Hoerr Construction, Inc.: IDOT bid record

Hoerr Construction, Inc. submitted 12 bids on Illinois DOT contracts in the data, from 17 SEP 2021 to 27 FEB 2026, and was the low bidder on 8 of them (67%). When it was not low, its total sat a median +32% above the low bid.

Owner
Illinois DOT
Low bid volume
$4,095,527
Latest bid
27 FEB 2026
Data through
18 SEP 2026
12Bids
8Low bids
67Win rate, percent
+32%Median gap to the low bid when not low, 4 bids

By year

YearBidsLow bidsWin rate
2021100%
20223133%
202344100%
202411100%
202522100%
2026100%
Hoerr Construction, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0610660%
District 0211100%
District 0411100%
Hoerr Construction, Inc., IDOT: bids and low bids by district

Who it meets most

FirmContracts in commonThat firm ranked ahead
Phoenix Corporation of the Quad Cities53 of 5
National Power Rodding Corporation30 of 3
J.C. Dillon, Inc.31 of 3
Benchmark Construction Co., Inc.10 of 1
Kinney Contractors, Inc.10 of 1
Hoerr Construction, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
27 FEB 202672546District 06Section (84-9-3,84-10)I-22 of 2$644,964+16%
19 SEP 202568J20District 04Section D41 of 1$1,852,445Low
17 JAN 202572770District 06Section D61 of 4$561,200Low, 20% under the second
19 JAN 202464S84District 02Section 1CR1 of 3$101,460Low, 25% under the second
17 NOV 202372717District 06Section D61 of 1$567,640Low
16 JUN 202372114District 06Section 112DR1 of 1$120,600Low
16 JUN 202372115District 06Section (1-5)DR1 of 2$77,640Low, 0.0% under the second
16 JUN 202372707District 06Section 34-2DR1 of 1$212,810Low
17 JUN 202272N25District 06Section D62 of 2$803,800+10%
17 JUN 202272N27District 06Section D62 of 3$972,335+49%
21 JAN 202272N19District 06Section D61 of 3$601,732Low, 31% under the second
17 SEP 202172N16District 06Section 3DR2 of 2$305,156+87%
Hoerr Construction, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy