Rowe Construction, a div of UCM, Inc.: IDOT bid record

Rowe Construction, a div of UCM, Inc. submitted 47 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 43 of them (91%). When it was not low, its total sat a median +14% above the low bid.

Owner
Illinois DOT
Low bid volume
$253,617,887
Latest bid
12 JUN 2026
Data through
18 SEP 2026
47Bids
43Low bids
91Win rate, percent
+14%Median gap to the low bid when not low, 4 bids

By year

YearBidsLow bidsWin rate
20217686%
20221010100%
20239889%
20248788%
202588100%
20265480%
Rowe Construction, a div of UCM, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 05454191%
District 0422100%
Rowe Construction, a div of UCM, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Long joint sealant40600370LF66 (100%)$2.58$3.30
Bit matls tack CT40600290LB95 (56%)$1.35$0.01
Temporary ramp40600990SY73 (43%)$36.19$19.46
Raised refl pavt MKR78100100EACH63 (50%)$38.58$48.00
Incidental HMA surf40800050TON53 (60%)$225.00$250.00
HMA SC IL-9.5 C N5040604050TON53 (60%)$113.00$144.00
HMA surf rem var DPX4401198SY53 (60%)$12.63$8.21
HMA BC IL-9.5FG N5040602965TON53 (60%)$109.00$120.00
SPBGR TY A 6FT posts63000001LF52 (40%)$30.31$35.70
Earth excavation20200100CY51 (20%)$94.43$48.00
Rowe Construction, a div of UCM, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Rowe Construction, a div of UCM, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 JUN 202670794District 05Section 57-7RS-4,57-8RS-31 of 1$20,217,017Low
12 JUN 202670F48District 05Section LEROY,TOWANDA,BLOOM2 of 2$995,684+30%
24 APR 202670E14District 05Section (57-20(1),21,22)RS-41 of 1$14,480,725Low
24 APR 202670E82District 05Section (120)RS-11 of 1$5,132,498Low
27 FEB 202691660District 05Project Number: Hxmm-530 / /, section 24-00170-01-RS1 of 2$2,213,052Low, 5.0% under the second
07 NOV 202570F19District 051 of 1$8,303,728Low
19 SEP 202570F21District 05Section (FR)RS-31 of 1$23,522,450Low
01 AUG 202591653District 05Bloomington, section 24-00360-01-PV1 of 1$16,110,130Low
13 JUN 202591756District 05Normal, section 20-00271-01-PV1 of 1$1,506,116Low
25 APR 202570H39District 05Section (57-31 of 1$1,012,723Low
07 MAR 202570D55District 05Section (57-18,9-1,57-5,57-19)RS1 of 1$36,874,418Low
07 MAR 202591640District 05Project Number:, section 23-00001-06-BT1 of 1$3,355,065Low
07 MAR 202591644District 05Project Number: Uin2-240 / /, section 22-00046-15-RS1 of 2$3,188,964Low, 13% under the second
08 NOV 202491599District 05Bloomington, section 16-00360-00-PV2 of 2$4,805,697+2.0%
02 AUG 202470G11District 05Section (55,56)RS-5,57-1(1)RS-11 of 1$3,559,956Low
02 AUG 202470H40District 05Section (13R-2)RS1 of 2$649,863Low, 23% under the second
26 APR 202470E12District 05Section (101,102,103,57-24)RS1 of 1$6,488,552Low
26 APR 202470G75District 05Section (125,126,127)RS-31 of 1$1,818,351Low
08 MAR 202470855District 05Section (129)RS-41 of 1$9,025,006Low
08 MAR 202491620District 05Normal, section 21-00272-00-BT1 of 1$1,023,294Low
08 MAR 202491637District 05Project Number: Atpl-285 / /, section 21-00152-02-RS1 of 2$2,971,504Low, 5.0% under the second
04 AUG 202370G84District 05Section (FR)I-21 of 1$433,701Low
16 JUN 202370A88District 05Section (27)RS-3,(28)RS-5&(27,28)BR-12 of 2$4,048,816+3.0%
16 JUN 202370G15District 05Section (57-17)RS1 of 1$486,088Low
16 JUN 202370G18District 05Section (FR)I-11 of 1$407,070Low
Rowe Construction, a div of UCM, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy