H. J. Eppel & Co.: IDOT bid record

H. J. Eppel & Co. submitted 33 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 9 of them (27%). When it was not low, its total sat a median +13% above the low bid.

Owner
Illinois DOT
Low bid volume
$8,646,112
Latest bid
12 JUN 2026
Data through
18 SEP 2026
33Bids
9Low bids
27Win rate, percent
+13%Median gap to the low bid when not low, 24 bids

By year

YearBidsLow bidsWin rate
20218113%
2022500%
20235240%
20246233%
20255360%
20264125%
H. J. Eppel & Co., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0326623%
District 057343%
H. J. Eppel & Co., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
HMA SC IL-9.5 C N5040604050TON149 (64%)$120.00$144.00
Earth excavation20200100CY178 (47%)$47.00$48.00
Agg wedge SHLD type B48102100TON136 (46%)$39.00$50.00
Comb curb gutter rem44000500LF106 (60%)$14.75$11.61
Incidental HMA surf40800050TON155 (33%)$215.00$250.00
HMA surf rem var DPX4401198SY135 (38%)$9.00$8.21
HMA BC IL-9.5FG N5040602965TON115 (45%)$109.00$120.00
Name plates51500100EACH95 (56%)$506.19$773.24
HMA BC IL-19.0 N5040603080TON85 (63%)$130.00$110.40
Temporary ramp40600990SY75 (71%)$22.00$19.46
Bit matls tack CT40600290LB294 (14%)$1.29$0.01
HMA surf rem 244000157SY84 (50%)$3.38$6.85
H. J. Eppel & Co., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

H. J. Eppel & Co., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 JUN 202670F48District 05Section LEROY,TOWANDA,BLOOM1 of 2$763,289Low, 30% under the second
24 APR 202687900District 03Project Number: 2Hsr-970 / /, section 22-00201-04-RS2 of 2$884,329+10%
27 FEB 202691660District 05Project Number: Hxmm-530 / /, section 24-00170-01-RS2 of 2$2,320,746+5.0%
16 JAN 202666R58District 03Section (112X)CLV-23 of 4$807,751+18%
25 APR 202566R28District 03Section (112X)CLV-11 of 4$257,331Low, 0.0% under the second
25 APR 202587862District 03Project Number: 6F7S-297 / /, section 21-00229-00-RS1 of 2$1,638,174Low, 2.0% under the second
07 MAR 202566P95District 03Section (FRONTAGE2 of 3$191,099+6.0%
07 MAR 202566R09District 03Section (12,13)G,SR1 of 2$88,186Low, 17% under the second
07 MAR 202591644District 05Project Number: Uin2-240 / /, section 22-00046-15-RS2 of 2$3,600,079+13%
26 APR 202466N44District 03Section (849E)MG,RS1 of 2$781,331Low, 9.0% under the second
26 APR 202487831District 03Project Number: 9P1Q-781 / /, section 20-00146-04-RS2 of 2$2,871,208+14%
08 MAR 202470F49District 05Section LEROY,TOWANDA,BLOOM1 of 2$255,057Low, 22% under the second
08 MAR 202491637District 05Project Number: Atpl-285 / /, section 21-00152-02-RS2 of 2$3,131,898+5.0%
19 JAN 202466N34District 03Section (108)SFY3 of 3$1,699,985+28%
19 JAN 202487822District 03Project Number: 0Wkf-381 / /, section 11-14106-03-BR3 of 3$584,504+18%
10 MAR 202366M64District 03Section (112X)CLV3 of 3$468,297+22%
10 MAR 202366N13District 03Section (401S)RS,MG1 of 2$203,759Low, 31% under the second
10 MAR 202387803District 03Project Number: Kek8-123 / /, section 20-00135-04-RS1 of 2$2,004,192Low, 2.0% under the second
10 MAR 202387813District 03Streator, section 22-00105-00-SW3 of 3$576,933+38%
20 JAN 202387798District 03Project Number: X9Pu-902 / /, section 18-00140-00-RS2 of 3$460,673+16%
23 SEP 202266F92District 03Section (108BR-4)BR3 of 3$1,252,744+22%
29 APR 202287787District 03Streator, section 18-00101-00-RS2 of 3$3,576,475+7.0%
11 MAR 202287773District 03Project Number: Nqqe-685 / /, section 18-17119-02-BR2 of 3$416,832+3.0%
11 MAR 202287774District 03Project Number: 1R0F-397 / /, section 18-29131-00-BR2 of 3$396,113+2.0%
11 MAR 202287775District 03Project Number: 1Klq-976 / /, section 18-00120-03-RS2 of 2$2,245,419+8.0%
H. J. Eppel & Co.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy