IDOT contract 70F19 bid tabulation
. Let by Illinois DOT on November 7, 2025, Mclean, District 05. 1 bid received; low bid $8,303,728 by Rowe Construction, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 124
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rowe Construction, a div of UCM, Inc. | $8,303,728 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rowe Construction, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | T-aesculus gla 2 (A2002016) | EACH | 5 | $539.00 |
| 2 | T-lirioden tul 2 (A2005416) | EACH | 4 | $346.50 |
| 3 | T-nyssa sylvat 2 (A2005516) | EACH | 4 | $346.50 |
| 4 | Survey marker T2 SPL (XZ193400) | EACH | 7 | $850.00 |
| 5 | PCC driveway PVT 6 SP (X4230710) | SY | 37 | $400.00 |
| 6 | HMA surf rem SPL (X4400196) | SY | 2,302 | $35.00 |
| 7 | Pipe handrail SPL (X5091765) | LF | 5 | $854.70 |
| 8 | Pro SS conn to EX SS (X5510012) | EACH | 26 | $1,782.19 |
| 9 | Man adj new T1F CL SP (X6025800) | EACH | 18 | $2,615.06 |
| 10 | Traf cont & prot SPL (X7010216) | LS | 1 | $375,000 |
| 11 | Temp info signing (X7200061) | SF | 84 | $49.50 |
| 12 | Concrete steps (Z0012450) | CY | 4.60 | $3,850.00 |
| 13 | Conc step remov (Z0012455) | EACH | 21 | $2,768.43 |
| 14 | Construction layout (Z0013798) | LS | 1 | $190,000 |
| 15 | RR prot liability ins (Z0048665) | LS | 1 | $15,000 |
| 16 | Storm sew WM req 12 (Z0056608) | LF | 486 | $233.20 |
| 17 | Conc retain wall rem (Z0075496) | LF | 324 | $199.83 |
| 18 | Trainees (Z0076600) | HR | 3,000 | $0.80 |
| 19 | Trainees TPG (Z0076604) | HR | 3,000 | $15.00 |
| 20 | Tree remov 6-15 (20100110) | UNIT | 77 | $123.70 |
| 21 | Tree remov over 15 (20100210) | UNIT | 114 | $167.40 |
| 22 | Tree trunk protection (20101100) | EACH | 51 | $496.69 |
| 23 | Earth excavation (20200100) | CY | 2,031 | $125.21 |
| 24 | Trench backfill (20800150) | CY | 134.30 | $136.22 |
| 25 | Seeding CL 7 (25000350) | ACRE | 2 | $1,320.00 |
| 26 | Nitrogen fert nutr (25000400) | LB | 115 | $2.20 |
| 27 | Phosphorus fert nutr (25000500) | LB | 115 | $2.20 |
| 28 | Potassium fert nutr (25000600) | LB | 115 | $2.20 |
| 29 | Mulch method 2 (25100115) | ACRE | 2 | $935.00 |
| 30 | Sodding salt tolerant (25200110) | SY | 7,541 | $25.78 |
| 31 | Supple watering (25200200) | UNIT | 52.10 | $110.00 |
| 32 | Temp eros contr seed (28000250) | LB | 1,600 | $5.15 |
| 33 | Perimeter eros bar (28000400) | LF | 948 | $7.04 |
| 34 | Inlet filters (28000510) | EACH | 52 | $318.56 |
| 35 | Sub gran mat B 4 (31101200) | SY | 56 | $53.12 |
| 36 | Sub gran mat B 12 (31101810) | SY | 157 | $66.01 |
| 37 | PCC base cse W 9.5 (35400450) | SY | 99 | $182.50 |
| 38 | Bit matls tack CT (40600290) | LB | 16,594 | $4.05 |
| 39 | Long joint sealant (40600370) | LF | 6,730 | $4.50 |
| 40 | Temporary ramp (40600990) | SY | 802 | $48.70 |
| 41 | P HMA BC IL-9.5FG N70 (40603218) | TON | 626 | $220.00 |
| 42 | P HMA BC IL19.0 N70 (40603235) | TON | 2,146 | $215.00 |
| 43 | P SC SMA 9.5 E N80 (40605024) | TON | 1,985 | $240.00 |
| 44 | Incidental HMA surf (40800050) | TON | 248 | $400.00 |
| 45 | PCC driveway pavt 6 (42300200) | SY | 1,243 | $177.32 |
| 46 | PCC driveway pavt 8 (42300400) | SY | 535 | $186.63 |
| 47 | PC conc sidewalk 5 (42400200) | SF | 26,338 | $26.50 |
| 48 | Detectable warnings (42400800) | SF | 995 | $52.46 |
| 49 | HMA surf rem 1 1/2 (44000155) | SY | 9,164 | $9.50 |
| 50 | HMA surf rem 2 3/4 (44000160) | SY | 8,407 | $13.00 |
| 51 | HMA surf rem 3 (44000161) | SY | 1,554 | $13.00 |
| 52 | HMA surf rem 4 1/2 (44000167) | SY | 1,425 | $13.00 |
| 53 | HMA surf rem 5 (44000169) | SY | 3,678 | $13.00 |
| 54 | Drive pavement rem (44000200) | SY | 1,460 | $33.59 |
| 55 | Curb rem (44000300) | LF | 4,443 | $25.91 |
| 56 | Comb curb gutter rem (44000500) | LF | 7,162 | $32.27 |
| 57 | Sidewalk rem (44000600) | SF | 24,257 | $7.00 |
| 58 | CL B patch T2 10 (44200970) | SY | 87 | $375.00 |
| 59 | Dowel bars 1 (44201297) | EACH | 220 | $32.76 |
| 60 | CL D patch T1 10 (44201761) | SY | 232 | $325.00 |
| 61 | CL D patch T2 10 (44201765) | SY | 324 | $300.00 |
| 62 | CL D patch T3 10 (44201769) | SY | 393 | $275.00 |
| 63 | CL D patch T4 10 (44201771) | SY | 319 | $260.00 |
| 64 | Saw cuts (44213200) | LF | 380 | $9.38 |
| 65 | Tie bars 1 (44213202) | EACH | 100 | $35.23 |
| 66 | Structure excavation (50200100) | CY | 716 | $93.50 |
| 67 | Reinforcement bars (50800105) | LB | 9,170 | $5.50 |
| 68 | Reinf bars, epoxy CTD (50800205) | LB | 660 | $5.50 |
| 69 | Conc STR retain wall (52200900) | CY | 129.20 | $3,300.00 |
| 70 | Storm sew CL A 1 12 (550A0050) | LF | 120 | $257.96 |
| 71 | Storm sew CL A 2 12 (550A0340) | LF | 66 | $201.16 |
| 72 | Storm sewer rem 10 (55100400) | LF | 8 | $118.21 |
| 73 | Storm sewer rem 12 (55100500) | LF | 481 | $37.24 |
| 74 | Storm sewer rem 15 (55100700) | LF | 37 | $51.12 |
| 75 | Water valves adjust (56109210) | EACH | 31 | $1,155.37 |
| 76 | Granular backfill STR (58600101) | CY | 116 | $126.50 |
| 77 | Geocomposite wall DR (59100100) | SY | 174 | $88.00 |
| 78 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $7,108.17 |
| 79 | Man TA 4 dia T3F&G (60218500) | EACH | 1 | $7,711.98 |
| 80 | Inlets TA T3F&G (60235700) | EACH | 41 | $2,590.01 |
| 81 | Inlets TB T3F&G (60240220) | EACH | 6 | $3,498.52 |
| 82 | Man adj new T1F CL (60255800) | EACH | 1 | $2,459.21 |
| 83 | Inlets adj new T1F OL (60260300) | EACH | 1 | $3,182.80 |
| 84 | Remov inlets (60500060) | EACH | 39 | $521.73 |
| 85 | Comb CC&G TB6.18 aep (60604500) | LF | 6,896 | $90.00 |
| 86 | Comb CC&G TY B-6.24 (60605000) | LF | 237 | $150.00 |
| 87 | Comb CC&G TB6.24 aep (60605100) | LF | 5,456 | $105.00 |
| 88 | Non SPL waste disposl (66900200) | CY | 350 | $186.52 |
| 89 | Soil disposal analy (66900530) | EACH | 24 | $1,200.00 |
| 90 | Reg sub P-const plan (66901001) | LS | 1 | $3,500.00 |
| 91 | Reg sub F con report (66901003) | LS | 1 | $1,500.00 |
| 92 | Reg sub mon (66901006) | CAL DAY | 24 | $1,300.00 |
| 93 | Engr field office B (67000500) | CAL MO | 14 | $4,000.00 |
| 94 | Mobilization (67100100) | LS | 1 | $600,000 |
| 95 | TR cont surveillance (70103815) | CAL DAY | 120 | $0.01 |
| 96 | Changeable message SN (70107025) | CAL DAY | 28 | $133.46 |
| 97 | Short term pavt mking (70300100) | LF | 17,027 | $0.01 |
| 98 | SHRT TRM pavt MK rem (70300150) | SF | 9,419 | $0.01 |
| 99 | Temp PVT MK LTR & sym paint (70300211) | SF | 397 | $0.01 |
| 100 | Temp PVT MK line 4 - paint (70300221) | LF | 2,162 | $0.01 |
| 101 | Temp PVT MK line 6 - paint (70300241) | LF | 3,983 | $0.01 |
| 102 | Temp PVT MK line 12 - paint (70300261) | LF | 2,765 | $0.01 |
| 103 | Temp PVT MK line 24 - paint (70300281) | LF | 441 | $0.01 |
| 104 | Sign panel T1 (72000100) | SF | 190 | $31.90 |
| 105 | Teles STL sin support (72800100) | LF | 368 | $26.95 |
| 106 | THPL PVT MK LTR & sym (78000100) | SF | 397 | $6.05 |
| 107 | THPL PVT MK line 4 (78000200) | LF | 2,162 | $1.65 |
| 108 | THPL PVT MK line 6 (78000400) | LF | 3,983 | $2.64 |
| 109 | THPL PVT MK line 12 (78000600) | LF | 2,765 | $3.08 |
| 110 | THPL PVT MK line 24 (78000650) | LF | 441 | $6.16 |
| 111 | Paint PVT MK line 4 (78001110) | LF | 265 | $13.20 |
| 112 | Polyurea PM T2 LTR-SY (78008300) | SF | 235 | $12.10 |
| 113 | Polyurea PM T2 LN 4 (78008310) | LF | 6,381 | $2.75 |
| 114 | Polyurea PM T2 LN 6 (78008330) | LF | 459 | $4.40 |
| 115 | Polyurea PM T2 LN 12 (78008350) | LF | 527 | $6.60 |
| 116 | Polyurea PM T2 LN 24 (78008370) | LF | 44 | $12.10 |
| 117 | GRV RCSD PM LTR & sym (78011000) | SF | 632 | $4.40 |
| 118 | GRV RCSD PVT MRKG 5 (78011025) | LF | 8,543 | $0.88 |
| 119 | GRV RCSD PVT MRKG 7 (78011035) | LF | 4,442 | $1.38 |
| 120 | GRV RCSD PVT MRKG 13 (78011065) | LF | 3,292 | $2.75 |
| 121 | GRV RCSD PVT MRKG 25 (78011125) | LF | 485 | $5.50 |
| 122 | Raised refl pavt MKR (78100100) | EACH | 138 | $82.50 |
| 123 | Raised ref PVT MK rem (78300200) | EACH | 138 | $0.01 |
| 124 | PVT MKG rem WTR blast (78300202) | SF | 2,856.70 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.