IDOT contract 70F21 bid tabulation
Section (FR)RS-3. Let by Illinois DOT on September 19, 2025, Mclean, District 05. 1 bid received; low bid $23,522,450 by Rowe Construction, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 255
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rowe Construction, a div of UCM, Inc. | $23,522,450 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rowe Construction, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | T-malus ioen CG 15G (B2003867) | EACH | 2 | $275.00 |
| 2 | Survey marker T2 SPL (XZ193400) | EACH | 29 | $565.23 |
| 3 | Pro SS conn to EX SS (X0322916) | EACH | 5 | $5,775.00 |
| 4 | Acrylic coating (X0325748) | SY | 42.10 | $27.50 |
| 5 | Fiber wrap (X0325749) | SF | 378 | $82.50 |
| 6 | Relocate EX mailbox (X0327301) | EACH | 3 | $758.88 |
| 7 | Connect exist culvert (X0327423) | EACH | 6 | $7,920.00 |
| 8 | Mod EX fib opt cab (X1400426) | EACH | 3 | $12,487 |
| 9 | Temp access- priv ent (X4021000) | EACH | 3 | $1,849.09 |
| 10 | Temp access- com ent (X4022000) | EACH | 33 | $2,021.70 |
| 11 | HMA surf rem SPL (X4400196) | SY | 3,839 | $17.55 |
| 12 | FL inl BX MD 542546SP (X5424505) | EACH | 1 | $10,945 |
| 13 | Remov EX flar end sec (X5427602) | EACH | 13 | $1,210.00 |
| 14 | Connect EX pipe undr (X6010001) | EACH | 4 | $2,420.00 |
| 15 | Sanitary manhole adj (X6026050) | EACH | 1 | $3,990.19 |
| 16 | Rem/repl SPBGR SPL (X6331009) | LF | 25 | $60.50 |
| 17 | Fence removal (X6640104) | LF | 35 | $176.21 |
| 18 | Temp info signing (X7200061) | SF | 336 | $32.73 |
| 19 | Handhole to BE adjust (X8140115) | EACH | 16 | $9,244.62 |
| 20 | DBL handhole adjust (X8140116) | EACH | 5 | $11,723 |
| 21 | HD handhole to BE adj (X8140215) | EACH | 1 | $12,031 |
| 22 | FO CBL CDT 12F SGL MD (X8710013) | LF | 16,083 | $20.26 |
| 23 | Ethernet switch (X8710103) | EACH | 9 | $2,492.03 |
| 24 | Accessible ped signal (X8760200) | EACH | 51 | $2,270.96 |
| 25 | Evp system (X8870300) | EACH | 12 | $22,931 |
| 26 | Vid veh det sys complete (X8891007) | EACH | 9 | $36,309 |
| 27 | Rem & rein FO CBL con (X8950512) | LF | 3,210 | $28.47 |
| 28 | Cold milling SPL (Z0010900) | LF | 22,262 | $4.33 |
| 29 | Concrete steps (Z0012450) | CY | 1 | $10,450 |
| 30 | Conc step remov (Z0012455) | EACH | 1 | $8,204.85 |
| 31 | STR rep con DP = < 5 (Z0012754) | SF | 6.20 | $962.50 |
| 32 | Construction layout (Z0013798) | LS | 1 | $195,012 |
| 33 | SS 1 wat MN 12 (Z0056648) | LF | 102 | $195.80 |
| 34 | SS 2 wat MN 12 (Z0056668) | LF | 254 | $196.90 |
| 35 | SS 2 wat MN 15 (Z0056669) | LF | 115 | $198.00 |
| 36 | SS 2 wat MN 18 (Z0056670) | LF | 213 | $209.00 |
| 37 | SS 2 wat MN 24 (Z0056672) | LF | 251 | $302.50 |
| 38 | SS 2 wat MN 30 (Z0056675) | LF | 6 | $1,347.50 |
| 39 | SS 2 wat MN 36 (Z0056678) | LF | 12 | $1,375.00 |
| 40 | Trainees (Z0076600) | HR | 3,000 | $0.80 |
| 41 | Trainees TPG (Z0076604) | HR | 3,000 | $15.00 |
| 42 | Tree remov 6-15 (20100110) | UNIT | 21 | $110.00 |
| 43 | Temporary fence (20101000) | LF | 64 | $20.28 |
| 44 | Tree trunk protection (20101100) | EACH | 4 | $291.68 |
| 45 | Earth excavation (20200100) | CY | 2,866 | $115.75 |
| 46 | Rem & disp uns matl (20201200) | CY | 150 | $67.24 |
| 47 | Furnished excavation (20400800) | CY | 7,494 | $90.00 |
| 48 | Trench backfill (20800150) | CY | 1,425 | $75.90 |
| 49 | Nitrogen fert nutr (25000400) | LB | 321 | $1.98 |
| 50 | Phosphorus fert nutr (25000500) | LB | 321 | $1.98 |
| 51 | Potassium fert nutr (25000600) | LB | 321 | $1.98 |
| 52 | Sodding salt tolerant (25200110) | SY | 20,434 | $27.91 |
| 53 | Supple watering (25200200) | UNIT | 163.80 | $0.01 |
| 54 | Temp eros contr seed (28000250) | LB | 846 | $5.81 |
| 55 | Temp ditch checks (28000305) | LF | 490 | $11.66 |
| 56 | Perimeter eros bar (28000400) | LF | 588 | $4.37 |
| 57 | Inlet & pipe protect (28000500) | EACH | 25 | $254.09 |
| 58 | Inlet filters (28000510) | EACH | 98 | $317.37 |
| 59 | Temp eros contr blank (28001100) | SY | 1,403 | $3.09 |
| 60 | Stone riprap CL A3 (28100105) | SY | 97 | $150.75 |
| 61 | Filter fabric (28200200) | SY | 97 | $11.40 |
| 62 | Agg subgrade improve (30300001) | CY | 150 | $112.76 |
| 63 | Agg subgrade impr 12 (30300112) | SY | 3,908 | $68.00 |
| 64 | PCC bse cse 10 (35300500) | SY | 2,674 | $96.84 |
| 65 | P bit matls tack CT (40600295) | LB | 65,108 | $4.15 |
| 66 | Long joint sealant (40600370) | LF | 31,742 | $3.50 |
| 67 | Temporary ramp (40600990) | SY | 1,435 | $48.24 |
| 68 | P HMA BC IL-9.5FG N70 (40603218) | TON | 6,483 | $190.00 |
| 69 | P SC SMA 9.5 E N80 (40605024) | TON | 7,779 | $225.00 |
| 70 | Incidental HMA surf (40800050) | TON | 323 | $375.00 |
| 71 | Welded wire reinf (42000060) | SY | 2,113 | $18.70 |
| 72 | PCC driveway pavt 6 (42300200) | SY | 63 | $160.79 |
| 73 | PCC driveway pavt 8 (42300400) | SY | 1,771 | $188.68 |
| 74 | PC conc sidewalk 5 (42400200) | SF | 117,903 | $15.25 |
| 75 | Detectable warnings (42400800) | SF | 1,217 | $49.86 |
| 76 | Pavement rem (44000100) | SY | 274 | $69.80 |
| 77 | HMA surf rem 2 1/2 (44000159) | SY | 89,605 | $7.00 |
| 78 | Drive pavement rem (44000200) | SY | 2,112 | $29.51 |
| 79 | Comb curb gutter rem (44000500) | LF | 8,864 | $20.92 |
| 80 | Sidewalk rem (44000600) | SF | 7,512 | $8.41 |
| 81 | Median removal (44003100) | SF | 2,390 | $11.49 |
| 82 | Paved ditch removal (44004000) | LF | 1,014 | $36.25 |
| 83 | CL B patch T1 10 (44200966) | SY | 324 | $267.50 |
| 84 | CL B patch T2 10 (44200970) | SY | 605 | $244.40 |
| 85 | CL B patch T3 10 (44200974) | SY | 1,207 | $240.00 |
| 86 | CL B patch T4 10 (44200976) | SY | 906 | $235.60 |
| 87 | Dowel bars 1 1/4 (44201298) | EACH | 6,029 | $27.50 |
| 88 | Saw cuts (44213200) | LF | 3,630 | $6.60 |
| 89 | Tie bars 3/4 (44213204) | EACH | 123 | $18.70 |
| 90 | Agg wedge SHLD type B (48102100) | TON | 258 | $79.95 |
| 91 | Conc rem (50102400) | CY | 13 | $717.94 |
| 92 | Conc headwall removal (50104400) | EACH | 28 | $1,457.50 |
| 93 | Pipe culvert remov (50105220) | LF | 68 | $72.60 |
| 94 | Structure excavation (50200100) | CY | 306.90 | $93.50 |
| 95 | Reinforcement bars (50800105) | LB | 5,310 | $6.05 |
| 96 | Reinf bars, epoxy CTD (50800205) | LB | 370 | $6.05 |
| 97 | Conc STR retain wall (52200900) | CY | 79.90 | $4,400.00 |
| 98 | P cul CL A 1 18 (542A0223) | LF | 56 | $209.00 |
| 99 | P cul CL A 1 24 (542A0229) | LF | 54 | $214.50 |
| 100 | P cul CL A 1 36 (542A0241) | LF | 41 | $405.90 |
| 101 | PRC flar end sec 12 (54213657) | EACH | 13 | $2,117.50 |
| 102 | PRC flar end sec 15 (54213660) | EACH | 2 | $2,200.00 |
| 103 | PRC flar end sec 18 (54213663) | EACH | 5 | $2,337.50 |
| 104 | PRC flar end sec 24 (54213669) | EACH | 11 | $3,327.50 |
| 105 | PRC flar end sec 30 (54213675) | EACH | 1 | $4,455.00 |
| 106 | PRC flar end sec 36 (54213681) | EACH | 3 | $5,032.50 |
| 107 | Storm sew CL A 1 12 (550A0050) | LF | 635 | $114.40 |
| 108 | Storm sew CL A 1 18 (550A0090) | LF | 29 | $148.50 |
| 109 | Storm sew CL A 1 24 (550A0120) | LF | 47 | $150.70 |
| 110 | Storm sew CL A 2 12 (550A0340) | LF | 555 | $115.50 |
| 111 | Storm sew CL A 2 24 (550A0410) | LF | 893 | $165.55 |
| 112 | Storm sewer rem 12 (55100500) | LF | 313 | $85.80 |
| 113 | Water valves adjust (56109210) | EACH | 6 | $1,131.85 |
| 114 | Granular backfill STR (58600101) | CY | 60.10 | $126.50 |
| 115 | Concrete sealer (58700300) | SF | 6.20 | $165.00 |
| 116 | Epoxy crack injection (59000200) | LF | 25 | $137.50 |
| 117 | Geocomposite wall DR (59100100) | SY | 69.70 | $110.00 |
| 118 | Conc HDWL for P drain (60100060) | EACH | 4 | $907.50 |
| 119 | Pipe underdrain 6 SP (60108200) | LF | 68 | $93.50 |
| 120 | Man TA 4 dia T1F OL (60218300) | EACH | 3 | $5,806.84 |
| 121 | Man TA 4 dia T1F CL (60218400) | EACH | 10 | $5,806.83 |
| 122 | Man TA 4 dia T8G (60219000) | EACH | 2 | $5,641.84 |
| 123 | Man TA 5 dia T1F OL (60221000) | EACH | 2 | $8,556.84 |
| 124 | Man TA 5 dia T1F CL (60221100) | EACH | 3 | $7,810.00 |
| 125 | Man TA 5 dia T8G (60221700) | EACH | 1 | $8,391.85 |
| 126 | Man TA 6 dia T1F OL (60223700) | EACH | 3 | $10,647 |
| 127 | Inlets TA T3F&G (60235700) | EACH | 18 | $3,606.83 |
| 128 | Inlets TA T24F&G (60237470) | EACH | 1 | $3,166.85 |
| 129 | Inlets TB T3F&G (60240220) | EACH | 9 | $4,651.83 |
| 130 | Inlets TB T10F&G (60240305) | EACH | 1 | $4,971.02 |
| 131 | Inlets TB T24F&G (60240328) | EACH | 1 | $4,211.85 |
| 132 | Man adjust (60255500) | EACH | 1 | $3,463.71 |
| 133 | Man adj new T1F CL (60255800) | EACH | 1 | $2,573.93 |
| 134 | Inlets adj new T3F&G (60260500) | EACH | 7 | $1,936.77 |
| 135 | VV adjust (60265700) | EACH | 1 | $770.57 |
| 136 | Man frames adjust (60300350) | EACH | 3 | $1,595.92 |
| 137 | Remov manholes (60500040) | EACH | 1 | $4,867.50 |
| 138 | Remov inlets (60500060) | EACH | 16 | $2,750.00 |
| 139 | Class SI conc outlet (60600095) | CY | 4.50 | $2,712.52 |
| 140 | Conc curb TB (60600605) | LF | 283 | $94.30 |
| 141 | Comb CC&G TB6.06 (60603500) | LF | 159 | $101.42 |
| 142 | Comb CC&G TB6.12 (60603800) | LF | 221 | $81.19 |
| 143 | Comb CC&G TB6.12 aep (60603900) | LF | 183 | $92.26 |
| 144 | Comb CC&G TB6.18 (60604400) | LF | 874 | $87.64 |
| 145 | Comb CC&G TB6.18 aep (60604500) | LF | 310 | $121.79 |
| 146 | Comb CC&G TY B-6.24 (60605000) | LF | 3,287 | $88.47 |
| 147 | Comb CC&G TB6.24 aep (60605100) | LF | 2,740 | $105.49 |
| 148 | Paved ditch TA-15 (60615400) | LF | 12 | $421.14 |
| 149 | Conc median surf 4 (60618300) | SF | 1,789 | $31.57 |
| 150 | CH LK fence 8 (66400505) | LF | 45 | $320.46 |
| 151 | Non SPL waste disposl (66900200) | CY | 3,830 | $36.54 |
| 152 | Soil disposal analy (66900530) | EACH | 13 | $1,100.00 |
| 153 | Reg sub P-const plan (66901001) | LS | 1 | $3,300.00 |
| 154 | Reg sub F con report (66901003) | LS | 1 | $1,100.00 |
| 155 | Reg sub mon (66901006) | CAL DAY | 27 | $1,300.00 |
| 156 | Engr field office B (67000500) | CAL MO | 14 | $4,000.00 |
| 157 | Mobilization (67100100) | LS | 1 | $1,400,000 |
| 158 | Traf cont-prot 701421 (70100310) | LS | 1 | $70,000 |
| 159 | Traf cont-prot 701422 (70100320) | LS | 1 | $45,000 |
| 160 | TR cont & prot 701501 (70102621) | EACH | 1 | $55,000 |
| 161 | TR cont & prot 701601 (70102630) | LS | 1 | $87,000 |
| 162 | TR cont & prot 701602 (70102632) | LS | 1 | $170,000 |
| 163 | TR cont & prot 701701 (70102635) | LS | 1 | $50,000 |
| 164 | TR cont & prot 701801 (70102640) | LS | 1 | $30,000 |
| 165 | TR cont surveillance (70103815) | CAL DAY | 526 | $0.01 |
| 166 | Changeable message SN (70107025) | CAL DAY | 336 | $110.00 |
| 167 | Short term pavt mking (70300100) | LF | 17,341 | $1.80 |
| 168 | SHRT TRM pavt MK rem (70300150) | SF | 5,781 | $0.01 |
| 169 | Temp PVT MK LTR & sym paint (70300211) | SF | 2,153 | $0.01 |
| 170 | Temp PVT MK line 4 - paint (70300221) | LF | 24,723 | $0.01 |
| 171 | Temp PVT MK line 6 - paint (70300241) | LF | 6,463 | $0.01 |
| 172 | Temp PVT MK line 12 - paint (70300261) | LF | 6,447 | $0.01 |
| 173 | Temp PVT MK line 24 - paint (70300281) | LF | 1,519 | $0.01 |
| 174 | Sign panel T1 (72000100) | SF | 225 | $100.02 |
| 175 | Sign panel T2 (72000200) | SF | 378 | $133.05 |
| 176 | Reloc sin pan assy TA (72400500) | EACH | 20 | $651.90 |
| 177 | Reloc sin pan assy TB (72400600) | EACH | 7 | $931.28 |
| 178 | Teles STL sin support (72800100) | LF | 59 | $49.50 |
| 179 | THPL PVT MK LTR & sym (78000100) | SF | 2,153 | $6.60 |
| 180 | THPL PVT MK line 4 (78000200) | LF | 51,656 | $0.66 |
| 181 | THPL PVT MK line 6 (78000400) | LF | 4,063 | $0.94 |
| 182 | THPL PVT MK line 8 (78000500) | LF | 2,474 | $1.27 |
| 183 | THPL PVT MK line 12 (78000600) | LF | 6,447 | $3.19 |
| 184 | THPL PVT MK line 24 (78000650) | LF | 1,519 | $6.60 |
| 185 | GRV RCSD PM LTR & sym (78011000) | SF | 2,153 | $4.95 |
| 186 | GRV RCSD PVT MRKG 5 (78011025) | LF | 51,656 | $0.55 |
| 187 | GRV RCSD PVT MRKG 7 (78011035) | LF | 4,603 | $0.72 |
| 188 | GRV RCSD PVT MRKG 9 (78011045) | LF | 2,474 | $0.94 |
| 189 | GRV RCSD PVT MRKG 13 (78011065) | LF | 6,447 | $2.75 |
| 190 | GRV RCSD PVT MRKG 25 (78011125) | LF | 1,519 | $5.06 |
| 191 | Raised refl pavt MKR (78100100) | EACH | 454 | $60.50 |
| 192 | Raised ref PVT MK rem (78300200) | EACH | 454 | $0.01 |
| 193 | PVT MKG rem WTR blast (78300202) | SF | 25,161 | $0.01 |
| 194 | Locate undergr cable (80300100) | LF | 1,200 | $3.77 |
| 195 | Serv install GRND MT (80500010) | EACH | 9 | $10,584 |
| 196 | Undrgrd C PVC 2 (81028350) | LF | 13,846 | $45.55 |
| 197 | Undrgrd C PVC 2 1/2 (81028360) | LF | 621 | $46.89 |
| 198 | Undrgrd C PVC 3 (81028370) | LF | 1,424 | $67.66 |
| 199 | Undrgrd C PVC 3 1/2 (81028380) | LF | 420 | $67.66 |
| 200 | Undrgrd C PVC 4 (81028390) | LF | 1,195 | $76.70 |
| 201 | Handhole (81400100) | EACH | 63 | $9,418.79 |
| 202 | DBL handhole (81400300) | EACH | 9 | $13,974 |
| 203 | EC C XLP use 1C 10 (81702110) | LF | 3,150 | $4.96 |
| 204 | Lum LED rdwy G (82110007) | EACH | 4 | $1,493.88 |
| 205 | Main EX TR sig instal (85000200) | EACH | 11 | $6,605.21 |
| 206 | PT new traf sig post (85100500) | EACH | 63 | $616.31 |
| 207 | PT new MA&P < 40FT (85100600) | EACH | 8 | $4,756.29 |
| 208 | PT new MA&P >=40FT (85100701) | EACH | 18 | $6,125.57 |
| 209 | PT new com MA&P>=40FT (85100901) | EACH | 4 | $9,619.77 |
| 210 | Fac T5 cab (85700300) | EACH | 9 | $36,163 |
| 211 | Uninter power sup STD (86200200) | EACH | 9 | $12,688 |
| 212 | Elcbl C tracer 14 1C (87300925) | LF | 16,083 | $3.95 |
