IDOT contract 62T31 bid tabulation
Section FAP. Let by Illinois DOT on March 7, 2025, Dupage, District 01. 5 bids received; low bid $1,159,146 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 66
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $1,159,146 | Low |
| 2 | Martam Construction Incorporated | $1,350,431 | +17% |
| 3 | Areatha Construction Co., Inc. | $1,387,796 | +20% |
| 4 | Rausch Infrastructure, LLC | $1,689,561 | +46% |
| 5 | Lorig Construction Company | $1,731,652 | +49% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Martam Construction Incorporated | 3. Areatha Construction Co., Inc. | 4. Rausch Infrastructure, LLC | 5. Lorig Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | CC&G RMVL repl > 10FT (X4400503) | LF | 274 | $50.00 | $63.00 | $67.00 | $118.00 | $180.00 |
| 2 | BR deck grooving long (X5030250) | SY | 1,283 | $6.99 | $8.80 | $7.60 | $8.00 | $8.00 |
| 3 | GDRL post repair (X6330801) | EACH | 1 | $484.00 | $500.00 | $440.00 | $345.00 | $500.00 |
| 4 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $6,000.00 | $3,200.00 | $2,500.00 | $6,000.00 | $2,800.00 |
| 5 | Traf cont & prot SPL (X7010216) | LS | 1 | $71,680 | $125,500 | $19,350 | $70,000 | $270,000 |
| 6 | RRPM reflector removl (X7830050) | EACH | 154 | $10.00 | $20.00 | $20.00 | $11.00 | $12.00 |
| 7 | RRPM reflector replac (X7830052) | EACH | 154 | $17.60 | $20.00 | $15.00 | $17.00 | $20.00 |
| 8 | Appr slab repair (FD) (Z0001700) | SY | 16 | $1,000.00 | $1,100.00 | $1,114.05 | $2,300.00 | $1,350.00 |
| 9 | BR DK LTX C oly 2 3/4 (Z0006016) | SY | 1,871 | $120.00 | $128.00 | $150.00 | $175.00 | $172.00 |
| 10 | BR deck scar 3/4 (Z0012130) | SY | 1,435 | $60.00 | $63.00 | $80.95 | $71.00 | $68.00 |
| 11 | BR deck scar 2 1/4 (Z0012142) | SY | 449 | $60.00 | $63.00 | $86.45 | $134.00 | $92.00 |
| 12 | STR rep con DP = < 5 (Z0012754) | SF | 127 | $200.00 | $195.00 | $185.65 | $202.00 | $350.00 |
| 13 | Drainage scuppers adj (Z0018051) | EACH | 6 | $1,000.00 | $1,400.00 | $950.10 | $2,000.00 | $900.00 |
| 14 | Diamond grind BR sec (Z0029090) | SY | 1,871 | $7.12 | $8.00 | $10.80 | $8.00 | $7.50 |
| 15 | Temp info signing (Z0030850) | SF | 72 | $30.00 | $15.00 | $18.00 | $13.00 | $22.00 |
| 16 | Polymer concrete (Z0041895) | CF | 25 | $950.00 | $1,200.00 | $1,950.35 | $2,100.00 | $2,600.00 |
| 17 | Slope wall repair (Z0065700) | SY | 2 | $2,000.00 | $1,850.00 | $2,631.35 | $1,886.00 | $1,175.00 |
| 18 | Temp TR signal timing (Z0073510) | EACH | 1 | $880.00 | $1,500.00 | $800.00 | $922.00 | $800.00 |
| 19 | Earth excavation (20200100) | CY | 106 | $50.00 | $83.00 | $28.20 | $149.00 | $81.00 |
| 20 | Stone riprap CL A4 (28100107) | SY | 578 | $75.00 | $85.00 | $128.85 | $147.00 | $215.00 |
| 21 | Filter fabric (28200200) | SY | 580 | $10.00 | $5.00 | $3.75 | $14.00 | $6.00 |
| 22 | Bit matls tack CT (40600290) | LB | 115 | $0.01 | $1.00 | $3.00 | $0.12 | $0.01 |
| 23 | HMA surf rem butt JT (40600982) | SY | 580 | $0.01 | $22.00 | $13.00 | $23.00 | $21.00 |
| 24 | P HMA SC IL-9.5 E N70 (40604172) | TON | 26 | $200.00 | $950.00 | $909.65 | $979.00 | $1,600.00 |
| 25 | HMA surf rem 2 (44000157) | SY | 469 | $8.00 | $42.00 | $6.70 | $43.00 | $32.00 |
| 26 | Conc rem (50102400) | CY | 26.40 | $2,000.00 | $2,400.00 | $1,486.35 | $2,500.00 | $3,100.00 |
| 27 | Slope wall remov (50104650) | SY | 578 | $60.00 | $115.00 | $173.15 | $65.00 | $74.00 |
| 28 | Protective shield (50157300) | SY | 407 | $80.00 | $63.00 | $0.01 | $164.00 | $1.00 |
| 29 | Cofferdam typ 1 loc 1 (50201101) | EACH | 1 | $0.01 | $36,000 | $60,607 | $20,000 | $1,000.00 |
| 30 | Conc sup-STR (50300255) | CY | 26.30 | $2,500.00 | $2,560.00 | $3,279.05 | $5,000.00 | $3,700.00 |
