IDOT contract 61L86 bid tabulation
Project Number: Tngj-657 / /, section 19-00510-00-BR. Let by Illinois DOT on April 24, 2026, Mchenry, District 01. 2 bids received; low bid $4,604,844 by Dunnet Bay Construction Company.
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 131
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dunnet Bay Construction Company | $4,604,844 | Low |
| 2 | Lorig Construction Company | $5,090,868 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dunnet Bay Construction Company | 2. Lorig Construction Company |
|---|---|---|---|---|---|
| 1 | Mowing cycles (K1003660) | EACH | 35 | $900.00 | $1,250.00 |
| 2 | Prairie seeding SPL (K1004572) | ACRE | 0.50 | $3,000.00 | $6,100.00 |
| 3 | Temporary seeding (K1005418) | ACRE | 9 | $350.00 | $620.00 |
| 4 | Seeding SPL (K1005421) | ACRE | 0.25 | $3,200.00 | $6,950.00 |
| 5 | Seeding sedge MDW mix (K1005428) | ACRE | 0.25 | $3,400.00 | $6,950.00 |
| 6 | Trees (special) (XX006570) | EACH | 1 | $7,500.00 | $4,300.00 |
| 7 | Emerg/ shore seed mix (XX006622) | ACRE | 0.25 | $3,800.00 | $17,000 |
| 8 | Wetland plants (XX006660) | EACH | 4,200 | $7.00 | $7.00 |
| 9 | Outfall structure (XX007061) | EACH | 1 | $2,500.00 | $3,350.00 |
| 10 | Seed mes wet nat gras (XX007646) | ACRE | 0.25 | $3,000.00 | $9,000.00 |
| 11 | Bioswale (XX009434) | SY | 78 | $513.00 | $240.00 |
| 12 | Mat stream bed est 24 (XX009719) | SY | 431 | $113.00 | $165.00 |
| 13 | Constrn VBRN monitrng (X0320096) | EACH | 2 | $15,000 | $2,500.00 |
| 14 | Rodent shields (X0322278) | EACH | 6 | $130.00 | $125.00 |
| 15 | Washout basin (X0326806) | LS | 1 | $2,000.00 | $500.00 |
| 16 | Relocate EX mailbox (X0327301) | EACH | 4 | $525.00 | $1,000.00 |
| 17 | River rock (X1800002) | TON | 83 | $235.00 | $175.00 |
| 18 | Stump removal (X2010404) | EACH | 13 | $80.00 | $180.00 |
| 19 | Explor trench SPL (X2130010) | LF | 100 | $110.00 | $125.00 |
| 20 | Perimeter eros bar SP (X2800400) | LF | 1,487 | $26.00 | $7.00 |
| 21 | Stone riprap CL A3 SP (X2810206) | TON | 103 | $152.40 | $155.00 |
| 22 | Temp access- priv ent (X4021000) | EACH | 3 | $1,000.00 | $2,000.00 |
| 23 | Temp access- road (X4023000) | EACH | 1 | $1,000.00 | $4,500.00 |
| 24 | HMA driveway pavt 3 (X4060280) | SY | 240 | $27.15 | $35.00 |
| 25 | Dewatering (X5021507) | LS | 1 | $50,000 | $1,000.00 |
| 26 | Cofferdams SPL (X5021510) | EACH | 2 | $175,000 | $1,000.00 |
| 27 | BR deck grooving long (X5030250) | SY | 630 | $10.00 | $11.00 |
| 28 | Bar terminators (X5080530) | EACH | 410 | $21.38 | $22.00 |
| 29 | SPBGR (short radius) (X6330725) | LF | 38 | $156.87 | $38.80 |
| 30 | Fence removal (X6640104) | LF | 34 | $20.00 | $12.00 |
| 31 | Engr FLD off A mod (X6700405) | CAL MO | 13 | $3,200.00 | $3,800.00 |
| 32 | Traf cont & prot SPL (X7010216) | LS | 1 | $22,000 | $220,000 |
| 33 | Temp info signing (X7200061) | SF | 55 | $22.00 | $24.00 |
| 34 | Teles STL sin sup SPL (X7280105) | LF | 14 | $26.00 | $26.00 |
| 35 | Rem rein wood SN post (X7300107) | EACH | 1 | $400.00 | $400.00 |
| 36 | Temp TR signal timing (X8900104) | EACH | 1 | $1,250.00 | $1,100.00 |
| 37 | Steel railing SPL (Z0007124) | LF | 401 | $487.00 | $525.00 |
| 38 | Stab constr entrance (Z0013797) | SY | 246 | $0.01 | $3.00 |
| 39 | Construction layout (Z0013798) | LS | 1 | $20,000 | $75,000 |
| 40 | Debris removal (Z0015500) | LS | 1 | $10,000 | $1,000.00 |
| 41 | Diamond grind BR sec (Z0029090) | SY | 561 | $26.41 | $12.00 |
| 42 | Rock fill (Z0054400) | CY | 1,530 | $120.00 | $130.00 |
| 43 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 |
| 44 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 |
| 45 | Temporary fence (20101000) | LF | 860 | $6.00 | $3.00 |
| 46 | Tree root pruning (20101200) | EACH | 6 | $300.00 | $250.00 |
| 47 | Tree prun over 10 (20101350) | EACH | 6 | $300.00 | $200.00 |
| 48 | Earth excavation (20200100) | CY | 1,270 | $34.50 | $38.00 |
| 49 | Rem & disp uns matl (20201200) | CY | 6,165 | $57.00 | $46.00 |
| 50 | Channel excavation (20300100) | CY | 785 | $56.50 | $65.00 |
| 51 | Furnished excavation (20400800) | CY | 2,320 | $31.00 | $45.00 |
| 52 | Trench backfill (20800150) | CY | 44 | $77.00 | $100.00 |
| 53 | Porous gran backfill (20900110) | CY | 43.50 | $62.25 | $166.00 |
| 54 | Geotech fab F/GR stab (21001000) | SY | 7,635 | $2.25 | $2.00 |
| 55 | Topsoil exc & plac (21101505) | CY | 3,985 | $8.00 | $17.00 |
| 56 | Seeding CL 2A (25000210) | ACRE | 0.75 | $3,200.00 | $2,800.00 |
| 57 | Nitrogen fert nutr (25000400) | LB | 68 | $3.00 | $4.00 |
| 58 | Potassium fert nutr (25000600) | LB | 68 | $3.00 | $4.00 |
| 59 | Mulch method 3 (25100125) | ACRE | 13.50 | $3,000.00 | $5,500.00 |
| 60 | Wildlife friendly ecb (25100645) | SY | 7,561 | $1.70 | $2.00 |
| 61 | Supple watering (25200200) | UNIT | 294 | $1.00 | $6.50 |
| 62 | Temp eros contr seed (28000250) | LB | 450 | $5.00 | $6.00 |
| 63 | Temp ditch checks (28000305) | LF | 1,535 | $9.00 | $7.00 |
| 64 | Perimeter eros bar (28000400) | LF | 1,109 | $3.50 | $4.00 |
| 65 | Inlet & pipe protect (28000500) | EACH | 3 | $300.00 | $300.00 |
| 66 | Inlet filters (28000510) | EACH | 3 | $250.00 | $150.00 |
| 67 | Stone riprap CL A3 (28100205) | TON | 12 | $150.00 | $135.00 |
| 68 | Filter fabric (28200200) | SY | 924 | $4.00 | $3.25 |
| 69 | Articul block rev mat (28500400) | SY | 775 | $322.00 | $300.00 |
| 70 | Agg subgrade improve (30300001) | CY | 229 | $69.00 | $105.00 |
| 71 | Agg subgrade impr 12 (30300112) | SY | 3,008 | $33.00 | $33.00 |
| 72 | Agg base cse B (35101500) | CY | 33 | $167.00 | $115.00 |
| 73 | Agg base cse B 6 (35101800) | SY | 240 | $29.00 | $26.00 |
| 74 | Bit matls PR CT (40600275) | LB | 6,735 | $0.01 | $0.01 |
| 75 | Bit matls tack CT (40600290) | LB | 1,265 | $0.01 | $0.01 |
| 76 | Long joint sealant (40600370) | LF | 768 | $16.00 | $16.00 |
| 77 | HMA pavt FD 8 1/2 (40701851) | SY | 1,821 | $46.65 | $52.00 |
| 78 | Welded wire reinf (42000060) | SY | 49 | $20.00 | $25.00 |
| 79 | PVT con PCC BR app SL (42000080) | SY | 72 | $210.00 | $360.00 |
| 80 | Pavement rem (44000100) | SY | 2,046 | $14.18 | $22.00 |
| 81 | Drive pavement rem (44000200) | SY | 262 | $18.40 | $22.00 |
| 82 | HMA shoulders 2 (48203005) | SY | 180 | $12.25 | $16.00 |
| 83 | HMA shoulders 8 1/2 (48203031) | SY | 924 | $49.75 | $56.00 |
| 84 | Rem exist struct (50100100) | EACH | 1 | $330,000 | $600,000 |
| 85 | Pipe culvert remov (50105220) | LF | 195 | $27.00 | $67.00 |
| 86 | Structure excavation (50200100) | CY | 70 | $20.00 | $60.00 |
