IDOT contract 70F21 bid tabulation

Section (FR)RS-3. Let by Illinois DOT on September 19, 2025, Mclean, District 05. 1 bid received; low bid $23,522,450 by Rowe Construction, a div of UCM, Inc..

Owner
Illinois DOT
Letting
19 SEP 2025
Pay items
255
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rowe Construction, a div of UCM, Inc.$23,522,450Low
IDOT contract 70F21: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rowe Construction, a div of UCM, Inc.
1T-malus ioen CG 15G (B2003867)EACH2$275.00
2Survey marker T2 SPL (XZ193400)EACH29$565.23
3Pro SS conn to EX SS (X0322916)EACH5$5,775.00
4Acrylic coating (X0325748)SY42.10$27.50
5Fiber wrap (X0325749)SF378$82.50
6Relocate EX mailbox (X0327301)EACH3$758.88
7Connect exist culvert (X0327423)EACH6$7,920.00
8Mod EX fib opt cab (X1400426)EACH3$12,487
9Temp access- priv ent (X4021000)EACH3$1,849.09
10Temp access- com ent (X4022000)EACH33$2,021.70
11HMA surf rem SPL (X4400196)SY3,839$17.55
12FL inl BX MD 542546SP (X5424505)EACH1$10,945
13Remov EX flar end sec (X5427602)EACH13$1,210.00
14Connect EX pipe undr (X6010001)EACH4$2,420.00
15Sanitary manhole adj (X6026050)EACH1$3,990.19
16Rem/repl SPBGR SPL (X6331009)LF25$60.50
17Fence removal (X6640104)LF35$176.21
18Temp info signing (X7200061)SF336$32.73
19Handhole to BE adjust (X8140115)EACH16$9,244.62
20DBL handhole adjust (X8140116)EACH5$11,723
21HD handhole to BE adj (X8140215)EACH1$12,031
22FO CBL CDT 12F SGL MD (X8710013)LF16,083$20.26
23Ethernet switch (X8710103)EACH9$2,492.03
24Accessible ped signal (X8760200)EACH51$2,270.96
25Evp system (X8870300)EACH12$22,931
26Vid veh det sys complete (X8891007)EACH9$36,309
27Rem & rein FO CBL con (X8950512)LF3,210$28.47
28Cold milling SPL (Z0010900)LF22,262$4.33
29Concrete steps (Z0012450)CY1$10,450
30Conc step remov (Z0012455)EACH1$8,204.85
31STR rep con DP = < 5 (Z0012754)SF6.20$962.50
32Construction layout (Z0013798)LS1$195,012
33SS 1 wat MN 12 (Z0056648)LF102$195.80
34SS 2 wat MN 12 (Z0056668)LF254$196.90
35SS 2 wat MN 15 (Z0056669)LF115$198.00
36SS 2 wat MN 18 (Z0056670)LF213$209.00
37SS 2 wat MN 24 (Z0056672)LF251$302.50
38SS 2 wat MN 30 (Z0056675)LF6$1,347.50
39SS 2 wat MN 36 (Z0056678)LF12$1,375.00
40Trainees (Z0076600)HR3,000$0.80
41Trainees TPG (Z0076604)HR3,000$15.00
42Tree remov 6-15 (20100110)UNIT21$110.00
43Temporary fence (20101000)LF64$20.28
44Tree trunk protection (20101100)EACH4$291.68
45Earth excavation (20200100)CY2,866$115.75
46Rem & disp uns matl (20201200)CY150$67.24
47Furnished excavation (20400800)CY7,494$90.00
48Trench backfill (20800150)CY1,425$75.90
49Nitrogen fert nutr (25000400)LB321$1.98
50Phosphorus fert nutr (25000500)LB321$1.98
51Potassium fert nutr (25000600)LB321$1.98
52Sodding salt tolerant (25200110)SY20,434$27.91
53Supple watering (25200200)UNIT163.80$0.01
54Temp eros contr seed (28000250)LB846$5.81
55Temp ditch checks (28000305)LF490$11.66
56Perimeter eros bar (28000400)LF588$4.37
57Inlet & pipe protect (28000500)EACH25$254.09
58Inlet filters (28000510)EACH98$317.37
