IDOT contract 62U89 bid tabulation

Section FAI. Let by Illinois DOT on March 7, 2025, Will, District 01. 4 bids received; low bid $498,400 by Scanlon Excavating & Concrete, Inc..

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
43
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Scanlon Excavating & Concrete, Inc.$498,400Low
2P. T. Ferro Construction Co.$736,294+48%
3Austin Tyler Construction, Inc.$779,720+56%
4Phoenix Corporation of the Quad Cities$1,127,007+126%
IDOT contract 62U89: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Scanlon Excavating & Concrete, Inc.2. P. T. Ferro Construction Co.3. Austin Tyler Construction, Inc.4. Phoenix Corporation of the Quad Cities
1Fence removal (X6640104)LF2,878$1.50$0.01$11.50$12.00
2Temp CH LK fence 6 FT (X6640206)LF5,815$1.00$5.00$12.50$11.00
3BLDG remov no 1 (Z0007601)LS1$14,500$31,000$22,150$32,500
4BLDG remov no 2 (Z0007602)LS1$21,000$41,500$30,150$33,100
5BLDG remov no 3 (Z0007603)LS1$24,000$38,500$43,800$89,000
6BLDG remov no 4 (Z0007604)LS1$29,000$31,000$35,900$32,900
7BLDG remov no 5 (Z0007605)LS1$29,000$39,500$38,650$51,300
8BLDG remov no 6 (Z0007606)LS1$35,000$30,500$35,650$44,200
9BLDG remov no 7 (Z0007607)LS1$20,000$31,000$37,650$53,800
10BLDG remov no 8 (Z0007608)LS1$21,000$33,500$40,000$47,900
11BLDG remov no 9 (Z0007609)LS1$21,000$38,000$32,200$56,800
12BLDG remov no 10 (Z0007610)LS1$14,000$27,000$26,600$32,700
13BLDG remov no 11 (Z0007611)LS1$20,000$41,100$33,300$48,500
14BLDG remov no 12 (Z0007612)LS1$21,000$33,500$28,200$51,400
15BLDG remov no 13 (Z0007613)LS1$24,500$36,000$29,900$52,000
16BLDG remov no 14 (Z0007614)LS1$21,000$32,000$38,600$53,500
17BLDG remov no 15 (Z0007615)LS1$15,000$32,500$35,400$37,600
18Temp info signing (Z0030850)SF638$10.00$0.01$32.00$27.00
19R&D friabl asb BLD 1 (Z0049801)LS1$8,000.00$0.01$450.00$3,200.00
20R&D friabl asb BLD 5 (Z0049805)LS1$4,000.00$0.01$3,950.00$3,200.00
21R&D friabl asb BLD 8 (Z0049808)LS1$2,500.00$0.01$1,450.00$2,350.00
22R&D friabl asb BLD 9 (Z0049809)LS1$5,000.00$0.01$4,950.00$3,200.00
23R&D non-FR asb BLD 1 (Z0049901)LS1$3,500.00$0.01$0.01$3,200.00
24R&D non-FR asb BLD 2 (Z0049902)LS1$3,500.00$0.01$0.01$6,400.00
25R&D non-FR asb BLD 3 (Z0049903)LS1$3,500.00$0.01$0.01$6,400.00
26R&D non-FR asb BLD 5 (Z0049905)LS1$3,500.00$0.01$0.01$3,200.00
27R&D non-FR asb BLD 9 (Z0049909)LS1$2,000.00$0.01$0.01$3,200.00
28R&D non-FR asb BLD 11 (Z0049911)LS1$4,500.00$0.01$0.01$6,400.00
29R&D non-FR asb BLD 13 (Z0049913)LS1$5,000.00$0.01$0.01$4,000.00
30Tree remov 6-15 (20100110)UNIT227$30.00$30.00$30.00$41.00
31Tree remov over 15 (20100210)UNIT408$40.00$35.00$35.00$48.00
32Topsoil F & P 6 (21101625)SY13,934$1.00$6.00$0.01$6.50
33Seeding CL 2 (25000200)ACRE3$2,500.00$3,025.00$3,025.00$3,400.00
34Nitrogen fert nutr (25000400)LB259$3.00$2.00$2.00$8.00
35Potassium fert nutr (25000600)LB259$3.00$2.00$2.00$8.00
36Mulch method 1 (25100105)ACRE3$5,000.00$5,000.00$5,000.00$5,400.00
37Perimeter eros bar (28000400)LF5,519$0.50$3.00$2.50$6.50
38Drive pavement rem (44000200)SY806$8.00$0.01$17.00$14.50
39Sidewalk rem (44000600)SF4,365$1.50$0.01$2.00$1.75
40CH LK gates 6X12 DBL (66407600)EACH15$1.00$0.01$400.00$475.00
41Mobilization (67100100)LS1$25,000$44,170$46,000$30,000
42TR cont & prot 701501 (70102620)LS1$2,500.00$0.01$0.01$3,500.00
43TR cont & prot 701606 (70102625)LS1$2,500.00$0.01$0.01$3,500.00
IDOT contract 62U89: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy