IDOT contract 61M15 bid tabulation
Mount Prospect, section 21-00174-00-BR. Let by Illinois DOT on April 24, 2026, Cook, District 01. 3 bids received; low bid $10,744,243 by Dunnet Bay Construction Company.
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 164
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dunnet Bay Construction Company | $10,744,243 | Low |
| 2 | Lorig Construction Company | $11,802,035 | +10% |
| 3 | Granite Construction Company | $12,862,046 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dunnet Bay Construction Company | 2. Lorig Construction Company | 3. Granite Construction Company |
|---|---|---|---|---|---|---|
| 1 | T-acerx frem AB 2-1/2 (A2000120) | EACH | 5 | $725.00 | $725.00 | $725.00 |
| 2 | T-gled tri-I SM 2-1/2 (A2004720) | EACH | 4 | $725.00 | $725.00 | $725.00 |
| 3 | T-quercus bicol 2 (A2006516) | EACH | 5 | $575.00 | $575.00 | $575.00 |
| 4 | E-picea abies 6' (D2001772) | EACH | 5 | $750.00 | $750.00 | $750.00 |
| 5 | E-picea abies 8' (D2001788) | EACH | 7 | $1,000.00 | $1,000.00 | $1,000.00 |
| 6 | E-psuedo menzi 6' (D2003172) | EACH | 6 | $750.00 | $750.00 | $750.00 |
| 7 | E-psuedo menzi 9 (D2003195) | EACH | 3 | $1,100.00 | $1,100.00 | $1,100.00 |
| 8 | E-thuja occ tec 6' (D2003872) | EACH | 9 | $525.00 | $525.00 | $525.00 |
| 9 | Gravel mulch (K1001969) | TON | 43 | $100.00 | $100.00 | $100.00 |
| 10 | Conn EX W MN NP 8 (XX003516) | EACH | 1 | $4,600.00 | $5,600.00 | $18,500 |
| 11 | Conn EX W MN NP 6 (XX003517) | EACH | 1 | $4,400.00 | $5,600.00 | $17,500 |
| 12 | Stair railing (XX006751) | LF | 242 | $570.39 | $580.00 | $577.77 |
| 13 | Gate vlve 6 W/VLT 4 (XX007558) | EACH | 1 | $7,600.00 | $6,650.00 | $15,000 |
| 14 | Orn metal panel (XX007788) | EACH | 20 | $2,200.00 | $6,500.00 | $6,500.00 |
| 15 | Light pole special T2 (XX009135) | EACH | 1 | $15,200 | $15,200 | $16,108 |
| 16 | Aban EX SS fill CLSM (XX009528) | LF | 373 | $36.00 | $190.00 | $40.00 |
| 17 | Light pole special T3 (XX009742) | EACH | 2 | $17,800 | $18,000 | $23,604 |
| 18 | Combined sewer 24 (XX009743) | LF | 118 | $366.00 | $340.00 | $130.00 |
| 19 | Storm sewer PVC 8 (XX009744) | LF | 23 | $165.00 | $145.00 | $225.00 |
| 20 | Prec ornamen pier cap (XX009757) | EACH | 4 | $30,000 | $29,000 | $30,000 |
| 21 | Ped truss superstr (X0322508) | SF | 2,404 | $755.00 | $525.00 | $300.00 |
| 22 | Pedstrn BR light sys (X0326672) | LS | 1 | $150,000 | $150,000 | $152,021 |
| 23 | Washout basin (X0326806) | LS | 1 | $1,000.00 | $500.00 | $10,000 |
| 24 | Stair gra system (X0327777) | SF | 364 | $300.14 | $310.00 | $305.00 |
| 25 | Inlet protection SPL (X2800500) | EACH | 8 | $350.00 | $350.00 | $350.00 |
| 26 | CL D patch T2 12 SPL (X4421790) | SY | 11 | $418.71 | $400.00 | $500.00 |
| 27 | Form liner LMSTN surf (X5030283) | SF | 3,212 | $36.00 | $30.00 | $50.00 |
| 28 | Stain conc structures (X5030290) | SF | 25,507 | $5.00 | $5.50 | $5.00 |
| 29 | Bicycle railing SPL (X5091725) | LF | 1,503 | $459.23 | $477.00 | $465.16 |
| 30 | Bridge fence rail SP (X5091730) | LF | 654 | $617.81 | $650.00 | $625.80 |
| 31 | Mech ST earth R WL SP (X5220092) | SF | 1,027 | $125.00 | $165.00 | $175.00 |
| 32 | Remov EX flar end sec (X5427602) | EACH | 1 | $900.00 | $700.00 | $1,200.00 |
| 33 | Pro SS conn to EX SS (X5510012) | EACH | 1 | $3,600.00 | $2,100.00 | $18,500 |
| 34 | Comb sew rem 24 (X5510224) | LF | 6 | $320.00 | $50.00 | $300.00 |
| 35 | San sew remov 10 (X5510310) | LF | 3 | $280.00 | $45.00 | $580.00 |
| 36 | Cap exist water main (X5610012) | EACH | 1 | $2,200.00 | $5,500.00 | $1,750.00 |
| 37 | Water main remov 6 (X5610706) | LF | 67 | $35.00 | $93.00 | $60.00 |
| 38 | WM line stop 8 (X5610748) | EACH | 1 | $8,500.00 | $15,100 | $19,000 |
| 39 | Drainage control STR (X6020180) | EACH | 1 | $13,200 | $9,600.00 | $12,000 |
| 40 | Connect EX manhole (X6020399) | EACH | 1 | $3,800.00 | $3,200.00 | $17,500 |
| 41 | Drop san man T1F CL (X6022312) | EACH | 1 | $25,800 | $35,000 | $22,000 |
| 42 | Man san 4 dia T1F CL (X6022810) | EACH | 6 | $12,800 | $12,200 | $8,000.00 |
| 43 | Man san 5 dia T1F CL (X6022820) | EACH | 3 | $16,400 | $16,500 | $9,500.00 |
| 44 | San man removed (X6026054) | EACH | 1 | $900.00 | $900.00 | $1,200.00 |
| 45 | Temp CH LK fence (X6640200) | LF | 1,730 | $36.00 | $37.00 | $21.00 |
| 46 | CH LK fence SPL (X6640298) | LF | 380 | $55.66 | $57.00 | $56.38 |
| 47 | CH LK gates SPL (X6640308) | EACH | 2 | $2,088.97 | $2,200.00 | $2,115.98 |
| 48 | CH LK fence 6 SPL (X6640560) | LF | 960 | $35.53 | $36.00 | $35.99 |
| 49 | Traf cont & prot SPL (X7010216) | LS | 1 | $46,150 | $600,000 | $49,000 |
| 50 | Temp info signing (X7200061) | SF | 43 | $16.00 | $16.00 | $16.00 |
| 51 | F & E sign pan - logo (X7200096) | SF | 328 | $122.66 | $205.00 | $260.00 |
| 52 | Luminaire, type A SPL (X8212031) | EACH | 7 | $2,750.00 | $2,750.00 | $2,844.80 |
| 53 | Luminaire, type B SPL (X8212032) | EACH | 6 | $4,420.00 | $4,425.00 | $3,221.30 |
| 54 | Light controller SPL (X8250505) | EACH | 2 | $20,800 | $21,000 | $21,413 |
| 55 | Light pole special (X8300001) | EACH | 2 | $10,000 | $10,000 | $10,043 |
| 56 | Light pole FDN SPL (X8360110) | LF | 58 | $631.00 | $640.00 | $627.50 |
| 57 | Bollards (Z0004002) | EACH | 2 | $3,000.00 | $2,500.00 | $2,000.00 |
| 58 | Stab constr entrance (Z0013797) | SY | 131 | $42.00 | $3.00 | $110.00 |
| 59 | Construction layout (Z0013798) | LS | 1 | $72,150 | $350,000 | $175,000 |
| 60 | RR prot liability ins (Z0048665) | LS | 1 | $7,000.00 | $10,000 | $10,000 |
| 61 | Storm sew WM req 15 (Z0056610) | LF | 45 | $215.00 | $260.00 | $196.76 |
| 62 | San sew 10 (Z0057000) | LF | 250 | $188.00 | $325.00 | $300.00 |
| 63 | Steel casings 16 (Z0067500) | LF | 20 | $180.00 | $250.00 | $250.00 |
| 64 | Steel casings 28 (Z0068100) | LF | 23 | $340.00 | $310.00 | $300.00 |
| 65 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 66 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 67 | Tree remov 6-15 (20100110) | UNIT | 84 | $27.00 | $35.00 | $27.00 |
| 68 | Tree remov over 15 (20100210) | UNIT | 178 | $37.00 | $45.00 | $37.00 |
| 69 | Temporary fence (20101000) | LF | 220 | $4.00 | $4.00 | $4.00 |
| 70 | Tree prun 1-10 (20101300) | EACH | 2 | $55.00 | $200.00 | $55.00 |
| 71 | Tree prun over 10 (20101350) | EACH | 6 | $180.00 | $350.00 | $180.00 |
| 72 | Earth excavation (20200100) | CY | 490 | $89.00 | $46.00 | $110.00 |
| 73 | Rem & disp uns matl (20201200) | CY | 575 | $38.00 | $64.00 | $60.00 |
| 74 | Furnished excavation (20400800) | CY | 1,000 | $27.00 | $55.00 | $75.00 |
| 75 | Trench backfill (20800150) | CY | 90 | $98.00 | $90.00 | $40.00 |
| 76 | Geotech fab F/GR stab (21001000) | SY | 181 | $4.00 | $3.00 | $10.00 |
| 77 | Topsoil F & P 4 (21101615) | SY | 6,250 | $6.00 | $6.00 | $6.00 |
| 78 | Seeding CL 2A (25000210) | ACRE | 1.50 | $2,500.00 | $2,500.00 | $2,500.00 |
| 79 | Nitrogen fert nutr (25000400) | LB | 135 | $3.00 | $3.00 | $3.00 |
| 80 | Phosphorus fert nutr (25000500) | LB | 135 | $3.00 | $3.00 | $3.00 |
| 81 | Potassium fert nutr (25000600) | LB | 135 | $3.00 | $3.00 | $3.00 |
| 82 | Erosion contr blanket (25100630) | SY | 6,258 | $1.50 | $1.50 | $1.50 |
| 83 | Supple watering (25200200) | UNIT | 3.10 | $100.00 | $100.00 | $100.00 |
| 84 | Temp eros contr seed (28000250) | LB | 130 | $5.00 | $5.00 | $5.00 |
| 85 | Temp ditch checks (28000305) | LF | 100 | $15.00 | $15.00 | $15.00 |
| 86 | Perimeter eros bar (28000400) | LF | 1,255 | $4.00 | $4.00 | $4.00 |
| 87 | Inlet filters (28000510) | EACH | 2 | $300.00 | $300.00 | $300.00 |
| 88 | Temp eros contr blank (28001100) | SY | 6,258 | $1.50 | $1.50 | $1.50 |
| 89 | Stone riprap CL A2 (28100103) | SY | 198 | $69.00 | $33.00 | $70.00 |
| 90 | Filter fabric (28200200) | SY | 473 | $3.00 | $3.50 | $6.00 |
| 91 | Agg subgrade improve (30300001) | CY | 61 | $72.00 | $145.00 | $115.00 |
| 92 | Sub gran mat B 2 (31101180) | SY | 315 | $8.00 | $17.00 | $15.00 |
| 93 | Agg base cse B 6 (35101800) | SY | 848 | $9.00 | $30.00 | $20.00 |
| 94 | Bit matls PR CT (40600275) | LB | 1,907 | $0.01 | $0.01 | $0.01 |
| 95 | Bit matls tack CT (40600290) | LB | 34 | $0.01 | $0.10 | $0.01 |
| 96 | HMA SC IL-9.5 D N50 (40604060) | TON | 143 | $246.34 | $288.00 | $246.34 |
| 97 | HMA SC IL-9.5 D N70 (40604062) | TON | 9 | $333.94 | $350.00 | $333.94 |
