MAT Construction Leasing, Inc.: IDOT bid record

MAT Construction Leasing, Inc. submitted 28 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 16 JAN 2026, and was the low bidder on 17 of them (61%). When it was not low, its total sat a median +14% above the low bid.

Owner
Illinois DOT
Low bid volume
$24,580,512
Latest bid
16 JAN 2026
Data through
18 SEP 2026
28Bids
17Low bids
61Win rate, percent
+14%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
202111873%
20225240%
202344100%
20244125%
20253133%
202611100%
MAT Construction Leasing, Inc., IDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
HMA surf rem butt JT40600982SY2523 (92%)$3.00$16.50
SHRT TRM pavt MK rem70300150SF2321 (91%)$1.00$1.20
Sidewalk rem44000600SF2420 (83%)$2.12$3.00
THPL PVT MK LTR & sym78000100SF2519 (76%)$4.75$5.75
THPL PVT MK line 2478000650LF2618 (69%)$4.65$6.00
FR & lids adjust SPLX6030310EACH2318 (78%)$675.00$1,150.00
Non SPL waste disposl66900200CY2118 (86%)$70.00$92.99
THPL PVT MK line 678000400LF2617 (65%)$1.10$1.40
Comb C&G remov repl < = 10FTX4400501LF1817 (94%)$39.00$55.00
THPL PVT MK line 478000200LF2615 (58%)$0.68$0.88
THPL PVT MK line 1278000600LF2315 (65%)$2.23$3.10
PC conc sidewalk 542400200SF2215 (68%)$9.00$10.00
MAT Construction Leasing, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

MAT Construction Leasing, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
16 JAN 202662321District 01Section 2001-142RS1 of 2$548,280Low, 5.0% under the second
13 JUN 202562V14District 01Section FAU1 of 4$2,054,601Low, 11% under the second
13 JUN 202562X71District 01Section 2024-1027-RS2 of 2$1,599,237+4.0%
25 APR 202562V61District 01Section FAU2 of 3$5,685,304+8.0%
08 NOV 202461K69District 01Forest View, section 23-00020-00-RS3 of 4$732,737+9.0%
14 JUN 202462L00District 01Section 2020-029-RS&SW1 of 3$1,805,126Low, 6.0% under the second
26 APR 202462R43District 01Section FAU3 of 4$991,985+14%
08 MAR 202462W04District 01Section FAI5 of 5$741,779+42%
04 AUG 202362T93District 01Section FAP1 of 4$571,193Low, 5.0% under the second
16 JUN 202362L51District 01Section 2020-073-RS1 of 3$755,754Low, 14% under the second
20 JAN 202362N79District 01Section 2021-047-RS1 of 6$3,816,869Low, 12% under the second
20 JAN 202362U04District 01Section FAP1 of 2$1,284,283Low, 13% under the second
17 JUN 202262N72District 01Section 2021-011-RS-SR&SW4 of 4$4,072,051+17%
29 APR 202262G71District 01Section 2018-019-RS-SW1 of 2$1,320,682Low, 9.0% under the second
11 MAR 202262J65District 01Section 2019-121-RS&SW1 of 1$1,768,897Low
11 MAR 202262M44District 01Section 2020-156-RS&SW2 of 4$2,065,889+3.0%
21 JAN 202262N71District 01Section 2021-012-RS&SW2 of 3$778,057+6.0%
05 NOV 202162L12District 01Section 2020-040-RS4 of 5$1,711,277+19%
05 NOV 202162M19District 01Section 2020-141-RS1 of 4$3,699,988Low, 1.0% under the second
17 SEP 202162L67District 01Section 2020-089-RS&SW1 of 3$904,416Low, 12% under the second
30 JUL 202160M12District 01Section 2010-098-RS1 of 5$347,601Low, 9.0% under the second
11 JUN 202162L20District 01Section 2020-048-RS&SW1 of 3$613,640Low, 8.0% under the second
11 JUN 202162L63District 01Section 2020-085-RS1 of 2$724,432Low, 22% under the second
11 JUN 202162L80District 01Section 2020-102-RS1 of 3$2,139,433Low, 4.0% under the second
05 MAR 202162L54District 01Section 2020-076-RS&SW4 of 4$993,552+30%
MAT Construction Leasing, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way