IDOT contract 62V14 bid tabulation

Section FAU. Let by Illinois DOT on June 13, 2025, Cook, District 01. 4 bids received; low bid $2,054,601 by MAT Construction Leasing, Inc..

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
63
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1MAT Construction Leasing, Inc.$2,054,601Low
2Bigane Paving Company$2,285,921+11%
3Gallagher Asphalt Corporation$2,465,063+20%
4K-Five Construction Corporation$2,524,605+23%
IDOT contract 62V14: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. MAT Construction Leasing, Inc.2. Bigane Paving Company3. Gallagher Asphalt Corporation4. K-Five Construction Corporation
1Constructn layout SPL (X0320050)LS1$5,000.00$20,000$8,000.00$10,000
2Structure adj (X0326862)EACH8$550.00$650.00$550.00$550.00
3Temporary ramp SPL (X4060995)SY703$5.00$25.00$25.00$25.00
4PC conc sidewalk 5 SP (X4240430)SF30$18.00$30.00$18.00$18.00
5Detectable warn SPL (X4240800)SF220$50.00$40.00$50.00$50.00
6CC&G RMVL repl < = 10 (X4400501)LF40$75.00$85.00$75.00$75.00
7CC&G RMVL repl > 10FT (X4400503)LF626$45.00$53.00$45.00$45.00
8SS cleaned 12 (X5537800)LF2,775$3.00$5.00$2.00$2.00
9FR & lids adjust SPL (X6030310)EACH90$1,000.00$905.00$1,000.00$1,000.00
10Engrs FLD ofc TY A D1 (X6700407)CAL MO12$2,500.00$4,000.00$500.00$3,300.00
11TR C-prot expressways (X7011015)LS1$5,800.00$43,000$10,000$6,000.00
12Temp info signing (X7200061)SF591.10$15.00$20.00$15.00$17.00
13Drainage STR cleaned (Z0018500)EACH82$400.00$500.00$320.00$320.00
14RR prot liability ins (Z0048665)LS1$7,500.00$10,000$9,300.00$8,000.00
15Earth excavation (20200100)CY25$80.00$52.00$100.00$100.00
16Topsoil F & P 4 (21101615)SY93$8.00$15.00$50.00$29.00
17Sodding salt tolerant (25200110)SY99$13.00$30.00$50.00$65.00
18Supple watering (25200200)UNIT1$100.00$100.00$500.00$50.00
19Bit matls tack CT (40600290)LB29,519$0.80$1.25$0.01$0.01
20Long joint sealant (40600370)LF5,672$3.43$4.00$4.00$8.95
21Mix CR JTS flangewys (40600400)TON66$125.00$375.00$350.00$50.00
22HMA surf rem butt JT (40600982)SY1,581$6.20$40.00$0.01$0.01
23HMA repl over patch (40601005)TON588$93.65$146.00$140.00$150.00
24HMA BC IL-9.5 N70 (40602985)TON4,333$99.00$90.00$110.00$128.50
25HMA BC IL-19.0 N70 (40603085)TON539$93.65$88.00$122.00$130.00
26HMA SC IL-9.5 D N70 (40604062)TON4,226$99.00$90.00$110.00$120.00
27Protective coat (42001300)SY465$2.00$1.00$2.00$2.00
28PC conc sidewalk 5 (42400200)SF2,810$10.00$10.00$10.00$10.00
29HMA surf rem 3 3/4 (44000164)SY43,732$6.20$5.50$8.00$8.00
30Sidewalk rem (44000600)SF1,674$2.00$3.50$2.00$2.00
31HMA RM OV patch 4 (44002216)SY3,080$6.60$20.00$20.00$0.75
32CL D patch T2 10 (44201765)SY700$107.00$98.00$150.00$50.00
33CL D patch T3 10 (44201769)SY1,400$107.00$98.00$120.00$50.00
34CL D patch T4 10 (44201771)SY700$107.00$98.00$100.00$50.00
35FR & lids adjust (60300305)EACH4$650.00$500.00$650.00$650.00
36FR & lids T1 OL (60406000)EACH2$450.00$500.00$450.00$450.00
37FR & lids T1 CL (60406100)EACH2$450.00$500.00$450.00$450.00
38Non SPL waste disposl (66900200)CY25$80.00$140.00$135.00$125.00
39Soil disposal analy (66900530)EACH2$1,680.00$1,680.00$1,700.00$1,680.00
40Reg sub P-const plan (66901001)LS1$3,400.00$3,400.00$3,400.00$3,400.00
41Reg sub F con report (66901003)LS1$500.00$500.00$500.00$500.00
42Reg sub mon (66901006)CAL DAY15$700.00$700.00$700.00$700.00
43Mobilization (67100100)LS1$35,000$123,000$147,000$151,000
44TR cont & prot 701501 (70102620)LS1$14,200$1.00$70,000$91,000
45TR cont & prot 701606 (70102625)LS1$1.00$12,000$1.00$10,000
46TR cont & prot 701611 (70102634)LS1$1.00$1.00$1.00$100,000
47TR cont & prot 701701 (70102635)LS1$1.00$1.00$1.00$10,000
48TR cont & prot 701801 (70102640)LS1$1.00$1.00$1.00$10,000
49Short term pavt mking (70300100)LF1,659$1.00$2.00$1.50$1.00
50SHRT TRM pavt MK rem (70300150)SF553$5.00$4.00$8.00$2.00
51Temp PVT MK LTR & sym paint (70300211)SF1,625$1.20$1.75$0.01$0.01
52Temp PVT MK line 4 - paint (70300221)LF19,404$0.30$0.25$0.01$0.01
53Temp PVT MK line 6 - paint (70300241)LF2,978$0.45$0.50$0.01$0.01
54Temp PVT MK line 8 - paint (70300251)LF1,964$0.60$0.75$0.01$0.01
55Temp PVT MK line 12 - paint (70300261)LF26,920$1.00$0.85$0.01$0.01
56Temp PVT MK line 24 - paint (70300281)LF17,691$0.50$1.50$0.01$0.01
57THPL PVT MK LTR & sym (78000100)SF542$5.00$5.00$5.00$5.00
58THPL PVT MK line 4 (78000200)LF6,468$0.65$1.00$0.65$0.65
59THPL PVT MK line 6 (78000400)LF993$1.25$1.50$1.25$1.25
60THPL PVT MK line 8 (78000500)LF655$1.50$1.60$1.50$1.50
61THPL PVT MK line 12 (78000600)LF8,973$1.95$2.00$1.95$1.95
62THPL PVT MK line 24 (78000650)LF5,897$4.00$4.00$4.00$4.00
63Raised ref PVT MK rem (78300200)EACH36$1.00$20.00$25.00$20.00
IDOT contract 62V14: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy