IDOT contract 62Y00 bid tabulation

. Let by Illinois DOT on November 7, 2025, Will, District 01. 6 bids received; low bid $346,900 by C & D Recycling Services, Inc..

Owner
Illinois DOT
Letting
07 NOV 2025
Pay items
41
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C & D Recycling Services, Inc.$346,900Low
2Scanlon Excavating & Concrete, Inc.$398,798+15%
3Veterans Vac Services LLC$470,755+36%
4K. L. F. Enterprises Inc.$713,532+106%
5MYS, Incorporated$764,273+120%
6Thor General Contracting LLC$1,460,539+321%
IDOT contract 62Y00: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C & D Recycling Services, Inc.2. Scanlon Excavating & Concrete, Inc.3. Veterans Vac Services LLC4. K. L. F. Enterprises Inc.5. MYS, Incorporated6. Thor General Contracting LLC
1Rem EX septic tank (X0488100)EACH3$0.01$3,250.00$1,500.00$2,500.00$6,832.01$3,000.00
2Fence removal (X6640104)LF1,195$0.01$3.00$0.01$3.00$9.68$5.00
3Temp CH LK fence 6 FT (X6640206)LF3,400$0.01$0.01$1.00$4.00$26.83$20.00
4Temp info signing (X7200061)SF468$0.01$1.00$0.01$5.00$28.26$8.00
5BLDG remov no 1 (Z0007601)LS1$25,820$24,000$20,500$38,890$28,822$29,900
6BLDG remov no 2 (Z0007602)LS1$24,955$24,000$21,500$39,008$23,736$29,900
7BLDG remov no 3 (Z0007603)LS1$24,320$24,000$22,500$38,097$23,736$29,900
8BLDG remov no 4 (Z0007604)LS1$24,455$24,000$21,500$34,950$25,431$29,900
9BLDG remov no 5 (Z0007605)LS1$33,120$24,000$42,500$44,870$33,343$29,900
10BLDG remov no 6 (Z0007606)LS1$24,455$24,000$22,500$37,545$26,561$29,900
11BLDG remov no 7 (Z0007607)LS1$35,620$24,000$22,500$39,872$27,126$29,900
12BLDG remov no 8 (Z0007608)LS1$25,320$24,000$23,250$47,371$28,822$29,900
13BLDG remov no 9 (Z0007609)LS1$27,120$24,000$22,500$38,148$24,866$29,900
14BLDG remov no 10 (Z0007610)LS1$21,320$24,000$21,500$37,565$24,866$29,900
15BLDG remov no 11 (Z0007611)LS1$37,120$24,000$22,500$36,039$27,691$29,900
16R&D friabl asb BLD 2 (Z0049802)LS1$0.01$2,500.00$900.00$1,512.00$1,667.71$25,900
17R&D friabl asb BLD 4 (Z0049804)LS1$0.01$3,800.00$3,500.00$3,025.00$3,941.87$25,900
18R&D friabl asb BLD 5 (Z0049805)LS1$0.01$3,200.00$1,750.00$1,512.00$3,638.65$25,900
19R&D friabl asb BLD 6 (Z0049806)LS1$0.01$2,500.00$1,750.00$1,512.00$2,274.16$25,900
20R&D friabl asb BLD 11 (Z0049811)LS1$0.01$7,500.00$12,450$15,263$22,742$25,900
21R&D non-FR asb BLD 1 (Z0049901)LS1$0.01$2,500.00$1,750.00$0.01$1,970.93$25,900
22R&D non-FR asb BLD 2 (Z0049902)LS1$0.01$1,500.00$900.00$0.01$1,667.71$25,900
23R&D non-FR asb BLD 6 (Z0049906)LS1$0.01$7,500.00$21,500$7,563.00$24,258$25,900
24R&D non-FR asb BLD 7 (Z0049907)LS1$0.01$11,500$21,500$10,725$30,140$25,900
25R&D non-FR asb BLD 9 (Z0049909)LS1$0.01$4,200.00$5,500.00$4,538.00$14,403$25,900
26R&D non-FR asb BLD 11 (Z0049911)LS1$0.01$3,200.00$3,500.00$3,025.00$5,306.36$25,900
27Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00$15.00$15.00
28Tree remov 6-15 (20100110)UNIT106$27.00$30.00$30.00$36.00$33.91$71.50
29Tree remov over 15 (20100210)UNIT373$34.00$35.00$35.00$42.00$39.56$81.50
30Topsoil F & P 6 (21101625)SY6,687$0.01$0.01$4.00$12.00$9.04$50.00
31Seeding CL 2 (25000200)ACRE1.38$0.01$5,000.00$4,500.00$724.00$3,955.92$10,019
32Nitrogen fert nutr (25000400)LB124$0.01$5.00$5.00$8.00$5.65$170.00
33Potassium fert nutr (25000600)LB124$0.01$5.00$5.00$8.00$5.65$170.00
34Mulch method 1 (25100105)ACRE1.40$0.01$5,000.00$7,200.00$8.00$3,955.92$60,984
35Perimeter eros bar (28000400)LF3,163$0.01$0.01$6.00$3.00$3.96$18.00
36Drive pavement rem (44000200)SY568$0.01$6.00$4.00$75.00$40.69$65.00
37Sidewalk rem (44000600)SF4,334$0.01$2.00$2.00$2.00$2.94$7.00
38CH LK gate 6X12 singl (66403500)EACH11$0.01$1.00$1.00$2,500.00$1,111.05$350.00
39Mobilization (67100100)LS1$20,030$18,000$26,646$5,000.00$26,133$110,784
40TR cont & prot 701501 (70102620)LS1$0.01$1,000.00$0.01$1,000.00$33,908$1.00
41TR cont & prot 701606 (70102625)LS1$0.01$1,000.00$0.01$1,000.00$1,412.83$1.00
IDOT contract 62Y00: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy