IDOT contract 87862 bid tabulation

Project Number: 6F7S-297 / /, section 21-00229-00-RS. Let by Illinois DOT on April 25, 2025, Livingston, District 03. 2 bids received; low bid $1,638,174 by H. J. Eppel & Co..

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
19
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1H. J. Eppel & Co.$1,638,174Low
2Kankakee Valley Construction Company, Inc.$1,671,174+2.0%
IDOT contract 87862: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. H. J. Eppel & Co.2. Kankakee Valley Construction Company, Inc.
1HMA surf rem var DP (X4401198)SY3,840$12.00$3.20
2Traf cont & prot SPL (X7010216)LS1$65,000$50,000
3RR prot liability ins (Z0048665)LS1$4,800.00$6,000.00
4Bit matls tack CT (40600290)LB52,262$1.05$0.01
5HMA BC IL-9.5FG N50 (40602965)TON3,364$104.00$106.00
6P HMA BC IL-4.75 N50 (40603200)TON1,154$150.00$151.00
7HMA SC IL-9.5FG C N50 (40604000)TON5,104$108.00$106.00
8Incidental HMA surf (40800050)TON541$185.00$210.00
9HMA surf rem 1 1/4 (44000154)SY4,889$2.20$4.75
10HMA surf rem 2 (44000157)SY56,929$2.90$3.60
11Agg wedge SHLD type B (48102100)TON1,565$34.00$39.00
12Mobilization (67100100)LS1$19,000$99,000
13Short term pavt mking (70300100)LF11,689$0.90$0.01
14SHRT TRM pavt MK rem (70300150)SF829$1.05$0.01
15THPL PVT MK LTR & sym (78000100)SF184.80$35.00$29.00
16THPL PVT MK line 24 (78000650)LF169$34.00$28.50
17Paint PVT MK line 4 (78001110)LF79,511$0.21$0.18
18GRV RCSD PM LTR & sym (78011000)SF184.80$14.00$12.00
19GRV RCSD PVT MRKG 25 (78011125)LF169$13.00$11.00
IDOT contract 87862: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy