Capitol Construction Group, LLC d/b/a Egizii Electric: IDOT bid record
Capitol Construction Group, LLC d/b/a Egizii Electric submitted 26 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 19 of them (73%). When it was not low, its total sat a median +4.0% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $8,196,772
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 6 | 4 | 67% |
| 2022 | 3 | 2 | 67% |
| 2023 | 1 | 1 | 100% |
| 2024 | 5 | 4 | 80% |
| 2025 | 4 | 2 | 50% |
| 2026 | 7 | 6 | 86% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 06 | 22 | 18 | 82% |
| District 07 | 3 | 1 | 33% |
| District 05 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fib opt CBL 24F SM | X8710029 | LF | 9 | 9 (100%) | $2.04 | $5.45 |
| Cobalt controller | X1400076 | EACH | 9 | 8 (89%) | $5,000.00 | $5,000.00 |
| Undrgrd C PVC 1 1/2 | 81028340 | LF | 8 | 7 (88%) | $10.26 | $30.00 |
| Lum LED rdwy G | 82110007 | EACH | 11 | 6 (55%) | $672.84 | $907.50 |
| Pick-UP truck | XP000009 | HR | 6 | 6 (100%) | $22.50 | $20.00 |
| Bucket truck 35-65 | XP000011 | HR | 6 | 6 (100%) | $50.00 | $60.00 |
| Journey elect SU/H OT | XP000005 | HR | 6 | 6 (100%) | $175.00 | $220.00 |
| Remov LTG contr FDN | 84500130 | EACH | 5 | 5 (100%) | $635.00 | $900.00 |
| Drill EX handhole | 87900200 | EACH | 8 | 4 (50%) | $437.16 | $465.00 |
| Luminaire MT BRKT SPL | X8210402 | EACH | 6 | 4 (67%) | $352.64 | $410.00 |
| Journey elect W OT | XP000003 | HR | 6 | 4 (67%) | $152.50 | $176.00 |
| Journey elect sat OT | XP000004 | HR | 6 | 4 (67%) | $152.50 | $185.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Bodine Electric of Decatur | 21 | 7 of 21 |
| Gerstner Electric, Inc. | 3 | 1 of 3 |
| Wissehr Electric, Inc. | 1 | 0 of 1 |
| Laser Electric, Inc. | 1 | 0 of 1 |
| Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC | 1 | 1 of 1 |
| John Burns Construction Company | 1 | 0 of 1 |
| RoadSafe Traffic Systems, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 72E81 | District 06 | Section D6 | 1 of 1 | $279,735 | Low |
| 12 JUN 2026 | 72509 | District 06 | Section (54-1,2)HL-1 | 2 of 2 | $609,405 | +7.0% |
| 24 APR 2026 | 72636 | District 06 | Section D6 | 1 of 2 | $136,750 | Low, 328% under the second |
| 24 APR 2026 | 72E74 | District 06 | Section (1-15D)I, | 1 of 1 | $80,800 | Low |
| 24 APR 2026 | 72F51 | District 06 | Section D6 | 1 of 1 | $511,575 | Low |
| 24 APR 2026 | 72F52 | District 06 | Section D6 | 1 of 2 | $273,790 | Low, 26% under the second |
| 16 JAN 2026 | 74D37 | District 07 | Section D7 | 1 of 3 | $331,606 | Low, 37% under the second |
| 19 SEP 2025 | 70H51 | District 05 | Section HMLT2025-1 | 4 of 5 | $1,013,045 | +16% |
| 19 SEP 2025 | 72977 | District 06 | Section (54-1,2)HL | 2 of 2 | $415,009 | +4.0% |
| 07 MAR 2025 | 72590 | District 06 | Section D6 | 1 of 1 | $141,700 | Low |
| 07 MAR 2025 | 72602 | District 06 | Section D6 | 1 of 2 | $535,685 | Low, 6.0% under the second |
| 14 JUN 2024 | 72733 | District 06 | Section D6 | 1 of 2 | $644,276 | Low, 13% under the second |
| 14 JUN 2024 | 72734 | District 06 | Section D6 | 1 of 2 | $1,181,733 | Low, 37% under the second |
| 26 APR 2024 | 72735 | District 06 | Section D6 | 1 of 2 | $303,500 | Low, 44% under the second |
| 26 APR 2024 | 72E36 | District 06 | Section D6 | 1 of 2 | $510,682 | Low, 21% under the second |
| 26 APR 2024 | 74C82 | District 07 | Section D7 | 2 of 2 | $671,170 | +23% |
| 10 MAR 2023 | 72704 | District 06 | Section D6 | 1 of 2 | $363,146 | Low, 36% under the second |
| 18 NOV 2022 | 72246 | District 06 | Section D6 | 1 of 2 | $849,020 | Low, 56% under the second |
| 29 APR 2022 | 72808 | District 06 | Section D6 | 2 of 3 | $493,875 | +1.0% |
| 29 APR 2022 | 72856 | District 06 | Section D6 | 1 of 2 | $190,640 | Low, 55% under the second |
| 30 JUL 2021 | 93771 | District 06 | Project Number: 7317-240 / /, section 18-00073-03-SP | 1 of 3 | $28,864 | Low, 37% under the second |
| 23 APR 2021 | 72M57 | District 06 | Section (6)TS-2,SW | 1 of 2 | $854,122 | Low, 6.0% under the second |
| 23 APR 2021 | 74A49 | District 07 | Section D7 | 2 of 2 | $174,547 | +3.0% |
| 05 MAR 2021 | 72M63 | District 06 | Section D6 | 1 of 2 | $287,541 | Low, 3.0% under the second |
| 05 MAR 2021 | 72M64 | District 06 | Section D6 | 2 of 2 | $86,181 | +1.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.