H. J. Eppel & Co.: IDOT bid record
H. J. Eppel & Co. submitted 33 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 9 of them (27%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $8,646,112
- Latest bid
- 12 JUN 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 8 | 1 | 13% |
| 2022 | 5 | 0 | 0% |
| 2023 | 5 | 2 | 40% |
| 2024 | 6 | 2 | 33% |
| 2025 | 5 | 3 | 60% |
| 2026 | 4 | 1 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 03 | 26 | 6 | 23% |
| District 05 | 7 | 3 | 43% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| HMA SC IL-9.5 C N50 | 40604050 | TON | 14 | 9 (64%) | $120.00 | $144.00 |
| Earth excavation | 20200100 | CY | 17 | 8 (47%) | $47.00 | $48.00 |
| Agg wedge SHLD type B | 48102100 | TON | 13 | 6 (46%) | $39.00 | $50.00 |
| Comb curb gutter rem | 44000500 | LF | 10 | 6 (60%) | $14.75 | $11.61 |
| Incidental HMA surf | 40800050 | TON | 15 | 5 (33%) | $215.00 | $250.00 |
| HMA surf rem var DP | X4401198 | SY | 13 | 5 (38%) | $9.00 | $8.21 |
| HMA BC IL-9.5FG N50 | 40602965 | TON | 11 | 5 (45%) | $109.00 | $120.00 |
| Name plates | 51500100 | EACH | 9 | 5 (56%) | $506.19 | $773.24 |
| HMA BC IL-19.0 N50 | 40603080 | TON | 8 | 5 (63%) | $130.00 | $110.40 |
| Temporary ramp | 40600990 | SY | 7 | 5 (71%) | $22.00 | $19.46 |
| Bit matls tack CT | 40600290 | LB | 29 | 4 (14%) | $1.29 | $0.01 |
| HMA surf rem 2 | 44000157 | SY | 8 | 4 (50%) | $3.38 | $6.85 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Kankakee Valley Construction Company, Inc. | 12 | 8 of 12 |
| Tobey's Construction & Cartage, Inc. | 12 | 10 of 12 |
| Riber Construction, Inc. | 6 | 5 of 6 |
| Rowe Construction, a div of UCM, Inc. | 6 | 4 of 6 |
| Phoenix Corporation of the Quad Cities | 3 | 2 of 3 |
| Scanlon Excavating & Concrete, Inc. | 3 | 2 of 3 |
| Stark Excavating, Inc. | 2 | 1 of 2 |
| Gensini Excavating, Inc. | 2 | 2 of 2 |
| Opperman Construction Co. | 2 | 1 of 2 |
| Iroquois Paving Corporation | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JUN 2026 | 70F48 | District 05 | Section LEROY,TOWANDA,BLOOM | 1 of 2 | $763,289 | Low, 30% under the second |
| 24 APR 2026 | 87900 | District 03 | Project Number: 2Hsr-970 / /, section 22-00201-04-RS | 2 of 2 | $884,329 | +10% |
| 27 FEB 2026 | 91660 | District 05 | Project Number: Hxmm-530 / /, section 24-00170-01-RS | 2 of 2 | $2,320,746 | +5.0% |
| 16 JAN 2026 | 66R58 | District 03 | Section (112X)CLV-2 | 3 of 4 | $807,751 | +18% |
| 25 APR 2025 | 66R28 | District 03 | Section (112X)CLV-1 | 1 of 4 | $257,331 | Low, 0.0% under the second |
| 25 APR 2025 | 87862 | District 03 | Project Number: 6F7S-297 / /, section 21-00229-00-RS | 1 of 2 | $1,638,174 | Low, 2.0% under the second |
| 07 MAR 2025 | 66P95 | District 03 | Section (FRONTAGE | 2 of 3 | $191,099 | +6.0% |
| 07 MAR 2025 | 66R09 | District 03 | Section (12,13)G,SR | 1 of 2 | $88,186 | Low, 17% under the second |
| 07 MAR 2025 | 91644 | District 05 | Project Number: Uin2-240 / /, section 22-00046-15-RS | 2 of 2 | $3,600,079 | +13% |
| 26 APR 2024 | 66N44 | District 03 | Section (849E)MG,RS | 1 of 2 | $781,331 | Low, 9.0% under the second |
| 26 APR 2024 | 87831 | District 03 | Project Number: 9P1Q-781 / /, section 20-00146-04-RS | 2 of 2 | $2,871,208 | +14% |
| 08 MAR 2024 | 70F49 | District 05 | Section LEROY,TOWANDA,BLOOM | 1 of 2 | $255,057 | Low, 22% under the second |
| 08 MAR 2024 | 91637 | District 05 | Project Number: Atpl-285 / /, section 21-00152-02-RS | 2 of 2 | $3,131,898 | +5.0% |
| 19 JAN 2024 | 66N34 | District 03 | Section (108)SFY | 3 of 3 | $1,699,985 | +28% |
| 19 JAN 2024 | 87822 | District 03 | Project Number: 0Wkf-381 / /, section 11-14106-03-BR | 3 of 3 | $584,504 | +18% |
| 10 MAR 2023 | 66M64 | District 03 | Section (112X)CLV | 3 of 3 | $468,297 | +22% |
| 10 MAR 2023 | 66N13 | District 03 | Section (401S)RS,MG | 1 of 2 | $203,759 | Low, 31% under the second |
| 10 MAR 2023 | 87803 | District 03 | Project Number: Kek8-123 / /, section 20-00135-04-RS | 1 of 2 | $2,004,192 | Low, 2.0% under the second |
| 10 MAR 2023 | 87813 | District 03 | Streator, section 22-00105-00-SW | 3 of 3 | $576,933 | +38% |
| 20 JAN 2023 | 87798 | District 03 | Project Number: X9Pu-902 / /, section 18-00140-00-RS | 2 of 3 | $460,673 | +16% |
| 23 SEP 2022 | 66F92 | District 03 | Section (108BR-4)BR | 3 of 3 | $1,252,744 | +22% |
| 29 APR 2022 | 87787 | District 03 | Streator, section 18-00101-00-RS | 2 of 3 | $3,576,475 | +7.0% |
| 11 MAR 2022 | 87773 | District 03 | Project Number: Nqqe-685 / /, section 18-17119-02-BR | 2 of 3 | $416,832 | +3.0% |
| 11 MAR 2022 | 87774 | District 03 | Project Number: 1R0F-397 / /, section 18-29131-00-BR | 2 of 3 | $396,113 | +2.0% |
| 11 MAR 2022 | 87775 | District 03 | Project Number: 1Klq-976 / /, section 18-00120-03-RS | 2 of 2 | $2,245,419 | +8.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.