| 213 | Elcbl C signal 14 2C (87301215) | LF | 9,248 | $5.42 |
| 214 | Elcbl C signal 14 3C (87301225) | LF | 11,957 | $5.75 |
| 215 | Elcbl C signal 14 5C (87301245) | LF | 18,992 | $6.42 |
| 216 | Elcbl C signal 14 7C (87301255) | LF | 15,490 | $6.90 |
| 217 | Elcbl C serv 6 2C (87301805) | LF | 835 | $9.55 |
| 218 | Elcbl C egrdc 6 1C (87301900) | LF | 7,232 | $7.54 |
| 219 | TS post galvs 10 (87502440) | EACH | 6 | $3,675.07 |
| 220 | TS post galvs 12 (87502460) | EACH | 6 | $3,859.97 |
| 221 | TS post galvs 14 (87502480) | EACH | 10 | $3,909.53 |
| 222 | TS post galvs 16 (87502500) | EACH | 10 | $3,969.82 |
| 223 | Ped push-but post T2 (87600200) | EACH | 31 | $3,898.82 |
| 224 | S maa & P 28 (87700180) | EACH | 3 | $17,404 |
| 225 | S maa & P 32 (87700200) | EACH | 4 | $18,704 |
| 226 | S maa & P 36 (87700220) | EACH | 1 | $21,410 |
| 227 | S maa & P 40 (87700240) | EACH | 6 | $22,801 |
| 228 | S maa & P 42 (87700250) | EACH | 4 | $23,272 |
| 229 | S maa & P 45 (87700265) | EACH | 1 | $24,096 |
| 230 | S maa & P 46 (87700270) | EACH | 2 | $24,639 |
| 231 | S maa & P 50 (87700290) | EACH | 1 | $32,155 |
| 232 | S maa & P 55 (87700320) | EACH | 2 | $32,447 |
| 233 | S maa & P 60 (87700400) | EACH | 2 | $38,908 |
| 234 | STL comb maa&P 42 (87702940) | EACH | 1 | $31,820 |
| 235 | STL comb maa&P 48 (87702970) | EACH | 1 | $36,938 |
| 236 | STL comb maa&P 52 (87702985) | EACH | 1 | $40,335 |
| 237 | STL comb maa&P 60 (87703030) | EACH | 1 | $47,708 |
| 238 | Conc FDN TY A (87800100) | LF | 96 | $710.09 |
| 239 | Conc FDN TY C (87800150) | LF | 27 | $1,353.20 |
| 240 | Conc FDN TY E 30D (87800400) | LF | 97.50 | $1,909.22 |
| 241 | Conc FDN TY E 36D (87800415) | LF | 255 | $2,043.20 |
| 242 | Conc FDN TY E 42D (87800420) | LF | 63 | $2,873.87 |
| 243 | Drill EX handhole (87900200) | EACH | 13 | $2,009.70 |
| 244 | SH P LED 1F 3S BM (88040070) | EACH | 30 | $1,898.50 |
| 245 | SH P LED 1F 3S mam (88040090) | EACH | 52 | $2,104.83 |
| 246 | SH P LED 1F 4S BM (88040110) | EACH | 22 | $2,087.40 |
| 247 | SH P LED 1F 4S mam (88040120) | EACH | 23 | $2,304.46 |
| 248 | SH P LED 1F 5S BM (88040150) | EACH | 20 | $2,599.21 |
| 249 | SH P LED 1F 5S mam (88040160) | EACH | 6 | $2,824.73 |
| 250 | Ped SH P LED 1F BM CT (88102825) | EACH | 58 | $1,936.01 |
| 251 | TS backplate ret-refl (88200510) | EACH | 153 | $596.21 |
| 252 | Remov EX TS equip (89502375) | EACH | 10 | $35,907 |
| 253 | Remov EX handhole (89502380) | EACH | 69 | $3,523.67 |
| 254 | Remov EX DBL handhole (89502382) | EACH | 7 | $4,401.24 |
| 255 | Remov EX conc FDN (89502385) | EACH | 67 | $3,865.32 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.