IDOT contract 68J80 bid tabulation
Section (116)TS-3. Let by Illinois DOT on June 13, 2025, Peoria, District 04. 2 bids received; low bid $239,436 by Oberlander Electric Co..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 24
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Oberlander Electric Co. | $239,436 | Low |
| 2 | Laser Electric, Inc. | $252,457 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Oberlander Electric Co. | 2. Laser Electric, Inc. |
|---|---|---|---|---|---|
| 1 | Traf cont & prot SPL (X7010216) | LS | 1 | $22,500 | $15,894 |
| 2 | Reloc EX luminaire (X8440102) | EACH | 1 | $500.00 | $1,032.06 |
| 3 | TS batt backup system (Z0033068) | EACH | 1 | $15,000 | $15,891 |
| 4 | Mobilization (67100100) | LS | 1 | $16,500 | $12,729 |
| 5 | Sign panel T2 (72000200) | SF | 23.80 | $145.00 | $193.59 |
| 6 | Undrgrd C PVC 3 (81028370) | LF | 9 | $75.00 | $117.47 |
| 7 | EC C XLP use 1C 10 (81702110) | LF | 801 | $12.00 | $3.87 |
| 8 | Elcbl C signal 14 5C (87301245) | LF | 883 | $15.00 | $5.69 |
| 9 | Elcbl C egrdc 6 1C (87301900) | LF | 18.50 | $15.00 | $34.30 |
| 10 | TS post galvs 18 (87502520) | EACH | 1 | $7,560.00 | $5,461.61 |
| 11 | STL comb maa&P 70 (87703090) | EACH | 1 | $56,500 | $91,553 |
| 12 | Conc FDN TY E 42D (87800420) | LF | 25 | $950.00 | $1,825.28 |
| 13 | Drill EX handhole (87900200) | EACH | 1 | $1,500.00 | $1,355.57 |
| 14 | SH P LED 1F 3S BM (88040070) | EACH | 1 | $1,250.00 | $2,315.44 |
| 15 | SH P LED 1F 3S mam (88040090) | EACH | 3 | $1,250.00 | $1,950.15 |
| 16 | SH P LED 1F 4S BM (88040110) | EACH | 1 | $1,550.00 | $2,392.35 |
| 17 | Ped SH P LED 1F BM CT (88102825) | EACH | 2 | $2,000.00 | $2,118.46 |
| 18 | TS backplate ret-refl (88200510) | EACH | 5 | $500.00 | $539.77 |
| 19 | Reloc EX ped sig head (89500200) | EACH | 1 | $1,125.00 | $1,434.51 |
| 20 | Reloc EX illum sign (89500300) | EACH | 1 | $1,890.00 | $2,310.15 |
| 21 | Reloc EX TS equip (89501250) | EACH | 1 | $18,550 | $7,952.92 |
| 22 | Rel EM veh PR SY comp (89501420) | EACH | 1 | $3,350.00 | $4,944.57 |
| 23 | Mod EX conc FDN (89502220) | EACH | 1 | $1,850.00 | $2,491.61 |
| 24 | Remov EX TS equip (89502375) | EACH | 1 | $28,550 | $11,857 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.