IDOT contract 62W61 bid tabulation

Section 2023-940-N,TS. Let by Illinois DOT on March 7, 2025, Various, District 01. 1 bid received; low bid $2,125,601 by H & H Electric Co..

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
114
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1H & H Electric Co.$2,125,601Low
IDOT contract 62W61: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. H & H Electric Co.
1Constructn layout SPL (X0320050)LS1$12,816
2EM veh P S LSC 20 3C (X0324085)LF2,580$1.07
3Rod and clean EX cond (X0324599)LF1,613$0.01
4Bike path rem (X0327036)SY25$25.59
5Relocate switch (X0327211)EACH1$762.37
6Outdr RTD NTWRK cable (X1400102)LF290$1.63
7Serv instl GR MT MTR (X1400150)EACH3$3,708.47
8Remote contr video SY (X1400215)EACH1$6,759.85
9Lyr II datalink SWTCH (X1400216)EACH1$6,132.20
10Term fiber in cabinet (X1400217)EACH8$439.20
11Ped signal post 10 FT (X1400367)EACH12$1,068.80
12Rel EX PTZ camera (X1400368)EACH1$1,437.50
13Ped signal post 5 FT (X1400378)EACH1$888.37
14CC&G RMVL repl > 10FT (X4400503)LF377$319.92
15Engrs FLD ofc TY A D1 (X6700407)CAL MO6$2,200.00
16Temp info signing (X7200061)SF205.60$13.62
17Fac T super P cab (X8570232)EACH1$36,192
18Fac T super P cab SP (X8570233)EACH3$36,192
19Uninter power sup SPL (X8620200)EACH4$5,959.44
20FOCC62.5/125 MM12SM24 (X8710024)LF2,947$4.74
21FO interct center 48P (X8710094)EACH3$2,584.80
22Splice fiber in cab (X8710317)EACH8$252.00
23Accessible ped signal (X8760200)EACH21$1,653.36
24Conc FDN TY A 12D (X8780012)LF52$278.48
25LED SF lens cover (X8809005)EACH75$118.08
26Vid veh det sys SN AP (X8891009)EACH3$10,856
27RE-optimize TR sig sys 1 (Z0033044)EACH4$864.00
28Trainees (Z0076600)HR500$0.80
29Trainees TPG (Z0076604)HR500$15.00
30Supple watering (20101700)UNIT7$31.50
31Earth excavation (20200100)CY56$12.80
32Topsoil F & P 4 (21101615)SY276$17.92
33Sodding salt tolerant (25200110)SY276$39.67
34Bit matls tack CT (40600290)LB75$0.01
35HMA SC IL-9.5 D N70 (40604062)TON18.80$511.87
36Protective coat (42001300)SY447$0.01
37PC conc sidewalk 5 (42400200)SF2,879$63.47
38Detectable warnings (42400800)SF256$51.19
39HMA surf rem 2 (44000157)SY167$63.98
40Sidewalk rem (44000600)SF2,073$1.28
41Inlets adjust (60260100)EACH2$319.92
42Non SPL waste disposl (66900200)CY170$1.00
43Soil disposal analy (66900530)EACH4$1,116.00
44Reg sub P-const plan (66901001)LS1$5,472.00
45Reg sub F con report (66901003)LS1$720.00
46Reg sub mon (66901006)CAL DAY16$1,152.00
47Mobilization (67100100)LS1$289,268
48TR cont & prot 701501 (70102620)LS1$141.40
49TR cont & prot 701606 (70102625)LS1$141.40
50TR cont & prot 701701 (70102635)LS1$13,291
51TR cont & prot 701801 (70102640)LS1$141.40
52Sign panel T1 (72000100)SF129$46.32
53Sign panel T2 (72000200)SF92$51.06
54THPL PVT MK line 6 (78000400)LF494$5.76
55THPL PVT MK line 12 (78000600)LF1,483$8.64
56THPL PVT MK line 24 (78000650)LF106$17.28
57PVT MKG rem WTR blast (78300202)SF756$5.04
58Undrgrd C galvs 2 (81028200)LF3,251$16.63
59Undrgrd C galvs 3 (81028220)LF555$57.19
60Undrgrd C galvs 4 (81028240)LF1,965$65.09
61Handhole (81400100)EACH8$1,923.31
62HD handhole (81400200)EACH12$3,206.74
63DBL handhole (81400300)EACH6$4,820.70
64Main EX TR sig instal (85000200)EACH6$2,827.95
65Transceiver - fib opt (86400100)EACH1$6,533.40
66Ground HH FR & cover (87300010)EACH6$239.67
67Elcbl C tracer 14 1C (87300925)LF2,914$0.24
68Elcbl C signal 14 2C (87301215)LF4,335$1.19
69Elcbl C signal 14 3C (87301225)LF6,930$1.35
70Elcbl C signal 14 5C (87301245)LF10,640$1.75
71Elcbl C signal 14 7C (87301255)LF5,020$2.14
72Elcbl C lead 14 1PR (87301305)LF8,605$1.35
73Elcbl C serv 6 2C (87301805)LF625$2.93
74Elcbl C egrdc 6 1C (87301900)LF3,930$1.82
75TS post 16 (87501200)EACH14$2,225.63
76S maa & P 24 (87700160)EACH2$10,461
77S maa & P 26 (87700170)EACH1$11,995
78S maa & P 28 (87700180)EACH1$12,403
79S maa & P 32 (87700200)EACH2$13,204
80S maa & P 36 (87700220)EACH1$14,489
81S maa & P 38 (87700230)EACH1$14,591
82S maa & P 42 (87700250)EACH1$15,870
83S maa & P 44 (87700260)EACH1$15,953
84S maa & P 46 (87700270)EACH1$16,940
85S maa & P 48 (87700280)EACH1$17,029
86S maa & P 50 (87700290)EACH1$17,256
87S maa & P 55 (87700320)EACH1$18,024
88S maa & P 62 (87700404)EACH1$22,067
89STL comb maa&P 42 (87702940)EACH2$21,285
90STL comb maa&P 62 (87703040)EACH1$27,253
91Conc FDN TY A (87800100)LF68$322.72
92Conc FDN TY C (87800150)LF16$1,021.15
93Conc FDN TY E 30D (87800400)LF94$271.62
94Conc FDN TY E 36D (87800415)LF108$368.26
95Conc FDN TY E 42D (87800420)LF42$507.59
96Drill EX handhole (87900200)EACH36$444.08
97SH LED 1F 3S mam (88030020)EACH34$826.72
98SH LED 1F 3S BM (88030050)EACH19$716.24
99SH LED 1F 5S BM (88030100)EACH9$972.60
100SH LED 1F 5S mam (88030110)EACH13$1,189.97
101Ped SH LED 1F BM CDT (88102717)EACH20$697.77
102TS backplate L F plas (88200410)EACH47$223.46
103Inductive loop detect (88500100)EACH32$213.22
104Det loop T1 (88600100)LF2,062$18.38
105Reloc EX TS equip (89501250)EACH1$632.77
106Rel EM veh PR sys D U (89501400)EACH11$289.30
107Rel EM veh PR sys P U (89501410)EACH4$141.40
108Rem elcbl FR con (89502300)LF4,470$0.71
109Rem & RE elcbl FR con (89502350)LF780$3.39
110Remov EX TS equip (89502375)EACH4$5,783.86
111Rebuild EX handhole (89502376)EACH2$1,921.89
112Remov EX handhole (89502380)EACH17$440.19
113Remov EX DBL handhole (89502382)EACH2$456.18
114Remov EX conc FDN (89502385)EACH2$448.19
IDOT contract 62W61: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy