IDOT contract 70F48 bid tabulation
Section LEROY,TOWANDA,BLOOM. Let by Illinois DOT on June 12, 2026, Mclean, District 05. 2 bids received; low bid $763,289 by H. J. Eppel & Co..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 18
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | H. J. Eppel & Co. | $763,289 | Low |
| 2 | Rowe Construction, a div of UCM, Inc. | $995,684 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. H. J. Eppel & Co. | 2. Rowe Construction, a div of UCM, Inc. |
|---|---|---|---|---|---|
| 1 | Parking blocks (X0696100) | EACH | 55 | $189.00 | $130.00 |
| 2 | Traf cont & prot SPL (X7010216) | LS | 1 | $1,900.00 | $15,000 |
| 3 | Construction layout (Z0013798) | LS | 1 | $4,900.00 | $10,000 |
| 4 | Earth excavation (20200100) | CY | 515 | $108.00 | $186.51 |
| 5 | Inlet filters (28000510) | EACH | 5 | $90.00 | $174.34 |
| 6 | Preparation of base (35800100) | SY | 9,231 | $1.95 | $3.06 |
| 7 | Bit matls PR CT (40600275) | LB | 20,768 | $1.15 | $0.01 |
| 8 | Bit matls tack CT (40600290) | LB | 8,247 | $1.35 | $0.01 |
| 9 | HMA surf rem butt JT (40600982) | SY | 2,795 | $13.25 | $10.41 |
| 10 | P HMA BC IL-9.5FG N50 (40603215) | TON | 1,034 | $158.00 | $230.00 |
| 11 | P HMA SC 9.5FG C N50 (40604100) | TON | 2,570 | $159.00 | $200.00 |
| 12 | Agg wedge SHLD type B (48102100) | TON | 14 | $75.11 | $100.00 |
| 13 | FR & lids adjust (60300305) | EACH | 4 | $800.00 | $1,543.41 |
| 14 | Mobilization (67100100) | LS | 1 | $12,950 | $45,000 |
| 15 | Sign panel T1 (72000100) | SF | 8 | $50.00 | $63.00 |
| 16 | Metal post TY A (72900100) | LF | 47 | $19.80 | $11.62 |
| 17 | PT PVT MK LTRS & symb (78001100) | SF | 12 | $31.00 | $26.25 |
| 18 | Paint PVT MK line 4 (78001110) | LF | 2,925 | $3.10 | $1.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.