YearBidsLow bidsWin rate
202114214%
20227114%
2023600%
2024200%
20257114%
Scanlon Excavating & Concrete, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0120210%
District 031517%
District 0511100%
Scanlon Excavating & Concrete, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Reg sub mon66901006CAL DAY1414 (100%)$100.00$820.00
Temp info signingZ0030850SF229 (41%)$22.00$18.00
Earth excavation20200100CY156 (40%)$50.00$48.00
Engr field office A67000400CAL MO66 (100%)$500.00$2,550.00
Sidewalk rem44000600SF155 (33%)$3.00$3.00
Trainees TPGZ0076604HR55 (100%)$15.00$15.00
Nitrogen fert nutr25000400LB184 (22%)$4.50$3.00
Potassium fert nutr25000600LB184 (22%)$4.50$3.00
Perimeter eros bar28000400LF124 (33%)$3.75$3.50
Protective coat42001300SY84 (50%)$1.00$1.00
Bit matls PR CT40600275LB64 (67%)$0.01$0.01
Bit matls tack CT40600290LB133 (23%)$1.25$0.01
Scanlon Excavating & Concrete, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Scanlon Excavating & Concrete, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
07 NOV 202562Y00District 012 of 6$398,798+15%
01 AUG 202562Y25District 01Section 2025-1071-DM5 of 6$561,263+65%
13 JUN 202562X99District 01Section 2024-1057-DM2 of 6$485,023+3.0%
25 APR 202561K61District 01Bolingbrook, section 10-00055-00-BR5 of 6$965,355+28%
25 APR 202566R28District 03Section (112X)CLV-14 of 4$309,065+20%
07 MAR 202562U89District 01Section FAI1 of 4$498,400Low, 48% under the second
17 JAN 202562X54District 01Section 2024-1016-DM2 of 3$227,797+14%
19 JAN 202462H58District 01Section 2018-118-RS5 of 5$237,845+12%
19 JAN 202466M09District 03Section (108)CR-25073 of 4$715,987+26%
17 NOV 202362H63District 01Section 2018-121-RS3 of 9$572,839+16%
22 SEP 202362U22District 01Section FAP3 of 4$443,444+53%
16 JUN 202362K05District 01Section 2019-132-DM&T2 of 5$478,415+38%
16 JUN 202366N26District 03Section (TR3 of 3$553,550+48%
10 MAR 202366M64District 03Section (112X)CLV2 of 3$413,975+8.0%
20 JAN 202387759District 03Grant Park, section 17-00016-00-BT4 of 4$508,882+22%
17 JUN 202261H51District 01Carol Stream, section 15-00060-00-BT4 of 6$649,387+25%
17 JUN 202262P59District 01Section 2021-143-I4 of 5$778,032+8.0%
17 JUN 202262P84District 01Section 2021-162-C1 of 4$96,015Low, 96% under the second
29 APR 202262H62District 01Section 2018-120-RS5 of 6$595,929+35%
11 MAR 202262R35District 01Section 2021-094-L3 of 4$209,280+54%
21 JAN 202262P90District 01Section 2021-169-CR2 of 5$469,442+6.0%
21 JAN 202287669District 03Bradley, section 17-00098-00-BT3 of 3$565,435+35%
17 SEP 202166L97District 03Section (136)CLV2 of 4$92,370+33%
30 JUL 202166L21District 03Section (130)CLV5 of 5$289,346+31%
30 JUL 202166L83District 03Section 38(3-9)PP-25 of 5$599,549+34%
Scanlon Excavating & Concrete, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy