| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 7 | 6 | 86% |
| 2022 | 10 | 10 | 100% |
| 2023 | 9 | 8 | 89% |
| 2024 | 8 | 7 | 88% |
| 2025 | 8 | 8 | 100% |
| 2026 | 5 | 4 | 80% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 05 | 45 | 41 | 91% |
| District 04 | 2 | 2 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Long joint sealant | 40600370 | LF | 6 | 6 (100%) | $2.58 | $3.30 |
| Bit matls tack CT | 40600290 | LB | 9 | 5 (56%) | $1.35 | $0.01 |
| Temporary ramp | 40600990 | SY | 7 | 3 (43%) | $36.19 | $19.46 |
| Raised refl pavt MKR | 78100100 | EACH | 6 | 3 (50%) | $38.58 | $48.00 |
| Incidental HMA surf | 40800050 | TON | 5 | 3 (60%) | $225.00 | $250.00 |
| HMA SC IL-9.5 C N50 | 40604050 | TON | 5 | 3 (60%) | $113.00 | $144.00 |
| HMA surf rem var DP | X4401198 | SY | 5 | 3 (60%) | $12.63 | $8.21 |
| HMA BC IL-9.5FG N50 | 40602965 | TON | 5 | 3 (60%) | $109.00 | $120.00 |
| SPBGR TY A 6FT posts | 63000001 | LF | 5 | 2 (40%) | $30.31 | $35.70 |
| Earth excavation | 20200100 | CY | 5 | 1 (20%) | $94.43 | $48.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| H. J. Eppel & Co. | 6 | 2 of 6 |
| Kankakee Valley Construction Company, Inc. | 2 | 1 of 2 |
| RoadSafe Traffic Systems, Inc. | 1 | 0 of 1 |
| Stark Excavating, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JUN 2026 | 70794 | District 05 | Section 57-7RS-4,57-8RS-3 | 1 of 1 | $20,217,017 | Low |
| 12 JUN 2026 | 70F48 | District 05 | Section LEROY,TOWANDA,BLOOM | 2 of 2 | $995,684 | +30% |
| 24 APR 2026 | 70E14 | District 05 | Section (57-20(1),21,22)RS-4 | 1 of 1 | $14,480,725 | Low |
| 24 APR 2026 | 70E82 | District 05 | Section (120)RS-1 | 1 of 1 | $5,132,498 | Low |
| 27 FEB 2026 | 91660 | District 05 | Project Number: Hxmm-530 / /, section 24-00170-01-RS | 1 of 2 | $2,213,052 | Low, 5.0% under the second |
| 07 NOV 2025 | 70F19 | District 05 | 1 of 1 | $8,303,728 | Low | |
| 19 SEP 2025 | 70F21 | District 05 | Section (FR)RS-3 | 1 of 1 | $23,522,450 | Low |
| 01 AUG 2025 | 91653 | District 05 | Bloomington, section 24-00360-01-PV | 1 of 1 | $16,110,130 | Low |
| 13 JUN 2025 | 91756 | District 05 | Normal, section 20-00271-01-PV | 1 of 1 | $1,506,116 | Low |
| 25 APR 2025 | 70H39 | District 05 | Section (57-3 | 1 of 1 | $1,012,723 | Low |
| 07 MAR 2025 | 70D55 | District 05 | Section (57-18,9-1,57-5,57-19)RS | 1 of 1 | $36,874,418 | Low |
| 07 MAR 2025 | 91640 | District 05 | Project Number:, section 23-00001-06-BT | 1 of 1 | $3,355,065 | Low |
| 07 MAR 2025 | 91644 | District 05 | Project Number: Uin2-240 / /, section 22-00046-15-RS | 1 of 2 | $3,188,964 | Low, 13% under the second |
| 08 NOV 2024 | 91599 | District 05 | Bloomington, section 16-00360-00-PV | 2 of 2 | $4,805,697 | +2.0% |
| 02 AUG 2024 | 70G11 | District 05 | Section (55,56)RS-5,57-1(1)RS-1 | 1 of 1 | $3,559,956 | Low |
| 02 AUG 2024 | 70H40 | District 05 | Section (13R-2)RS | 1 of 2 | $649,863 | Low, 23% under the second |
| 26 APR 2024 | 70E12 | District 05 | Section (101,102,103,57-24)RS | 1 of 1 | $6,488,552 | Low |
| 26 APR 2024 | 70G75 | District 05 | Section (125,126,127)RS-3 | 1 of 1 | $1,818,351 | Low |
| 08 MAR 2024 | 70855 | District 05 | Section (129)RS-4 | 1 of 1 | $9,025,006 | Low |
| 08 MAR 2024 | 91620 | District 05 | Normal, section 21-00272-00-BT | 1 of 1 | $1,023,294 | Low |
| 08 MAR 2024 | 91637 | District 05 | Project Number: Atpl-285 / /, section 21-00152-02-RS | 1 of 2 | $2,971,504 | Low, 5.0% under the second |
| 04 AUG 2023 | 70G84 | District 05 | Section (FR)I-2 | 1 of 1 | $433,701 | Low |
| 16 JUN 2023 | 70A88 | District 05 | Section (27)RS-3,(28)RS-5&(27,28)BR-1 | 2 of 2 | $4,048,816 | +3.0% |
| 16 JUN 2023 | 70G15 | District 05 | Section (57-17)RS | 1 of 1 | $486,088 | Low |
| 16 JUN 2023 | 70G18 | District 05 | Section (FR)I-1 | 1 of 1 | $407,070 | Low |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.