IDOT contract 72770 bid tabulation

Section D6. Let by Illinois DOT on January 17, 2025, Logan, District 06. 4 bids received; low bid $561,200 by Hoerr Construction, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
5
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Hoerr Construction, Inc.$561,200Low
2J.C. Dillon, Inc.$674,472+20%
3Phoenix Corporation of the Quad Cities$756,522+35%
4National Power Rodding Corporation$2,948,100+425%
IDOT contract 72770: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hoerr Construction, Inc.2. J.C. Dillon, Inc.3. Phoenix Corporation of the Quad Cities4. National Power Rodding Corporation
1Cur-in-PL pipe LNR 18 (X5430218)LF90$259.00$207.00$193.00$1,100.00
2Cur-in-PL pipe LNR 24 (X5430224)LF180$185.00$194.00$216.00$1,200.00
3Cur-in-PL pipe LNR 36 (X5430236)LF1,447$290.00$326.00$296.00$1,300.00
4Cur-in-PL pipe LNR 42 (X5430242)LF180$337.00$365.00$597.00$1,400.00
5Mobilization (67100100)LS1$24,300$83,500$164,500$500,000
IDOT contract 72770: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy