IDOT contract 70H51 bid tabulation
Section HMLT2025-1. Let by Illinois DOT on September 19, 2025, Mclean, District 05. 5 bids received; low bid $869,829 by Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC.
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 26
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC | $869,829 | Low |
| 2 | Bodine Electric of Decatur | $909,013 | +5.0% |
| 3 | Gerstner Electric, Inc. | $942,500 | +8.0% |
| 4 | Capitol Construction Group, LLC d/b/a Egizii Electric | $1,013,045 | +16% |
| 5 | John Burns Construction Company | $1,391,584 | +60% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC | 2. Bodine Electric of Decatur | 3. Gerstner Electric, Inc. | 4. Capitol Construction Group, LLC d/b/a Egizii Electric | 5. John Burns Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Rem tower FDN (X8420510) | EACH | 5 | $1,500.00 | $6,732.00 | $1,615.00 | $936.00 | $3,000.00 |
| 2 | Elcbl C signal 10 3C (X8730105) | LF | 697 | $5.00 | $17.50 | $4.40 | $3.54 | $5.00 |
| 3 | Rem EX undrgrd C (X8950450) | LF | 70 | $15.00 | $40.95 | $10.00 | $15.60 | $65.00 |
| 4 | Construction layout (Z0013798) | LS | 1 | $7,500.00 | $11,220 | $1.00 | $9,000.00 | $10,000 |
| 5 | Mobilization (67100100) | LS | 1 | $50,000 | $10,771 | $87,432 | $12,000 | $83,000 |
| 6 | Traf cont-prot 701421 (70100310) | LS | 1 | $7,500.00 | $1,997.16 | $1.00 | $4,800.00 | $10,000 |
| 7 | Traf cont-prot 701406 (70100700) | LS | 1 | $7,500.00 | $2,232.78 | $1.00 | $7,200.00 | $100.00 |
| 8 | Traf cont-prot 701456 (70100825) | LS | 1 | $5,000.00 | $2,939.64 | $1.00 | $4,320.00 | $100.00 |
| 9 | TR cont & prot 701701 (70102635) | LS | 1 | $7,500.00 | $1,166.88 | $1.00 | $4,320.00 | $100.00 |
| 10 | Elect serv install (80400100) | EACH | 2 | $7,500.00 | $7,567.89 | $10,220 | $5,808.00 | $11,000 |
| 11 | Elect util serv conn (80400200) | LS | 1 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 |
| 12 | Undrgrd C galvs 4 (81028240) | LF | 220 | $50.00 | $120.90 | $60.65 | $94.80 | $135.00 |
| 13 | Undrgrd C CNC 2 (81028750) | LF | 1,030 | $20.00 | $29.17 | $24.60 | $33.96 | $55.00 |
| 14 | UD 2#8 #8G xlpuse 3/4 (81603000) | LF | 14,355 | $11.00 | $9.73 | $11.90 | $17.28 | $20.00 |
| 15 | Lum LED rdwy G (82110007) | EACH | 61 | $850.00 | $768.57 | $655.00 | $906.00 | $2,000.00 |
| 16 | LT cont pedm 240V 60 (82500330) | EACH | 2 | $18,000 | $12,740 | $12,005 | $13,296 | $29,000 |
| 17 | LT P A 45MH 15DA (83003600) | EACH | 61 | $5,000.00 | $4,724.74 | $5,105.00 | $5,568.00 | $6,750.00 |
| 18 | LP F M 15BC 8 5/8X6 (83600356) | EACH | 61 | $1,100.00 | $1,457.84 | $1,530.00 | $1,308.00 | $2,000.00 |
| 19 | Bkwy dev cou SS SCRN (83800650) | EACH | 244 | $160.00 | $166.34 | $245.00 | $222.00 | $225.00 |
| 20 | Rem LT U no salv (84200600) | EACH | 27 | $500.00 | $757.35 | $770.00 | $624.00 | $800.00 |
| 21 | Rem LT TWR no sal (84200605) | EACH | 5 | $1,000.00 | $10,322 | $5,055.00 | $7,872.00 | $4,000.00 |
| 22 | Rem pole FDN (84200804) | EACH | 27 | $750.00 | $875.16 | $975.00 | $624.00 | $1,000.00 |
| 23 | Remov lighting contr (84500110) | EACH | 2 | $500.00 | $544.17 | $350.00 | $675.00 | $1,000.00 |
| 24 | Remov elect serv inst (84500120) | EACH | 2 | $1,000.00 | $802.23 | $350.00 | $936.00 | $1,000.00 |
| 25 | Remov LTG contr FDN (84500130) | EACH | 1 | $1,000.00 | $841.50 | $675.00 | $625.00 | $2,000.00 |
| 26 | Rem elcbl FR con (89502300) | LF | 33,098 | $0.50 | $0.58 | $0.01 | $0.16 | $0.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.