IDOT contract 91640 bid tabulation
Project Number:, section 23-00001-06-BT. Let by Illinois DOT on March 7, 2025, Mclean, District 05. 1 bid received; low bid $3,355,065 by Rowe Construction, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 68
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rowe Construction, a div of UCM, Inc. | $3,355,065 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rowe Construction, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | Shoulder excavation (XX006985) | CY | 141 | $213.44 |
| 2 | FL beacon P MTD SP in (X0325714) | EACH | 2 | $9,350.00 |
| 3 | Fold down bollards (X0350805) | EACH | 9 | $3,000.00 |
| 4 | Bit surf treatmnt A2 (X1500005) | SY | 5,117 | $10.89 |
| 5 | GR stab geosynthetic (X2100106) | SY | 1,500 | $6.30 |
| 6 | Bit matls FS (X4060107) | LB | 7,371 | $1.93 |
| 7 | HMA surf rem var DP (X4401198) | SY | 122 | $79.48 |
| 8 | Inlets TA W/SPL F&G (X6023508) | EACH | 2 | $1,855.93 |
| 9 | Inlets TB W/SPL F&G (X6024502) | EACH | 1 | $3,426.14 |
| 10 | Inlets reconst SPL (X6026800) | EACH | 1 | $7,114.61 |
| 11 | Traf cont & prot SPL (X7010216) | LS | 1 | $147,179 |
| 12 | Construction layout (Z0013798) | LS | 1 | $50,000 |
| 13 | Earth excavation (20200100) | CY | 8,572 | $38.50 |
| 14 | Rem & disp uns matl (20201200) | CY | 1,000 | $28.05 |
| 15 | Furnished excavation (20400800) | CY | 3,168 | $41.25 |
| 16 | Topsoil F & P 4 (21101615) | SY | 34,717 | $7.15 |
| 17 | Seeding CL 2A (25000210) | ACRE | 7.25 | $1,215.50 |
| 18 | Nitrogen fert nutr (25000400) | LB | 652 | $1.10 |
| 19 | Phosphorus fert nutr (25000500) | LB | 652 | $1.10 |
| 20 | Potassium fert nutr (25000600) | LB | 652 | $1.10 |
| 21 | Mulch method 2 (25100115) | ACRE | 7.25 | $1,215.50 |
| 22 | Temp eros contr seed (28000250) | LB | 1,450 | $5.93 |
| 23 | Temp ditch checks (28000305) | LF | 550 | $11.00 |
| 24 | Perimeter eros bar (28000400) | LF | 11,862 | $2.59 |
| 25 | Inlet & pipe protect (28000500) | EACH | 11 | $200.94 |
| 26 | Inlet filters (28000510) | EACH | 5 | $354.16 |
| 27 | Sub gran mat B (31101000) | TON | 13,521 | $64.24 |
| 28 | Bit matls PR CT (40600275) | LB | 62,110 | $0.01 |
| 29 | Bit matls tack CT (40600290) | LB | 5,584 | $1.54 |
| 30 | HMA BC IL-9.5FG N50 (40602965) | TON | 2,103 | $150.00 |
| 31 | HMA SC IL-9.5 C N50 (40604050) | TON | 2,103 | $150.00 |
| 32 | Protective coat (42001300) | SY | 1,632 | $0.01 |
| 33 | PCC driveway pavt 6 (42300200) | SY | 296 | $118.32 |
| 34 | PCC driveway pavt 8 (42300400) | SY | 189 | $122.73 |
| 35 | PC conc sidewalk 6 (42400300) | SF | 2,287 | $25.60 |
| 36 | Detectable warnings (42400800) | SF | 318 | $46.66 |
| 37 | Drive pavement rem (44000200) | SY | 413 | $27.34 |
| 38 | Comb curb gutter rem (44000500) | LF | 102 | $13.84 |
| 39 | Sidewalk rem (44000600) | SF | 4,359 | $4.78 |
| 40 | Aggregate SHLDS B (48101200) | TON | 1,750 | $61.36 |
| 41 | Pipe culvert remov (50105220) | LF | 344 | $24.19 |
| 42 | P cul CL A 1 15 (542A0220) | LF | 12 | $214.97 |
| 43 | P cul CL A 1 18 (542A0223) | LF | 28 | $115.00 |
| 44 | P cul CL A 1 24 (542A0229) | LF | 8 | $184.78 |
| 45 | P cul CL A 1 36 (542A0241) | LF | 50 | $250.00 |
| 46 | P cul CL C 1 12 (542C0217) | LF | 108 | $108.92 |
| 47 | P cul CL C 1 15 (542C0220) | LF | 74 | $72.03 |
| 48 | End sections 12 (54213447) | EACH | 2 | $1,108.69 |
| 49 | End sections 15 (54213450) | EACH | 3 | $1,153.73 |
| 50 | PRC flar end sec 15 (54213660) | EACH | 1 | $1,879.95 |
| 51 | PRC flar end sec 18 (54213663) | EACH | 1 | $2,037.94 |
| 52 | PRC flar end sec 24 (54213669) | EACH | 1 | $2,846.12 |
| 53 | PRC flar end sec 36 (54213681) | EACH | 3 | $3,851.18 |
| 54 | Storm sew CL B 1 12 (550B0050) | LF | 345 | $88.25 |
| 55 | Storm sew CL B 1 15 (550B0070) | LF | 432 | $98.11 |
| 56 | Storm sew CL B 1 24 (550B0120) | LF | 8 | $272.01 |
| 57 | Man TA 5 dia T1F OL (60221000) | EACH | 1 | $6,623.65 |
| 58 | Inlets TA T3F&G (60235700) | EACH | 1 | $1,994.55 |
| 59 | Inlets TB T1F CL (60240215) | EACH | 1 | $3,338.33 |
| 60 | Comb CC&G TY B-6.24 (60605000) | LF | 221 | $158.78 |
| 61 | Mobilization (67100100) | LS | 1 | $150,000 |
| 62 | Sign panel T1 (72000100) | SF | 302 | $33.00 |
| 63 | Teles STL sin support (72800100) | LF | 820 | $23.38 |
| 64 | THPL PVT MK LTR & sym (78000100) | SF | 307 | $15.40 |
| 65 | THPL PVT MK line 4 (78000200) | LF | 1,352 | $2.87 |
| 66 | THPL PVT MK line 6 (78000400) | LF | 577 | $4.31 |
| 67 | THPL PVT MK line 12 (78000600) | LF | 1,025 | $8.61 |
| 68 | THPL PVT MK line 24 (78000650) | LF | 63 | $17.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.