| 31 | Protective coat (50300300) | SY | 2,878 | $1.00 | $2.00 | $3.60 | $6.00 | $1.50 |
| 32 | Reinf bars, epoxy CTD (50800205) | LB | 2,970 | $4.50 | $5.00 | $4.00 | $2.75 | $4.00 |
| 33 | Bar splicers (50800515) | EACH | 48 | $65.00 | $65.00 | $54.55 | $143.00 | $70.00 |
| 34 | Pref JT strip seal (52000110) | LF | 184 | $250.00 | $245.00 | $420.20 | $384.00 | $275.00 |
| 35 | PRC flar end sec 18 (54213663) | EACH | 1 | $2,000.00 | $2,200.00 | $1,800.00 | $5,400.00 | $3,700.00 |
| 36 | Rem RE-E T B term T6 (63302700) | EACH | 1 | $3,555.20 | $2,400.00 | $2,600.00 | $2,900.00 | $3,300.00 |
| 37 | Non SPL waste disposl (66900200) | CY | 110 | $90.00 | $98.00 | $134.60 | $122.00 | $100.00 |
| 38 | Soil disposal analy (66900530) | EACH | 2 | $1,650.00 | $1,600.00 | $1,480.00 | $1,936.00 | $1,000.00 |
| 39 | Reg sub P-const plan (66901001) | LS | 1 | $2,250.00 | $3,700.00 | $3,400.00 | $2,650.00 | $2,400.00 |
| 40 | Reg sub F con report (66901003) | LS | 1 | $2,250.00 | $600.00 | $500.00 | $2,420.00 | $2,100.00 |
| 41 | Reg sub mon (66901006) | CAL DAY | 3 | $900.00 | $800.00 | $700.00 | $1,140.00 | $1,200.00 |
| 42 | Mobilization (67100100) | LS | 1 | $69,500 | $82,000 | $83,700 | $101,000 | $90,000 |
| 43 | Changeable message SN (70107025) | CAL DAY | 268 | $50.00 | $33.00 | $30.00 | $34.00 | $32.00 |
| 44 | SHRT TRM pavt MK rem (70300150) | SF | 2,936 | $0.01 | $1.00 | $0.60 | $0.90 | $0.60 |
| 45 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 256 | $0.01 | $4.00 | $8.00 | $4.30 | $5.00 |
| 46 | Temp PVT MK L4 T4 tape (70307120) | LF | 12,006 | $0.01 | $1.20 | $1.35 | $1.20 | $1.30 |
| 47 | Temp PVT MK L6 T4 tape (70307130) | LF | 2,296 | $0.01 | $1.80 | $2.00 | $1.90 | $1.65 |
| 48 | Temp PVT MK L12 T4 tape (70307160) | LF | 184 | $0.01 | $3.60 | $4.00 | $3.80 | $4.00 |
| 49 | Temp PVT MK L24 T4 tape (70307210) | LF | 142 | $0.01 | $7.00 | $8.00 | $7.60 | $8.00 |
| 50 | Temp conc barrier (70400100) | LF | 1,050 | $30.00 | $32.00 | $32.05 | $40.00 | $23.00 |
| 51 | Rel temp conc barrier (70400200) | LF | 950 | $15.00 | $6.00 | $7.50 | $7.50 | $5.00 |
| 52 | Imp attn temp FRN TL2 (70600255) | EACH | 4 | $6,000.00 | $4,800.00 | $4,340.00 | $5,000.00 | $4,500.00 |
| 53 | Imp attn rel FRN TL2 (70600322) | EACH | 4 | $2,500.00 | $2,300.00 | $2,118.00 | $2,440.00 | $2,300.00 |
| 54 | THPL PVT MK LTR & sym (78000100) | SF | 256 | $6.33 | $6.00 | $4.00 | $4.60 | $6.00 |
| 55 | THPL PVT MK line 4 (78000200) | LF | 10,228 | $0.94 | $1.00 | $0.70 | $0.70 | $1.00 |
| 56 | THPL PVT MK line 6 (78000400) | LF | 2,224 | $1.89 | $1.90 | $1.00 | $1.10 | $1.50 |
| 57 | THPL PVT MK line 12 (78000600) | LF | 184 | $3.65 | $3.60 | $2.00 | $2.30 | $3.00 |
| 58 | THPL PVT MK line 24 (78000650) | LF | 142 | $6.33 | $7.20 | $4.00 | $4.60 | $6.00 |
| 59 | Pref PL PM TD STD L 7 (78004635) | LF | 130 | $37.40 | $38.00 | $8.00 | $9.20 | $28.00 |
| 60 | Mod ureth PM line 4 (78009004) | LF | 1,035 | $7.65 | $7.70 | $4.50 | $5.10 | $6.00 |
| 61 | Mod ureth PM line 6 (78009006) | LF | 73 | $13.92 | $14.00 | $6.50 | $7.40 | $10.00 |
| 62 | GRV RCSD PVT MRKG 8 (78011040) | LF | 129 | $6.22 | $6.00 | $7.50 | $8.60 | $17.00 |
| 63 | Raised refl pavt MKR (78100100) | EACH | 8 | $533.50 | $520.00 | $275.00 | $316.00 | $550.00 |
| 64 | Barr wall ref type C (78200011) | EACH | 38 | $26.97 | $10.00 | $15.00 | $9.00 | $15.00 |
| 65 | Raised ref PVT MK rem (78300200) | EACH | 8 | $40.00 | $30.00 | $20.00 | $11.50 | $25.00 |
| 66 | PVT MKG rem WTR blast (78300202) | SF | 5,584 | $3.30 | $0.05 | $1.50 | $0.06 | $1.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.