| 87 | Rem/disp uns matl-STR (50200450) | CY | 95 | $73.69 | $87.00 |
| 88 | Conc struct (50300225) | CY | 98 | $700.00 | $1,700.00 |
| 89 | Conc sup-STR (50300255) | CY | 261.50 | $800.00 | $1,200.00 |
| 90 | Protective coat (50300300) | SY | 840 | $2.70 | $1.75 |
| 91 | Conc supstr app slab (50301350) | CY | 98 | $650.00 | $625.00 |
| 92 | F&E PP con beam IL36N (50401315) | LF | 583.50 | $558.00 | $575.00 |
| 93 | Stud shear connectors (50500505) | EACH | 1,119 | $17.00 | $33.00 |
| 94 | Reinf bars, epoxy CTD (50800205) | LB | 95,930 | $1.79 | $1.80 |
| 95 | Fur M S pile 16X0.312 (51200961) | LF | 950 | $122.00 | $109.00 |
| 96 | Driving piles (51202305) | LF | 950 | $0.01 | $1.00 |
| 97 | Test pile met shells (51203200) | EACH | 2 | $20,000 | $10,000 |
| 98 | Pile shoes (51204650) | EACH | 19 | $470.00 | $500.00 |
| 99 | Name plates (51500100) | EACH | 1 | $850.00 | $1,100.00 |
| 100 | Perm SHT piling (52200015) | SF | 6,205 | $49.00 | $60.00 |
| 101 | P cul CL C 1 15 (542C0220) | LF | 72 | $159.00 | $110.00 |
| 102 | PRC flar end sec 15 (54213660) | EACH | 1 | $2,889.00 | $2,200.00 |
| 103 | PRC flar end sec 24 (54213669) | EACH | 1 | $3,237.00 | $2,500.00 |
| 104 | SLP MT ES WG 15",1:6 (54260715) | EACH | 4 | $1,250.00 | $1,100.00 |
| 105 | Conc ES 542001 15 1:3 (54261315) | EACH | 1 | $4,278.00 | $4,600.00 |
| 106 | Storm sew CL A 1 24 (550A0120) | LF | 65 | $126.00 | $80.00 |
| 107 | Storm sew CL A 2 15 (550A0360) | LF | 49 | $96.50 | $95.00 |
| 108 | Storm sew CL A 2 24 (550A0410) | LF | 114 | $119.00 | $110.00 |
| 109 | Granular backfill STR (58600101) | CY | 107.50 | $43.00 | $210.00 |
| 110 | Geocomposite wall DR (59100100) | SY | 202 | $69.00 | $35.00 |
| 111 | Conc HDWL for P drain (60100060) | EACH | 6 | $649.00 | $1,600.00 |
| 112 | Pipe underdrain 4 SP (60108100) | LF | 83 | $17.00 | $34.00 |
| 113 | Pipe underdr T 2 4 (60108204) | LF | 2,361 | $21.65 | $25.00 |
| 114 | P undr for struct 4 (60146304) | LF | 380 | $23.16 | $37.00 |
| 115 | CB TA 4 dia T8G (60200805) | EACH | 2 | $4,747.61 | $2,800.00 |
| 116 | SPBGR TY A 9FT posts (63000003) | LF | 88 | $53.61 | $48.39 |
| 117 | Traf bar term T2 (63100045) | EACH | 1 | $1,944.83 | $1,695.00 |
| 118 | Traf bar term T6 (63100085) | EACH | 4 | $5,262.65 | $4,187.00 |
| 119 | TR bar TRM T1 SPL tan (63100167) | EACH | 2 | $4,430.00 | $3,394.00 |
| 120 | TR bar TRM T1 SPL FLR (63100169) | EACH | 1 | $4,430.00 | $3,741.00 |
| 121 | Guardrail remov (63200310) | LF | 81 | $20.00 | $13.10 |
| 122 | Delineators (63500105) | EACH | 1 | $185.00 | $65.00 |
| 123 | Fur erect row markers (66600105) | EACH | 19 | $48.95 | $400.00 |
| 124 | Mobilization (67100100) | LS | 1 | $276,291 | $270,000 |
| 125 | Changeable message SN (70107025) | CAL DAY | 28 | $36.00 | $37.00 |
| 126 | SHRT TRM pavt MK rem (70300150) | SF | 1,254 | $0.45 | $0.50 |
| 127 | Temp PVT MK L4 T4 tape (70307120) | LF | 3,760 | $1.35 | $1.35 |
| 128 | Rem & rel sign panel asmbly TA (72400205) | EACH | 3 | $225.00 | $225.00 |
| 129 | Terminal marker - DA (72501000) | EACH | 3 | $20.00 | $35.00 |
| 130 | Mod ureth PM line 4 (78009004) | LF | 3,760 | $1.75 | $1.75 |
| 131 | Grdrail ref type A (78200005) | EACH | 11 | $20.00 | $11.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.