IDOT contract 62V61 bid tabulation
Section FAU. Let by Illinois DOT on April 25, 2025, Cook, District 01. 3 bids received; low bid $5,275,535 by K-Five Construction Corporation.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 136
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | K-Five Construction Corporation | $5,275,535 | Low |
| 2 | MAT Construction Leasing, Inc. | $5,685,304 | +8.0% |
| 3 | Gallagher Asphalt Corporation | $6,954,796 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. K-Five Construction Corporation | 2. MAT Construction Leasing, Inc. | 3. Gallagher Asphalt Corporation |
|---|---|---|---|---|---|---|
| 1 | P PL ornament T gal P (K0012990) | UNIT | 2.50 | $2,625.00 | $2,500.00 | $2,600.00 |
| 2 | Perennial plant care (K0026850) | SY | 300 | $24.00 | $15.00 | $23.80 |
| 3 | Mulch placement 4 (K0036120) | SY | 255 | $11.00 | $15.00 | $15.00 |
| 4 | Constructn layout SPL (X0320050) | LS | 1 | $15,000 | $5,000.00 | $12,200 |
| 5 | EM veh P S LSC 20 3C (X0324085) | LF | 507 | $2.67 | $3.18 | $4.00 |
| 6 | Weed CNTRL total vegn (X0325896) | GAL | 0.25 | $4,000.00 | $7,000.00 | $15,000 |
| 7 | Temp wir intercon com (X0325938) | LS | 1 | $13,308 | $11,230 | $57,500 |
| 8 | Rem & rein bric paver (X0327611) | SF | 644 | $25.00 | $32.00 | $40.00 |
| 9 | Stamped asp crosswalk (X0328634) | SY | 20 | $425.00 | $425.00 | $450.00 |
| 10 | Serv instl GR MT MTR (X1400150) | EACH | 7 | $7,943.47 | $5,340.13 | $8,600.00 |
| 11 | Ped signal post 10 FT (X1400367) | EACH | 12 | $1,598.12 | $1,447.78 | $4,000.00 |
| 12 | Ped signal post 5 FT (X1400378) | EACH | 10 | $1,248.26 | $1,227.78 | $3,300.00 |
| 13 | Tree limb rem over 10 (X2010200) | EACH | 1 | $110.00 | $150.00 | $380.00 |
| 14 | PC conc sidewalk 8 SP (X4240460) | SF | 80 | $14.00 | $14.00 | $27.10 |
| 15 | Detectable warn SPL (X4240800) | SF | 530 | $45.00 | $45.00 | $70.50 |
| 16 | PCC surf rem var DP (X4400100) | SY | 170 | $3.15 | $4.15 | $15.10 |
| 17 | CC&G RMVL repl < = 10 (X4400501) | LF | 469 | $55.00 | $55.00 | $70.00 |
| 18 | CC&G RMVL repl > 10FT (X4400503) | LF | 4,794 | $40.00 | $40.00 | $70.00 |
| 19 | HMA surf rem var DP (X4401198) | SY | 17,227 | $3.00 | $3.35 | $4.20 |
| 20 | SS cleaned 12 (X5537800) | LF | 495 | $1.00 | $3.00 | $1.20 |
| 21 | FR & lids adjust SPL (X6030310) | EACH | 21 | $1,100.00 | $1,000.00 | $1,425.00 |
| 22 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 12 | $3,300.00 | $2,500.00 | $3,800.00 |
| 23 | Temp info signing (X7200061) | SF | 803 | $17.00 | $15.00 | $18.50 |
| 24 | Rebld EX DBL handhole (X8140238) | EACH | 4 | $4,280.74 | $8,023.76 | $18,280 |
| 25 | Fac T4 cab SPL (X8570226) | EACH | 2 | $30,152 | $35,646 | $85,000 |
| 26 | Uninter PS cab SPL (X8620250) | EACH | 2 | $8,197.97 | $9,105.43 | $28,500 |
| 27 | Accessible ped signal (X8760200) | EACH | 48 | $1,847.32 | $2,910.53 | $3,800.00 |
| 28 | Conc FDN TY A 12D (X8780012) | LF | 88 | $356.07 | $620.74 | $650.00 |
| 29 | LED SF lens cover (X8809005) | EACH | 36 | $393.93 | $737.64 | $975.00 |
| 30 | Vid veh det sys SN AP (X8891009) | EACH | 2 | $12,633 | $13,912 | $27,000 |
| 31 | Drainage STR cleaned (Z0018500) | EACH | 33 | $318.00 | $400.00 | $350.00 |
| 32 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 7 | $787.50 | $630.00 | $6,500.00 |
| 33 | Tree remov 6-15 (20100110) | UNIT | 25 | $30.00 | $45.00 | $120.00 |
| 34 | Earth excavation (20200100) | CY | 160 | $85.00 | $80.00 | $59.60 |
| 35 | Topsoil F & P 4 (21101615) | SY | 1,795 | $6.00 | $8.00 | $10.80 |
| 36 | Sodding salt tolerant (25200110) | SY | 1,795 | $18.00 | $13.00 | $23.80 |
| 37 | Supple watering (25200200) | UNIT | 23 | $0.01 | $100.00 | $1.10 |
| 38 | HMA base cse 6 (35501308) | SY | 34 | $85.00 | $55.00 | $75.50 |
| 39 | HMA base cse 8 (35501316) | SY | 39 | $110.00 | $77.00 | $95.50 |
| 40 | Bit matls tack CT (40600290) | LB | 59,920 | $0.01 | $0.80 | $0.95 |
| 41 | Long joint sealant (40600370) | LF | 49,185 | $2.57 | $2.44 | $2.85 |
| 42 | Mix CR JTS flangewys (40600400) | TON | 267 | $50.00 | $150.00 | $75.00 |
| 43 | HMA surf rem butt JT (40600982) | SY | 1,287 | $0.01 | $4.15 | $33.00 |
| 44 | HMA repl over patch (40601005) | TON | 714 | $55.00 | $100.00 | $253.00 |
| 45 | P HMA BC IL-4.75 N50 (40603200) | TON | 2,978 | $127.00 | $142.00 | $108.00 |
| 46 | HMA SC IL-9.5 D N50 (40604060) | TON | 9 | $285.00 | $100.00 | $205.00 |
| 47 | P HMA SC SMA 9.5 F N80 (40605026) | TON | 9,123 | $123.00 | $135.00 | $121.50 |
| 48 | Protective coat (42001300) | SY | 3,090 | $2.00 | $2.00 | $3.25 |
| 49 | PCC driveway pavt 6 (42300200) | SY | 30 | $100.00 | $100.00 | $157.00 |
| 50 | PCC driveway pavt 8 (42300400) | SY | 156 | $110.00 | $110.00 | $178.00 |
| 51 | PC conc sidewalk 5 (42400200) | SF | 8,041 | $8.50 | $8.50 | $15.00 |
| 52 | PC conc sidewalk 8 (42400410) | SF | 4,310 | $10.00 | $10.00 | $17.00 |
| 53 | Detectable warnings (42400800) | SF | 338 | $40.00 | $40.00 | $59.00 |
| 54 | HMA surf rem 2 1/2 (44000159) | SY | 71,543 | $3.45 | $4.15 | $3.65 |
| 55 | Drive pavement rem (44000200) | SY | 258 | $45.00 | $35.00 | $32.50 |
| 56 | Sidewalk rem (44000600) | SF | 12,588 | $2.50 | $2.50 | $4.30 |
| 57 | HMA RM OV patch 4 1/2 (44002218) | SY | 3,511 | $3.00 | $7.50 | $0.01 |
| 58 | CL D patch T1 10 (44201761) | SY | 4 | $80.00 | $113.00 | $700.00 |
| 59 | CL D patch T2 10 (44201765) | SY | 133 | $80.00 | $112.00 | $192.00 |
| 60 | CL D patch T3 10 (44201769) | SY | 157 | $80.00 | $111.00 | $160.00 |
| 61 | CL D patch T4 10 (44201771) | SY | 1,136 | $80.00 | $110.00 | $113.00 |
| 62 | CB reconst (60252800) | EACH | 4 | $3,000.00 | $2,000.00 | $1,900.00 |
| 63 | Valve box adj (60266600) | EACH | 1 | $300.00 | $300.00 | $1,080.00 |
| 64 | FR & grates adjust (60300105) | EACH | 25 | $550.00 | $500.00 | $1,080.00 |
| 65 | FR & lids adjust (60300305) | EACH | 4 | $450.00 | $450.00 | $1,080.00 |
| 66 | FR & grates T24 (60404950) | EACH | 1 | $650.00 | $650.00 | $1,025.00 |
| 67 | FR & lids T1 OL (60406000) | EACH | 3 | $500.00 | $500.00 | $650.00 |
| 68 | Non SPL waste disposl (66900200) | CY | 160 | $110.00 | $70.00 | $109.00 |
| 69 | Soil disposal analy (66900530) | EACH | 3 | $1,450.00 | $950.00 | $1,030.00 |
| 70 | Reg sub P-const plan (66901001) | LS | 1 | $3,100.00 | $4,900.00 | $5,310.00 |
| 71 | Reg sub F con report (66901003) | LS | 1 | $1,200.00 | $500.00 | $540.00 |
| 72 | Reg sub mon (66901006) | CAL DAY | 15 | $680.00 | $700.00 | $750.00 |
| 73 | Mobilization (67100100) | LS | 1 | $316,000 | $435,000 | $413,000 |
| 74 | TR cont & prot 701606 (70102625) | LS | 1 | $96,000 | $1.00 | $6,500.00 |
| 75 | TR cont & prot 701602 (70102632) | LS | 1 | $88,000 | $1.00 | $5,100.00 |
| 76 | TR cont & prot 701611 (70102634) | LS | 1 | $92,000 | $1.00 | $5,400.00 |
| 77 | TR cont & prot 701701 (70102635) | LS | 1 | $98,000 | $1.00 | $7,000.00 |
| 78 | TR cont & prot 701801 (70102640) | LS | 1 | $107,000 | $27,400 | $7,000.00 |
| 79 | Short term pavt mking (70300100) | LF | 71,379 | $0.01 | $0.95 | $0.05 |
| 80 | SHRT TRM pavt MK rem (70300150) | SF | 29,741 | $0.01 | $1.00 | $0.05 |
| 81 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,977 | $1.15 | $1.10 | $0.05 |
| 82 | Temp PVT MK line 4 - paint (70300221) | LF | 163,782 | $0.01 | $0.25 | $0.05 |
| 83 | Temp PVT MK line 6 - paint (70300241) | LF | 17,928 | $0.01 | $0.38 | $0.05 |
| 84 | Temp PVT MK line 12 - paint (70300261) | LF | 8,649 | $0.01 | $0.70 | $0.05 |
| 85 | Temp PVT MK line 24 - paint (70300281) | LF | 3,450 | $0.01 | $1.10 | $0.05 |
| 86 | Temp PVT MK L4 T4 tape (70307120) | LF | 17,845 | $0.01 | $1.35 | $0.05 |
| 87 | Sign panel T1 (72000100) | SF | 54 | $55.00 | $72.00 | $59.00 |
| 88 | THPL PVT MK LTR & sym (78000100) | SF | 659 | $5.25 | $4.50 | $6.20 |
| 89 | THPL PVT MK line 4 (78000200) | LF | 54,594 | $0.70 | $0.68 | $1.05 |
| 90 | THPL PVT MK line 6 (78000400) | LF | 5,976 | $1.30 | $1.11 | $1.30 |
| 91 | THPL PVT MK line 12 (78000600) | LF | 2,883 | $2.65 | $2.25 | $3.60 |
| 92 | THPL PVT MK line 24 (78000650) | LF | 1,150 | $5.25 | $4.75 | $6.20 |
| 93 | Raised refl pavt MKR (78100100) | EACH | 565 | $39.75 | $39.75 | $41.00 |
| 94 | Raised ref PVT MK rem (78300200) | EACH | 1,120 | $15.00 | $5.00 | $5.60 |
| 95 | PVT MKG rem WTR blast (78300202) | SF | 27,028 | $0.01 | $0.01 | $0.15 |
| 96 | Undrgrd C galvs 2 (81028200) | LF | 609 | $55.66 | $27.77 | $137.00 |
| 97 | Undrgrd C galvs 3 (81028220) | LF | 182 | $74.50 | $51.32 | $172.00 |
| 98 | Undrgrd C galvs 4 (81028240) | LF | 665 | $94.09 | $60.98 | $229.00 |
| 99 | HD handhole (81400200) | EACH | 8 | $5,087.65 | $4,369.38 | $15,000 |
| 100 | DBL handhole (81400300) | EACH | 2 | $6,908.56 | $5,081.63 | $17,000 |
| 101 | Main EX TR sig instal (85000200) | EACH | 7 | $11,723 | $3,000.00 | $6,500.00 |
| 102 | Elcbl C signal 14 2C (87301215) | LF | 4,271 | $2.79 | $3.35 | $3.95 |
| 103 | Elcbl C signal 14 3C (87301225) | LF | 3,577 | $2.94 | $3.51 | $5.30 |
| 104 | Elcbl C signal 14 5C (87301245) | LF | 3,142 | $3.33 | $3.99 | $6.60 |
| 105 | Elcbl C signal 14 7C (87301255) | LF | 2,571 | $3.69 | $4.12 | $7.90 |
| 106 | Elcbl C lead 14 1PR (87301305) | LF | 9,558 | $2.93 | $3.40 | $3.90 |
| 107 | Elcbl C serv 6 2C (87301805) | LF | 569 | $11.23 | $12.77 | $6.60 |
| 108 | Elcbl C egrdc 6 1C (87301900) | LF | 2,311 | $4.49 | $4.21 | $3.90 |
| 109 | TS post 16 (87501200) | EACH | 7 | $2,846.91 | $2,436.68 | $5,250.00 |
| 110 | S maa & P 28 (87700180) | EACH | 1 | $14,818 | $18,186 | $19,750 |
| 111 | S maa & P 30 (87700190) | EACH | 2 | $15,265 | $18,170 | $20,400 |
| 112 | S maa & P 38 (87700230) | EACH | 2 | $17,471 | $20,192 | $25,000 |
| 113 | S maa & P 40 (87700240) | EACH | 1 | $18,037 | $20,287 | $25,700 |
| 114 | S maa & P 44 (87700260) | EACH | 1 | $20,173 | $21,395 | $30,000 |
| 115 | S maa & P 48 (87700280) | EACH | 1 | $21,321 | $22,447 | $29,500 |
| 116 | Conc FDN TY A (87800100) | LF | 48 | $443.59 | $631.05 | $990.00 |
| 117 | Conc FDN TY E 30D (87800400) | LF | 64 | $469.99 | $487.35 | $1,055.00 |
| 118 | Conc FDN TY E 36D (87800415) | LF | 39 | $542.07 | $552.25 | $1,100.00 |
| 119 | Drill EX handhole (87900200) | EACH | 49 | $956.91 | $793.28 | $660.00 |
| 120 | SH LED 1F 3S mam (88030020) | EACH | 12 | $1,269.98 | $1,227.78 | $1,300.00 |
| 121 | SH LED 1F 3S BM (88030050) | EACH | 8 | $1,119.98 | $1,122.18 | $1,055.00 |
| 122 | SH LED 1F 5S BM (88030100) | EACH | 8 | $1,399.58 | $1,359.78 | $1,400.00 |
| 123 | SH LED 1F 5S mam (88030110) | EACH | 8 | $1,654.65 | $1,484.08 | $1,650.00 |
| 124 | Ped SH LED 1F BM CDT (88102717) | EACH | 16 | $980.78 | $1,035.28 | $1,300.00 |
| 125 | TS backplate L F plas (88200410) | EACH | 20 | $228.67 | $275.39 | $525.00 |
| 126 | Inductive loop detect (88500100) | EACH | 33 | $233.35 | $155.10 | $370.00 |
| 127 | Det loop T1 (88600100) | LF | 6,064 | $32.69 | $85.97 | $100.00 |
| 128 | Reloc EX ped sig head (89500200) | EACH | 7 | $1,072.78 | $1,093.61 | $650.00 |
| 129 | Reloc EX TS equip (89501250) | EACH | 3 | $1,042.78 | $9,550.44 | $1,300.00 |
| 130 | Mod EX contr (89502200) | EACH | 5 | $787.50 | $5,730.26 | $1,300.00 |
| 131 | Rem elcbl FR con (89502300) | LF | 10,086 | $0.29 | $1.15 | $4.00 |
| 132 | Rem & RE elcbl FR con (89502350) | LF | 154 | $4.63 | $9.47 | $6.60 |
| 133 | Remov EX TS equip (89502375) | EACH | 7 | $31,515 | $11,461 | $13,000 |
| 134 | Rebuild EX handhole (89502376) | EACH | 8 | $2,977.28 | $4,553.63 | $13,000 |
| 135 | Remov EX handhole (89502380) | EACH | 11 | $956.91 | $812.53 | $3,250.00 |
| 136 | Remov EX conc FDN (89502385) | EACH | 14 | $1,913.82 | $812.53 | $3,250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.