IDOT contract 87862 bid tabulation
Project Number: 6F7S-297 / /, section 21-00229-00-RS. Let by Illinois DOT on April 25, 2025, Livingston, District 03. 2 bids received; low bid $1,638,174 by H. J. Eppel & Co..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 19
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | H. J. Eppel & Co. | $1,638,174 | Low |
| 2 | Kankakee Valley Construction Company, Inc. | $1,671,174 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. H. J. Eppel & Co. | 2. Kankakee Valley Construction Company, Inc. |
|---|---|---|---|---|---|
| 1 | HMA surf rem var DP (X4401198) | SY | 3,840 | $12.00 | $3.20 |
| 2 | Traf cont & prot SPL (X7010216) | LS | 1 | $65,000 | $50,000 |
| 3 | RR prot liability ins (Z0048665) | LS | 1 | $4,800.00 | $6,000.00 |
| 4 | Bit matls tack CT (40600290) | LB | 52,262 | $1.05 | $0.01 |
| 5 | HMA BC IL-9.5FG N50 (40602965) | TON | 3,364 | $104.00 | $106.00 |
| 6 | P HMA BC IL-4.75 N50 (40603200) | TON | 1,154 | $150.00 | $151.00 |
| 7 | HMA SC IL-9.5FG C N50 (40604000) | TON | 5,104 | $108.00 | $106.00 |
| 8 | Incidental HMA surf (40800050) | TON | 541 | $185.00 | $210.00 |
| 9 | HMA surf rem 1 1/4 (44000154) | SY | 4,889 | $2.20 | $4.75 |
| 10 | HMA surf rem 2 (44000157) | SY | 56,929 | $2.90 | $3.60 |
| 11 | Agg wedge SHLD type B (48102100) | TON | 1,565 | $34.00 | $39.00 |
| 12 | Mobilization (67100100) | LS | 1 | $19,000 | $99,000 |
| 13 | Short term pavt mking (70300100) | LF | 11,689 | $0.90 | $0.01 |
| 14 | SHRT TRM pavt MK rem (70300150) | SF | 829 | $1.05 | $0.01 |
| 15 | THPL PVT MK LTR & sym (78000100) | SF | 184.80 | $35.00 | $29.00 |
| 16 | THPL PVT MK line 24 (78000650) | LF | 169 | $34.00 | $28.50 |
| 17 | Paint PVT MK line 4 (78001110) | LF | 79,511 | $0.21 | $0.18 |
| 18 | GRV RCSD PM LTR & sym (78011000) | SF | 184.80 | $14.00 | $12.00 |
| 19 | GRV RCSD PVT MRKG 25 (78011125) | LF | 169 | $13.00 | $11.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.