59Temp eros contr blank (28001100)SY1,403$3.09
60Stone riprap CL A3 (28100105)SY97$150.75
61Filter fabric (28200200)SY97$11.40
62Agg subgrade improve (30300001)CY150$112.76
63Agg subgrade impr 12 (30300112)SY3,908$68.00
64PCC bse cse 10 (35300500)SY2,674$96.84
65P bit matls tack CT (40600295)LB65,108$4.15
66Long joint sealant (40600370)LF31,742$3.50
67Temporary ramp (40600990)SY1,435$48.24
68P HMA BC IL-9.5FG N70 (40603218)TON6,483$190.00
69P SC SMA 9.5 E N80 (40605024)TON7,779$225.00
70Incidental HMA surf (40800050)TON323$375.00
71Welded wire reinf (42000060)SY2,113$18.70
72PCC driveway pavt 6 (42300200)SY63$160.79
73PCC driveway pavt 8 (42300400)SY1,771$188.68
74PC conc sidewalk 5 (42400200)SF117,903$15.25
75Detectable warnings (42400800)SF1,217$49.86
76Pavement rem (44000100)SY274$69.80
77HMA surf rem 2 1/2 (44000159)SY89,605$7.00
78Drive pavement rem (44000200)SY2,112$29.51
79Comb curb gutter rem (44000500)LF8,864$20.92
80Sidewalk rem (44000600)SF7,512$8.41
81Median removal (44003100)SF2,390$11.49
82Paved ditch removal (44004000)LF1,014$36.25
83CL B patch T1 10 (44200966)SY324$267.50
84CL B patch T2 10 (44200970)SY605$244.40
85CL B patch T3 10 (44200974)SY1,207$240.00
86CL B patch T4 10 (44200976)SY906$235.60
87Dowel bars 1 1/4 (44201298)EACH6,029$27.50
88Saw cuts (44213200)LF3,630$6.60
89Tie bars 3/4 (44213204)EACH123$18.70
90Agg wedge SHLD type B (48102100)TON258$79.95
91Conc rem (50102400)CY13$717.94
92Conc headwall removal (50104400)EACH28$1,457.50
93Pipe culvert remov (50105220)LF68$72.60
94Structure excavation (50200100)CY306.90$93.50
95Reinforcement bars (50800105)LB5,310$6.05
96Reinf bars, epoxy CTD (50800205)LB370$6.05
97Conc STR retain wall (52200900)CY79.90$4,400.00
98P cul CL A 1 18 (542A0223)LF56$209.00
99P cul CL A 1 24 (542A0229)LF54$214.50
100P cul CL A 1 36 (542A0241)LF41$405.90
101PRC flar end sec 12 (54213657)EACH13$2,117.50
102PRC flar end sec 15 (54213660)EACH2$2,200.00
103PRC flar end sec 18 (54213663)EACH5$2,337.50
104PRC flar end sec 24 (54213669)EACH11$3,327.50
105PRC flar end sec 30 (54213675)EACH1$4,455.00
106PRC flar end sec 36 (54213681)EACH3$5,032.50
107Storm sew CL A 1 12 (550A0050)LF635$114.40
108Storm sew CL A 1 18 (550A0090)LF29$148.50
109Storm sew CL A 1 24 (550A0120)LF47$150.70
110Storm sew CL A 2 12 (550A0340)LF555$115.50
111Storm sew CL A 2 24 (550A0410)LF893$165.55
112Storm sewer rem 12 (55100500)LF313$85.80
113Water valves adjust (56109210)EACH6$1,131.85
114Granular backfill STR (58600101)CY60.10$126.50
115Concrete sealer (58700300)SF6.20$165.00
116Epoxy crack injection (59000200)LF25$137.50
117Geocomposite wall DR (59100100)SY69.70$110.00
118Conc HDWL for P drain (60100060)EACH4$907.50
119Pipe underdrain 6 SP (60108200)LF68$93.50
120Man TA 4 dia T1F OL (60218300)EACH3$5,806.84
121Man TA 4 dia T1F CL (60218400)EACH10$5,806.83
122Man TA 4 dia T8G (60219000)EACH2$5,641.84
123Man TA 5 dia T1F OL (60221000)EACH2$8,556.84
124Man TA 5 dia T1F CL (60221100)EACH3$7,810.00
125Man TA 5 dia T8G (60221700)EACH1$8,391.85
126Man TA 6 dia T1F OL (60223700)EACH3$10,647
127Inlets TA T3F&G (60235700)EACH18$3,606.83
128Inlets TA T24F&G (60237470)EACH1$3,166.85
129Inlets TB T3F&G (60240220)EACH9$4,651.83
130Inlets TB T10F&G (60240305)EACH1$4,971.02
131Inlets TB T24F&G (60240328)EACH1$4,211.85
132Man adjust (60255500)EACH1$3,463.71
133Man adj new T1F CL (60255800)EACH1$2,573.93
134Inlets adj new T3F&G (60260500)EACH7$1,936.77
135VV adjust (60265700)EACH1$770.57
136Man frames adjust (60300350)EACH3$1,595.92
137Remov manholes (60500040)EACH1$4,867.50
138Remov inlets (60500060)EACH16$2,750.00
139Class SI conc outlet (60600095)CY4.50$2,712.52
140Conc curb TB (60600605)LF283$94.30
141Comb CC&G TB6.06 (60603500)LF159$101.42
142Comb CC&G TB6.12 (60603800)LF221$81.19
143Comb CC&G TB6.12 aep (60603900)LF183$92.26
144Comb CC&G TB6.18 (60604400)LF874$87.64
145Comb CC&G TB6.18 aep (60604500)LF310$121.79
146Comb CC&G TY B-6.24 (60605000)LF3,287$88.47
147Comb CC&G TB6.24 aep (60605100)LF2,740$105.49
148Paved ditch TA-15 (60615400)LF12$421.14
149Conc median surf 4 (60618300)SF1,789$31.57
150CH LK fence 8 (66400505)LF45$320.46
151Non SPL waste disposl (66900200)CY3,830$36.54
152Soil disposal analy (66900530)EACH13$1,100.00
153Reg sub P-const plan (66901001)LS1$3,300.00
154Reg sub F con report (66901003)LS1$1,100.00
155Reg sub mon (66901006)CAL DAY27$1,300.00
156Engr field office B (67000500)CAL MO14$4,000.00
157Mobilization (67100100)LS1$1,400,000
158Traf cont-prot 701421 (70100310)LS1$70,000
159Traf cont-prot 701422 (70100320)LS1$45,000
160TR cont & prot 701501 (70102621)EACH1$55,000
161TR cont & prot 701601 (70102630)LS1$87,000
162TR cont & prot 701602 (70102632)LS1$170,000
163TR cont & prot 701701 (70102635)LS1$50,000
164TR cont & prot 701801 (70102640)LS1$30,000
165TR cont surveillance (70103815)CAL DAY526$0.01
166Changeable message SN (70107025)CAL DAY336$110.00
167Short term pavt mking (70300100)LF17,341$1.80
168SHRT TRM pavt MK rem (70300150)SF5,781$0.01
169Temp PVT MK LTR & sym paint (70300211)SF2,153$0.01
170Temp PVT MK line 4 - paint (70300221)LF24,723$0.01
171Temp PVT MK line 6 - paint (70300241)LF6,463$0.01
172Temp PVT MK line 12 - paint (70300261)LF6,447$0.01
173Temp PVT MK line 24 - paint (70300281)LF1,519$0.01
174Sign panel T1 (72000100)SF225$100.02
175Sign panel T2 (72000200)SF378$133.05
176Reloc sin pan assy TA (72400500)EACH20$651.90
177Reloc sin pan assy TB (72400600)EACH7$931.28
178Teles STL sin support (72800100)LF59$49.50
179THPL PVT MK LTR & sym (78000100)SF2,153$6.60
180THPL PVT MK line 4 (78000200)LF51,656$0.66
181THPL PVT MK line 6 (78000400)LF4,063$0.94
182THPL PVT MK line 8 (78000500)LF2,474$1.27
183THPL PVT MK line 12 (78000600)LF6,447$3.19
184THPL PVT MK line 24 (78000650)LF1,519$6.60
185GRV RCSD PM LTR & sym (78011000)SF2,153$4.95
186GRV RCSD PVT MRKG 5 (78011025)LF51,656$0.55
187GRV RCSD PVT MRKG 7 (78011035)LF4,603$0.72
188GRV RCSD PVT MRKG 9 (78011045)LF2,474$0.94
189GRV RCSD PVT MRKG 13 (78011065)LF6,447$2.75
190GRV RCSD PVT MRKG 25 (78011125)LF1,519$5.06
191Raised refl pavt MKR (78100100)EACH454$60.50
192Raised ref PVT MK rem (78300200)EACH454$0.01
193PVT MKG rem WTR blast (78300202)SF25,161$0.01
194Locate undergr cable (80300100)LF1,200$3.77
195Serv install GRND MT (80500010)EACH9$10,584
196Undrgrd C PVC 2 (81028350)LF13,846$45.55
197Undrgrd C PVC 2 1/2 (81028360)LF621$46.89
198Undrgrd C PVC 3 (81028370)LF1,424$67.66
199Undrgrd C PVC 3 1/2 (81028380)LF420$67.66
200Undrgrd C PVC 4 (81028390)LF1,195$76.70
201Handhole (81400100)EACH63$9,418.79
202DBL handhole (81400300)EACH9$13,974
203EC C XLP use 1C 10 (81702110)LF3,150$4.96
204Lum LED rdwy G (82110007)EACH4$1,493.88
205Main EX TR sig instal (85000200)EACH11$6,605.21
206PT new traf sig post (85100500)EACH63$616.31
207PT new MA&P < 40FT (85100600)EACH8$4,756.29
208PT new MA&P >=40FT (85100701)EACH18$6,125.57
209PT new com MA&P>=40FT (85100901)EACH4$9,619.77
210Fac T5 cab (85700300)EACH9$36,163
211Uninter power sup STD (86200200)EACH9$12,688
212Elcbl C tracer 14 1C (87300925)LF16,083$3.95
213Elcbl C signal 14 2C (87301215)LF9,248$5.42
214Elcbl C signal 14 3C (87301225)LF11,957$5.75
215Elcbl C signal 14 5C (87301245)LF18,992$6.42
216Elcbl C signal 14 7C (87301255)LF15,490$6.90
217Elcbl C serv 6 2C (87301805)LF835$9.55
218Elcbl C egrdc 6 1C (87301900)LF7,232$7.54
219TS post galvs 10 (87502440)EACH6$3,675.07
220TS post galvs 12 (87502460)EACH6$3,859.97
221TS post galvs 14 (87502480)EACH10$3,909.53
222TS post galvs 16 (87502500)EACH10$3,969.82
223Ped push-but post T2 (87600200)EACH31$3,898.82
224S maa & P 28 (87700180)EACH3$17,404
225S maa & P 32 (87700200)EACH4$18,704
226S maa & P 36 (87700220)EACH1$21,410
227S maa & P 40 (87700240)EACH6$22,801
228S maa & P 42 (87700250)EACH4$23,272
229S maa & P 45 (87700265)EACH1$24,096
230S maa & P 46 (87700270)EACH2$24,639
231S maa & P 50 (87700290)EACH1$32,155
232S maa & P 55 (87700320)EACH2$32,447
233S maa & P 60 (87700400)EACH2$38,908
234STL comb maa&P 42 (87702940)EACH1$31,820
235STL comb maa&P 48 (87702970)EACH1$36,938
236STL comb maa&P 52 (87702985)EACH1$40,335
237STL comb maa&P 60 (87703030)EACH1$47,708
238Conc FDN TY A (87800100)LF96$710.09
239Conc FDN TY C (87800150)LF27$1,353.20
240Conc FDN TY E 30D (87800400)LF97.50$1,909.22
241Conc FDN TY E 36D (87800415)LF255$2,043.20
242Conc FDN TY E 42D (87800420)LF63$2,873.87
243Drill EX handhole (87900200)EACH13$2,009.70
244SH P LED 1F 3S BM (88040070)EACH30$1,898.50
245SH P LED 1F 3S mam (88040090)EACH52$2,104.83
246SH P LED 1F 4S BM (88040110)EACH22$2,087.40
247SH P LED 1F 4S mam (88040120)EACH23$2,304.46
248SH P LED 1F 5S BM (88040150)EACH20$2,599.21
249SH P LED 1F 5S mam (88040160)EACH6$2,824.73
250Ped SH P LED 1F BM CT (88102825)EACH58$1,936.01
251TS backplate ret-refl (88200510)EACH153$596.21
252Remov EX TS equip (89502375)EACH10$35,907
253Remov EX handhole (89502380)EACH69$3,523.67
254Remov EX DBL handhole (89502382)EACH7$4,401.24
255Remov EX conc FDN (89502385)EACH67$3,865.32
IDOT contract 70F21: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way