | SY | 609 | $90.00 | $90.00 | $86.00 | $97.00 | $20.00 | $102.14 |
| 30 | Conc sup-STR (50300255) | CY | 22.50 | $2,950.00 | $3,000.00 | $3,408.85 | $3,600.00 | $3,300.00 | $3,658.30 |
| 31 | Protective coat (50300300) | SY | 2,202 | $1.75 | $2.00 | $2.85 | $6.00 | $2.25 | $2.92 |
| 32 | Conc supstr app slab (50301350) | CY | 3.40 | $6,000.00 | $8,500.00 | $7,725.70 | $6,000.00 | $5,900.00 | $1,979.42 |
| 33 | F & E struct steel (50500405) | LB | 69 | $285.00 | $135.00 | $72.35 | $160.00 | $65.00 | $700.34 |
| 34 | Reinf bars, epoxy CTD (50800205) | LB | 3,010 | $3.05 | $5.00 | $3.60 | $3.00 | $4.00 | $3.16 |
| 35 | Bar splicers (50800515) | EACH | 12 | $38.95 | $45.00 | $56.40 | $166.00 | $80.00 | $41.84 |
| 36 | Pref JT strip seal (52000110) | LF | 186 | $310.00 | $290.00 | $428.80 | $305.00 | $275.00 | $272.84 |
| 37 | Anchor bolts 1 (52100520) | EACH | 3 | $273.50 | $150.00 | $304.45 | $129.00 | $175.00 | $236.28 |
| 38 | Deck slab rep (FD-T2) (53016002) | SY | 19 | $2,950.00 | $850.00 | $1,928.85 | $2,100.00 | $2,600.00 | $1,219.44 |
| 39 | BR deck scar 3/4 (53101002) | SY | 2,178 | $51.00 | $55.00 | $63.40 | $50.00 | $60.00 | $46.11 |
| 40 | BR DK LTX C oly 2 3/4 (53101410) | SY | 2,158 | $143.00 | $118.00 | $131.95 | $100.00 | $119.00 | $224.12 |
| 41 | STR rep con DP = < 5 (53212754) | SF | 53 | $250.00 | $225.00 | $250.00 | $293.00 | $700.00 | $304.86 |
| 42 | Concrete sealer (58700300) | SF | 369 | $11.25 | $2.50 | $10.85 | $6.00 | $11.00 | $12.02 |
| 43 | Paved ditch TA-15 (60615400) | LF | 80 | $115.00 | $200.00 | $193.75 | $111.00 | $200.00 | $113.49 |
| 44 | SPBGR TY A 6FT posts (63000001) | LF | 37.50 | $66.35 | $96.18 | $87.45 | $102.00 | $55.00 | $96.93 |
| 45 | Guardrail remov (63200310) | LF | 37.50 | $12.00 | $9.63 | $8.75 | $10.00 | $28.00 | $9.70 |
| 46 | Mobilization (67100100) | LS | 1 | $70,500 | $72,000 | $80,255 | $80,000 | $77,000 | $53,191 |
| 47 | Changeable message SN (70107025) | CAL DAY | 56 | $31.10 | $100.00 | $40.00 | $35.00 | $45.00 | $44.34 |
| 48 | SHRT TRM pavt MK rem (70300150) | SF | 15,360 | $0.01 | $0.50 | $0.20 | $0.70 | $0.21 | $0.23 |
| 49 | Temp PVT MK line 4 - paint (70300221) | LF | 824 | $0.01 | $0.25 | $2.00 | $0.50 | $2.00 | $2.22 |
| 50 | Temp PVT MK line 6 - paint (70300241) | LF | 825 | $0.01 | $0.33 | $2.25 | $0.80 | $2.25 | $2.49 |
| 51 | Temp PVT MK L4 T4 tape (70307120) | LF | 41,148 | $0.01 | $1.17 | $1.30 | $1.40 | $1.30 | $1.44 |
| 52 | Temp conc barrier (70400100) | LF | 825 | $36.50 | $30.00 | $39.85 | $59.00 | $29.00 | $36.03 |
| 53 | Rel temp conc barrier (70400200) | LF | 700 | $4.75 | $15.00 | $10.10 | $10.00 | $6.00 | $16.07 |
| 54 | Imp attn temp NRD TL3 (70600250) | EACH | 2 | $3,940.00 | $6,500.00 | $4,200.00 | $4,465.00 | $4,400.00 | $2,771.44 |
| 55 | Imp attn rel NRD TL3 (70600350) | EACH | 2 | $515.00 | $2,500.00 | $1,200.00 | $587.00 | $1,200.00 | $1,108.58 |
| 56 | THPL PVT MK line 4 (78000200) | LF | 9,702 | $0.80 | $0.94 | $1.00 | $0.90 | $1.00 | $1.09 |
| 57 | Pref PL PM TD STD L 7 (78004635) | LF | 190 | $10.35 | $13.20 | $13.90 | $29.30 | $14.00 | $15.41 |
| 58 | Mod ureth PM line 4 (78009004) | LF | 1,520 | $2.60 | $3.08 | $5.25 | $4.10 | $5.25 | $5.82 |
| 59 | GRV RCSD PVT MRKG 8 (78011040) | LF | 190 | $5.20 | $9.90 | $10.75 | $19.90 | $11.00 | $11.92 |
| 60 | Raised refl pavt MKR (78100100) | EACH | 12 | $223.00 | $236.50 | $300.00 | $499.00 | $300.00 | $332.57 |
| 61 | Grdrail ref type A (78200005) | EACH | 8 | $25.90 | $16.50 | $15.00 | $17.60 | $15.00 | $16.63 |
| 62 | PVT MKG rem WTR blast (78300202) | SF | 5,016 | $3.35 | $1.32 | $1.30 | $3.70 | $1.30 | $1.44 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.