Scanlon Excavating & Concrete, Inc.: IDOT bid record
Scanlon Excavating & Concrete, Inc. submitted 36 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 07 NOV 2025, and was the low bidder on 4 of them (11%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $1,066,278
- Latest bid
- 07 NOV 2025
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 14 | 2 | 14% |
| 2022 | 7 | 1 | 14% |
| 2023 | 6 | 0 | 0% |
| 2024 | 2 | 0 | 0% |
| 2025 | 7 | 1 | 14% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 20 | 2 | 10% |
| District 03 | 15 | 1 | 7% |
| District 05 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Reg sub mon | 66901006 | CAL DAY | 14 | 14 (100%) | $100.00 | $820.00 |
| Temp info signing | Z0030850 | SF | 22 | 9 (41%) | $22.00 | $18.00 |
| Earth excavation | 20200100 | CY | 15 | 6 (40%) | $50.00 | $48.00 |
| Engr field office A | 67000400 | CAL MO | 6 | 6 (100%) | $500.00 | $2,550.00 |
| Sidewalk rem | 44000600 | SF | 15 | 5 (33%) | $3.00 | $3.00 |
| Trainees TPG | Z0076604 | HR | 5 | 5 (100%) | $15.00 | $15.00 |
| Nitrogen fert nutr | 25000400 | LB | 18 | 4 (22%) | $4.50 | $3.00 |
| Potassium fert nutr | 25000600 | LB | 18 | 4 (22%) | $4.50 | $3.00 |
| Perimeter eros bar | 28000400 | LF | 12 | 4 (33%) | $3.75 | $3.50 |
| Protective coat | 42001300 | SY | 8 | 4 (50%) | $1.00 | $1.00 |
| Bit matls PR CT | 40600275 | LB | 6 | 4 (67%) | $0.01 | $0.01 |
| Bit matls tack CT | 40600290 | LB | 13 | 3 (23%) | $1.25 | $0.01 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| D. Construction, Inc. | 7 | 7 of 7 |
| MYS, Incorporated | 6 | 3 of 6 |
| Gallagher Asphalt Corporation | 6 | 5 of 6 |
| G. M. Sipes Construction, Inc. | 5 | 3 of 5 |
| P. T. Ferro Construction Co. | 5 | 4 of 5 |
| Austin Tyler Construction, Inc. | 5 | 3 of 5 |
| Triggi Construction, Inc. | 4 | 2 of 4 |
| Alliance Contractors, Inc. | 4 | 2 of 4 |
| Copenhaver Construction, Inc. | 4 | 2 of 4 |
| Vixen Construction, Inc. | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 NOV 2025 | 62Y00 | District 01 | 2 of 6 | $398,798 | +15% | |
| 01 AUG 2025 | 62Y25 | District 01 | Section 2025-1071-DM | 5 of 6 | $561,263 | +65% |
| 13 JUN 2025 | 62X99 | District 01 | Section 2024-1057-DM | 2 of 6 | $485,023 | +3.0% |
| 25 APR 2025 | 61K61 | District 01 | Bolingbrook, section 10-00055-00-BR | 5 of 6 | $965,355 | +28% |
| 25 APR 2025 | 66R28 | District 03 | Section (112X)CLV-1 | 4 of 4 | $309,065 | +20% |
| 07 MAR 2025 | 62U89 | District 01 | Section FAI | 1 of 4 | $498,400 | Low, 48% under the second |
| 17 JAN 2025 | 62X54 | District 01 | Section 2024-1016-DM | 2 of 3 | $227,797 | +14% |
| 19 JAN 2024 | 62H58 | District 01 | Section 2018-118-RS | 5 of 5 | $237,845 | +12% |
| 19 JAN 2024 | 66M09 | District 03 | Section (108)CR-2507 | 3 of 4 | $715,987 | +26% |
| 17 NOV 2023 | 62H63 | District 01 | Section 2018-121-RS | 3 of 9 | $572,839 | +16% |
| 22 SEP 2023 | 62U22 | District 01 | Section FAP | 3 of 4 | $443,444 | +53% |
| 16 JUN 2023 | 62K05 | District 01 | Section 2019-132-DM&T | 2 of 5 | $478,415 | +38% |
| 16 JUN 2023 | 66N26 | District 03 | Section (TR | 3 of 3 | $553,550 | +48% |
| 10 MAR 2023 | 66M64 | District 03 | Section (112X)CLV | 2 of 3 | $413,975 | +8.0% |
| 20 JAN 2023 | 87759 | District 03 | Grant Park, section 17-00016-00-BT | 4 of 4 | $508,882 | +22% |
| 17 JUN 2022 | 61H51 | District 01 | Carol Stream, section 15-00060-00-BT | 4 of 6 | $649,387 | +25% |
| 17 JUN 2022 | 62P59 | District 01 | Section 2021-143-I | 4 of 5 | $778,032 | +8.0% |
| 17 JUN 2022 | 62P84 | District 01 | Section 2021-162-C | 1 of 4 | $96,015 | Low, 96% under the second |
| 29 APR 2022 | 62H62 | District 01 | Section 2018-120-RS | 5 of 6 | $595,929 | +35% |
| 11 MAR 2022 | 62R35 | District 01 | Section 2021-094-L | 3 of 4 | $209,280 | +54% |
| 21 JAN 2022 | 62P90 | District 01 | Section 2021-169-CR | 2 of 5 | $469,442 | +6.0% |
| 21 JAN 2022 | 87669 | District 03 | Bradley, section 17-00098-00-BT | 3 of 3 | $565,435 | +35% |
| 17 SEP 2021 | 66L97 | District 03 | Section (136)CLV | 2 of 4 | $92,370 | +33% |
| 30 JUL 2021 | 66L21 | District 03 | Section (130)CLV | 5 of 5 | $289,346 | +31% |
| 30 JUL 2021 | 66L83 | District 03 | Section 38(3-9)PP-2 | 5 of 5 | $599,549 | +34% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.