IDOT contract 61L09 bid tabulation
Northlake, section 23-00101-00-TL. Let by Illinois DOT on March 7, 2025, Cook, District 01. 2 bids received; low bid $674,695 by Home Towne Electric, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 75
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Home Towne Electric, Inc. | $674,695 | Low |
| 2 | John Burns Construction Company | $916,416 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Home Towne Electric, Inc. | 2. John Burns Construction Company |
|---|---|---|---|---|---|
| 1 | EM veh P S LSC 20 3C (X0324085) | LF | 324 | $1.80 | $1.00 |
| 2 | Serv instl GR MT MTR (X1400150) | EACH | 1 | $3,580.00 | $5,700.00 |
| 3 | Ped signal post 10 FT (X1400367) | EACH | 5 | $1,616.00 | $1,780.00 |
| 4 | Fac T super P cab (X8570232) | EACH | 1 | $23,615 | $30,000 |
| 5 | Uninter power sup SPL (X8620200) | EACH | 1 | $5,268.00 | $7,000.00 |
| 6 | Accessible ped signal (X8760200) | EACH | 8 | $1,946.00 | $1,900.00 |
| 7 | Conc FDN TY A 12D (X8780012) | LF | 20 | $389.00 | $555.00 |
| 8 | LED SF lens cover (X8809005) | EACH | 14 | $494.00 | $540.00 |
| 9 | Construction layout (Z0013798) | LS | 1 | $2,420.00 | $7,500.00 |
| 10 | Perm TR signal timing (Z0073509) | EACH | 1 | $1,675.00 | $650.00 |
| 11 | Temp TR signal timing (Z0073510) | EACH | 1 | $1,675.00 | $650.00 |
| 12 | Earth excavation (20200100) | CY | 80 | $187.00 | $75.00 |
| 13 | Furnished excavation (20400800) | CY | 50 | $137.50 | $85.00 |
| 14 | Topsoil exc & plac (21101505) | CY | 20 | $165.00 | $50.00 |
| 15 | Topsoil F & P 4 (21101615) | SY | 170 | $9.90 | $44.00 |
| 16 | Seeding CL 1A (25000110) | ACRE | 0.04 | $22,000 | $1,900.00 |
| 17 | Erosion contr blanket (25100630) | SY | 170 | $5.50 | $27.00 |
| 18 | Temp eros contr seed (28000250) | LB | 3 | $22.00 | $155.00 |
| 19 | Sub gran mat B 2 (31101180) | SY | 120 | $25.30 | $25.00 |
| 20 | Sub gran mat B 4 (31101200) | SY | 70 | $49.50 | $30.00 |
| 21 | Bit matls tack CT (40600290) | LB | 50 | $2.20 | $0.10 |
| 22 | HMA SC IL-9.5 D N70 (40604062) | TON | 10 | $918.50 | $2,500.00 |
| 23 | PC conc sidewalk 5 (42400200) | SF | 1,190 | $14.30 | $25.00 |
| 24 | Detectable warnings (42400800) | SF | 90 | $49.50 | $50.00 |
| 25 | HMA surf rem 2 (44000157) | SY | 70 | $39.60 | $55.00 |
| 26 | Comb curb gutter rem (44000500) | LF | 160 | $64.90 | $20.00 |
| 27 | Sidewalk rem (44000600) | SF | 1,080 | $4.40 | $20.00 |
| 28 | CL C patch T2 10 (44201353) | SY | 50 | $280.50 | $300.00 |
| 29 | CL C patch T3 10 (44201357) | SY | 30 | $280.50 | $300.00 |
| 30 | Conc curb TB (60600605) | LF | 60 | $88.00 | $85.00 |
| 31 | Comb CC&G TB6.12 (60603800) | LF | 160 | $88.00 | $85.00 |
| 32 | Mobilization (67100100) | LS | 1 | $123,950 | $55,000 |
| 33 | TR cont & prot 701701 (70102635) | LS | 1 | $4,000.00 | $7,250.00 |
| 34 | TR cont & prot 701801 (70102640) | LS | 1 | $2,500.00 | $1.00 |
| 35 | Changeable message SN (70107025) | CAL DAY | 140 | $72.00 | $30.00 |
| 36 | Sign panel T1 (72000100) | SF | 27 | $123.20 | $35.00 |
| 37 | THPL PVT MK line 12 (78000600) | LF | 400 | $13.80 | $7.50 |
| 38 | THPL PVT MK line 24 (78000650) | LF | 120 | $27.50 | $12.00 |
| 39 | PVT MKG rem WTR blast (78300202) | SF | 680 | $5.50 | $5.00 |
| 40 | Undrgrd C galvs 2 (81028200) | LF | 780 | $30.20 | $55.00 |
| 41 | Undrgrd C galvs 3 (81028220) | LF | 144 | $45.90 | $55.00 |
| 42 | Undrgrd C galvs 4 (81028240) | LF | 415 | $80.50 | $90.00 |
| 43 | Handhole (81400100) | EACH | 4 | $2,315.00 | $5,600.00 |
| 44 | HD handhole (81400200) | EACH | 2 | $3,825.00 | $7,200.00 |
| 45 | DBL handhole (81400300) | EACH | 2 | $4,745.00 | $9,300.00 |
| 46 | Elcbl C signal 14 2C (87301215) | LF | 1,306 | $2.00 | $1.00 |
| 47 | Elcbl C signal 14 3C (87301225) | LF | 1,680 | $2.10 | $1.10 |
| 48 | Elcbl C signal 14 5C (87301245) | LF | 1,984 | $2.50 | $1.20 |
| 49 | Elcbl C signal 14 7C (87301255) | LF | 780 | $3.40 | $1.50 |
| 50 | Elcbl C lead 14 1PR (87301305) | LF | 2,307 | $2.10 | $1.00 |
| 51 | Elcbl C serv 6 2C (87301805) | LF | 146 | $4.70 | $3.00 |
| 52 | Elcbl C egrdc 6 1C (87301900) | LF | 847 | $2.60 | $2.00 |
| 53 | TS post galvs 16 (87502500) | EACH | 2 | $2,611.00 | $3,000.00 |
| 54 | S maa & P 34 (87700210) | EACH | 1 | $17,165 | $20,000 |
| 55 | S maa & P 36 (87700220) | EACH | 1 | $19,198 | $21,000 |
| 56 | S maa & P 42 (87700250) | EACH | 1 | $19,474 | $23,000 |
| 57 | S maa & P 45 (87700265) | EACH | 1 | $20,484 | $24,000 |
| 58 | Conc FDN TY A (87800100) | LF | 12 | $337.80 | $560.00 |
| 59 | Conc FDN TY C (87800150) | LF | 4 | $904.50 | $3,350.00 |
| 60 | Conc FDN TY E 36D (87800415) | LF | 48 | $412.50 | $730.00 |
| 61 | SH LED 1F 3S mam (88030020) | EACH | 8 | $945.00 | $847.00 |
| 62 | SH LED 1F 3S BM (88030050) | EACH | 2 | $810.00 | $680.00 |
| 63 | SH LED 1F 5S BM (88030100) | EACH | 2 | $1,190.00 | $950.00 |
| 64 | SH LED 1F 5S mam (88030110) | EACH | 2 | $1,343.00 | $1,100.00 |
| 65 | Ped SH LED 1F BM CDT (88102717) | EACH | 8 | $639.00 | $660.00 |
| 66 | TS backplate ret-refl (88200510) | EACH | 10 | $342.00 | $220.00 |
| 67 | Inductive loop detect (88500100) | EACH | 10 | $200.00 | $200.00 |
| 68 | Det loop T1 (88600100) | LF | 751 | $24.80 | $44.00 |
| 69 | Light detector (88700200) | EACH | 2 | $1,390.00 | $1,400.00 |
| 70 | Light detector amp (88700300) | EACH | 1 | $2,035.00 | $2,300.00 |
| 71 | Temp TR sig install (89000100) | EACH | 1 | $32,993 | $150,000 |
| 72 | Remov EX TS equip (89502375) | EACH | 1 | $2,560.00 | $68,796 |
| 73 | Remov EX handhole (89502380) | EACH | 7 | $640.00 | $200.00 |
| 74 | Remov EX DBL handhole (89502382) | EACH | 1 | $960.00 | $400.00 |
| 75 | Remov EX conc FDN (89502385) | EACH | 9 | $640.00 | $300.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.