| 98 | PC conc sidewalk 5 (42400200) | SF | 2,712 | $15.00 | $18.00 | $20.00 |
| 99 | HMA surf rem 2 (44000157) | SY | 75 | $43.76 | $45.00 | $43.76 |
| 100 | Comb curb gutter rem (44000500) | LF | 70 | $12.00 | $27.00 | $45.00 |
| 101 | Sidewalk rem (44000600) | SF | 4,886 | $2.00 | $3.75 | $6.75 |
| 102 | Structure excavation (50200100) | CY | 1,398 | $60.00 | $70.00 | $150.00 |
| 103 | Floor drains (50300100) | EACH | 16 | $600.00 | $900.00 | $1,000.00 |
| 104 | Conc struct (50300225) | CY | 682.80 | $2,500.00 | $3,150.00 | $4,250.00 |
| 105 | Conc sup-STR (50300255) | CY | 530.80 | $3,000.00 | $2,850.00 | $4,500.00 |
| 106 | Protective coat (50300300) | SY | 1,566 | $2.50 | $2.50 | $30.00 |
| 107 | Conc supstr app slab (50301350) | CY | 54.70 | $1,650.00 | $1,100.00 | $2,500.00 |
| 108 | Reinf bars, epoxy CTD (50800205) | LB | 347,520 | $1.90 | $2.00 | $1.60 |
| 109 | Fur M S pile 14X0.250 (51200958) | LF | 1,001 | $92.00 | $85.00 | $200.00 |
| 110 | Driving piles (51202305) | LF | 1,001 | $0.01 | $1.00 | $1.00 |
| 111 | Test pile met shells (51203200) | EACH | 2 | $20,000 | $7,700.00 | $15,000 |
| 112 | Name plates (51500100) | EACH | 1 | $1,000.00 | $1,100.00 | $2,500.00 |
| 113 | Pref JT strip seal (52000110) | LF | 34 | $700.00 | $850.00 | $1,250.00 |
| 114 | Temp soil reten systm (52200020) | SF | 1,029 | $0.01 | $1.00 | $250.00 |
| 115 | Drainage system for structures (52318802) | LS | 1 | $75,000 | $90,000 | $148,000 |
| 116 | PRC flar end sec 12 (54213657) | EACH | 1 | $1,600.00 | $2,200.00 | $3,293.00 |
| 117 | PRC flar end sec 15 (54213660) | EACH | 2 | $1,800.00 | $2,300.00 | $3,500.00 |
| 118 | Storm sew CL A 2 12 (550A0340) | LF | 15 | $125.00 | $140.00 | $600.00 |
| 119 | Storm sew CL A 2 15 (550A0360) | LF | 428 | $125.00 | $147.00 | $210.00 |
| 120 | Storm sewer rem 8 (55100300) | LF | 44 | $20.00 | $25.00 | $53.00 |
| 121 | Storm sewer rem 12 (55100500) | LF | 73 | $20.00 | $30.00 | $48.00 |
| 122 | Water main 6 (56100600) | LF | 66 | $385.00 | $293.00 | $155.00 |
| 123 | Granular backfill STR (58600101) | CY | 24 | $90.00 | $175.00 | $250.00 |
| 124 | Concrete sealer (58700300) | SF | 11,149 | $3.00 | $2.50 | $3.00 |
| 125 | Geocomposite wall DR (59100100) | SY | 34 | $22.00 | $35.00 | $60.00 |
| 126 | Conc HDWL for P drain (60100060) | EACH | 1 | $1,250.00 | $1,200.00 | $2,500.00 |
| 127 | P undr for struct 4 (60146304) | LF | 32 | $100.00 | $92.00 | $40.00 |
| 128 | P undr for struct SPL 4 (60146305) | LF | 16 | $200.00 | $90.00 | $40.00 |
| 129 | Man TA 4 dia T1F CL (60218400) | EACH | 4 | $5,200.00 | $5,000.00 | $7,500.00 |
| 130 | Man TA 4 dia T8G (60219000) | EACH | 5 | $5,000.00 | $4,900.00 | $7,800.00 |
| 131 | Inlets TA T8G (60236200) | EACH | 3 | $2,800.00 | $2,000.00 | $2,500.00 |
| 132 | Inlets TA T24F&G (60237470) | EACH | 1 | $3,100.00 | $2,400.00 | $2,500.00 |
| 133 | Remov manholes (60500040) | EACH | 1 | $600.00 | $1,225.00 | $750.00 |
| 134 | Comb CC&G TB6.12 (60603800) | LF | 46 | $122.00 | $105.00 | $50.00 |
| 135 | Comb CC&G TB6.24 VWGF (60605500) | LF | 24 | $145.00 | $165.00 | $100.00 |
| 136 | Guardrail remov (63200310) | LF | 79 | $26.91 | $28.00 | $27.26 |
| 137 | CH LK fence 6 (66400305) | LF | 390 | $101.74 | $105.00 | $103.06 |
| 138 | CH LK gate 6X4 singl (66402700) | EACH | 4 | $2,133.53 | $2,200.00 | $2,161.11 |
| 139 | Non SPL waste disposl (66900200) | CY | 2,775 | $94.10 | $100.00 | $70.00 |
| 140 | Soil disposal analy (66900530) | EACH | 4 | $1,450.00 | $1,500.00 | $770.00 |
| 141 | Reg sub P-const plan (66901001) | LS | 1 | $3,100.00 | $3,100.00 | $5,800.00 |
| 142 | Reg sub F con report (66901003) | LS | 1 | $1,200.00 | $1,200.00 | $500.00 |
| 143 | Reg sub mon (66901006) | CAL DAY | 20 | $765.00 | $1,200.00 | $715.00 |
| 144 | Mobilization (67100100) | LS | 1 | $644,655 | $650,000 | $771,000 |
| 145 | Changeable message SN (70107025) | CAL DAY | 400 | $24.00 | $25.00 | $24.00 |
| 146 | Night work zone light (70200100) | LS | 1 | $1.00 | $100.00 | $5,000.00 |
| 147 | Temp conc barrier (70400100) | LF | 112.50 | $43.35 | $50.00 | $65.00 |
| 148 | Imp attn temp FRN TL2 (70600255) | EACH | 1 | $6,500.00 | $6,500.00 | $6,500.00 |
| 149 | Paint PVT MK line 4 (78001110) | LF | 2,000 | $1.00 | $1.00 | $1.00 |
| 150 | PVT MKG rem WTR blast (78300202) | SF | 16 | $250.00 | $250.00 | $250.00 |
| 151 | Elect serv install (80400100) | EACH | 2 | $2,510.00 | $2,525.00 | $4,437.50 |
| 152 | Elect util serv conn (80400200) | LS | 1 | $10,000 | $10,000 | $10,000 |
| 153 | Undrgrd C galvs 1 (81028170) | LF | 130 | $25.65 | $26.00 | $37.10 |
| 154 | Undrgrd C galvs 2 1/2 (81028210) | LF | 350 | $62.65 | $63.00 | $85.60 |
| 155 | Undrgrd C CNC 1 1/2 (81028740) | LF | 415 | $24.95 | $26.00 | $37.50 |
| 156 | Con at ST 1 PVC GS (81100320) | LF | 120 | $55.10 | $56.00 | $93.20 |
| 157 | Con emb STR 1 galvs (81200100) | LF | 150 | $63.50 | $65.00 | $76.50 |
| 158 | Jun BX SS as 6X6X4 (81300220) | EACH | 6 | $2,050.00 | $2,100.00 | $1,756.30 |
| 159 | Jun BX SS as 8X8X6 (81300320) | EACH | 2 | $2,130.00 | $2,200.00 | $2,218.80 |
| 160 | Handhole (81400100) | EACH | 1 | $3,360.00 | $3,400.00 | $4,204.10 |
| 161 | EC C XLP use 1C 10 (81702110) | LF | 798 | $6.20 | $6.25 | $3.30 |
| 162 | EC C XLP use 1C 8 (81702120) | LF | 2,418 | $3.85 | $4.00 | $4.90 |
| 163 | EC C XLP use 1C 2/0 (81702170) | LF | 495 | $10.80 | $11.00 | $12.40 |
| 164 | EC C XLP use 1C 250 (81702200) | LF | 945 | $14.35 | $15.00 | $20.20 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.